Redding Trail
Greenway in Alabama
Runs through Birmingham · Jefferson County
Conditions now
Loading the weather near Birmingham…
Forecast by the National Weather Service for Birmingham · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Redding Trail is a 1.4-mile path in Birmingham, Jefferson County, Alabama. The name comes from OpenStreetMap, which maps it as a path designated for bicycles and pedestrians, closed to horses, with reference number 8 and a compacted surface.
No manager page, trail map or agency page that was fetched describes the trail, so who maintains it, whether it lies within a park, and its opening date are not known. The reference number suggests it belongs to a numbered trail system, but no source naming that system was found.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
71% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February, May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Birmingham Airport, 18.2 km from the trail's middle, 95 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 59 67 75 82 88 91 91 86 76 65 57 Low °F 35 38 45 52 61 68 72 71 65 54 43 38 Precipitation, in 5 5 5.7 5.1 4.9 4.8 5.4 4.3 4 3.3 4.2 4.9 Snow, in 0.4 0.3 0.5 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 Bessemer sheet (1:125,000); the 1959 Bessemer sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- BMRR South Trail within 0.2 mi · 2.5 mi, crushed stone
- BMRR North Trail within 0.2 mi · 2.5 mi, surface unknown
- High Ore Line Trail 0.3 mi away · 3.0 mi, paved
- Shades Creek Greenway (Lakeshore Trail) 2.4 mi away · 3.9 mi, paved
- Kiwanis Vulcan Trail 3.2 mi away · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- OpenStreetMap way 616023220 — OpenStreetMap · web · checked Oct 17, 2026 Supports: name, bicycle and foot designation, horse no, ref 8, compacted surface
- OpenStreetMap relation 111031 (Birmingham boundary) — OpenStreetMap · web · checked Oct 17, 2026 Supports: city
- OpenStreetMap relation 1848781 (Jefferson County boundary) — OpenStreetMap · web · checked Oct 17, 2026 Supports: county
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.