BMRR North Trail
Greenway in Alabama
Runs through Birmingham · Jefferson County
Conditions now
Loading the weather near Birmingham…
Forecast by the National Weather Service for Birmingham · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Wenonah Road Southwest mile 0 directions to trailhead 1
About this trail
The BMRR North Trail is a multiuse trail in Red Mountain Park, a park of more than 1,500 acres along the Red Mountain ridge a few minutes from downtown Birmingham, Alabama. Jefferson County Greenways, which lists the park among its greenspaces, gives the trail as 2.00 miles, rated moderate, marked in light blue, with 216 feet of elevation gain. It says all of the park's trails are multiuse and asks riders to keep hikers in mind; the park has more than 18 miles of hiking and biking trails.
The park lies on land once owned by U.S. Steel and given over to ore mines, the last of which closed in 1971. Planning began by 2004; in 2007 the Alabama Legislature made the Red Mountain Greenway and Recreational Commission a state agency with control of the park, and the park opened to the public in 2012. In OpenStreetMap the trail, numbered 17, is a 2-meter-wide gravel and dirt path of about 2.5 miles that starts at a trailhead with parking off Wenonah Road SW at the park's west end and runs east to a junction with the Shook Trail. The BMRR South Trail, also in the park, has its own page.
The park's entrances with parking are at 2011 Frankfurt Drive, the main entrance, with accessible restrooms, a pavilion and a water fountain, and at 2019 Venice Road. There is no parking or admission fee. Dogs must be on a leash on the trails, and there is no running water elsewhere in the park. Three bike repair stations are spread through the park.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
85% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February, May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Birmingham Airport, 17.2 km from the trail's middle, 66 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 59 67 75 82 88 91 91 86 76 65 57 Low °F 35 38 45 52 61 68 72 71 65 54 43 38 Precipitation, in 5 5 5.7 5.1 4.9 4.8 5.4 4.3 4 3.3 4.2 4.9 Snow, in 0.4 0.3 0.5 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 Bessemer sheet (1:125,000); the 1959 Birmingham South sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationRed Mountain Park (Jefferson County Greenways)
Nearby trails
- Redding Trail within 0.2 mi · 1.4 mi, crushed stone
- BMRR South Trail within 0.2 mi · 2.5 mi, crushed stone
- High Ore Line Trail within 0.2 mi · 3.0 mi, paved
- Shades Creek Greenway (Lakeshore Trail) 1.9 mi away · 3.9 mi, paved
- Kiwanis Vulcan Trail 2.0 mi away · 2.0 mi, paved
- Enon Ridge Trail 4.3 mi away · 1.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — Jefferson County Greenways · organization · checked Oct 16, 2026 Supports: BMRR North Trail, Red Mountain Park, 2.00 miles, moderate, light blue markings, 216 ft elevation gain, multiuse
- Red Mountain Park — Jefferson County Greenways · organization · checked Oct 16, 2026 Supports: more than 1,500 acres along the Red Mountain ridge minutes from downtown Birmingham; over 18 miles of hiking and biking trails; all trails multiuse, keep hikers in mind; entrances at 2011 Frankfurt Drive (main, accessible restrooms, pavilion, water fountain) and 2019 Venice Road; no parking or admission fee; dogs leashed on trails; no running water elsewhere; three bike repair stations
- Red Mountain Park — Wikipedia · organization · checked Oct 16, 2026 Supports: former U.S. Steel ore-mine land, last mine closed 1971; planning by 2004; Red Mountain Greenway and Recreational Commission made a state agency in control of the park in 2007; opened to the public in 2012
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: record's map line, about 2.5 miles, ref 17, 2 m wide, gravel and dirt; trailhead with parking off Wenonah Road SW; eastern junction with the Shook Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.