States › North Carolina

Bolin Creek Trail

Greenway in North Carolina · OpenStreetMap relation

Runs through Chapel Hill · Orange County

Conditions now

Loading the weather near Chapel Hill…

Forecast by the National Weather Service for Chapel Hill · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Barrett Lane mile 0 directions to trailhead 1
  2. Parking at East Franklin Street mile 0.4 directions to trailhead 2
  3. Parking at Elizabeth Street mile 0.6 directions to trailhead 3
  4. Parking at Elizabeth Street mile 0.7 directions to trailhead 4
  5. Parking at Elizabeth Street mile 0.7 directions to trailhead 5
  6. Parking at Elizabeth Street mile 0.7 directions to trailhead 6
  7. Parking at Elizabeth Street mile 0.8 directions to trailhead 7
  8. Parking at Elizabeth Street mile 0.8 directions to trailhead 8
  9. Parking at Umstead Drive mile 2.2 · restrooms · water directions to trailhead 9
Creek Bolin Creek 8416 (opens in a new tab)
Creek Bolin Creek 8416 · Photo: bobistraveling · CC BY · Flickr

About this trail

The Bolin Creek Trail, which the Town of Chapel Hill also calls the Bolin Creek Greenway, is a paved town greenway along Bolin Creek in Chapel Hill, North Carolina. The town describes it as a 2.5-mile paved trail connecting the Tanyard Branch Trail and Umstead Park to the Chapel Hill Community Center.

From the Community Center end near East Franklin Street, the trail follows the creek west past Bolinwood Drive, passes under Martin Luther King Jr. Boulevard, and continues to Umstead Park on Umstead Drive. The crossing under the boulevard was long a gap of about 500 feet, where the path stopped beneath the bridge and users had to cross the road above. Wet weather, Hurricanes Florence and Dorian, and coal ash found at the police department property just north of the creek delayed the work, which resumed in October 2019; in spring 2020 the section between the boulevard and Bolinwood Drive closed for coal ash removal, with a detour on Bolinwood Drive and Hillsborough Street.

Tropical Storm Chantal damaged the trail in July 2025; it reopened in November 2025 with temporary repairs and barriers still in place. The town is designing a half-mile extension from Umstead Park along the south side of the creek, Village Drive and Umstead Drive to Estes Drive Extension, including a bridge over Tanyard Branch; the design was almost 90 percent complete in September 2026, with bidding expected in spring 2027. This record maps about 2.3 miles. OpenStreetMap shows concrete and asphalt sections, an underpass and several bridges, one of them wooden.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

74% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chapel Hill Williams Airport, 1.8 km from the trail's middle, 71 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F515563727986908882726254
Low °F323440485765696862504034
Precipitation, in3.42.83.93.63.54.44.13.84.43.23.23.4
Old maps

USGS topographic maps of the trail's middle go back to the 1946 Chapel Hill sheet (1:24,000); the 1947 Chapel Hill sheet (1:31,680) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9132651, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Bolin Creek Greenway Extension — Engage Chapel Hill (Town of Chapel Hill), updated September 30, 2026 · government source · checked Oct 16, 2026
    Supports: 2.5-mile paved trail connecting the Tanyard Branch Trail and Umstead Park to the Chapel Hill Community Center; half-mile extension from Umstead Park to Estes Drive Extension along the south side of Bolin Creek, Village Drive, Umstead Drive and an OWASA easement; bridge over Tanyard Branch; almost 90 percent designed in September 2026; bid-ready in spring 2027
  3. Town of Chapel Hill Provides Bolin Creek Trail Construction Update — Chapelboro (January 28, 2020) · web · checked Oct 16, 2026
    Supports: 500-foot gap across Martin Luther King Jr. Boulevard where the path stopped under the bridge; delays from wet weather, Hurricanes Florence and Dorian and coal ash at the police department property just north of the creek; construction resumed October 2019
  4. Bolin Creek Trail Closed Amid Coal Ash Deposit Removal — Chapelboro (April 9, 2020) · web · checked Oct 16, 2026
    Supports: section between Martin Luther King Jr. Boulevard and Bolinwood Drive closed for coal ash removal; detour on Bolinwood Drive and Hillsborough Street; connector work resumed January 2020
  5. Bolin Creek Trail has reopened — Triangle Blog Blog (November 6, 2025) · web · checked Oct 16, 2026
    Supports: closure after Tropical Storm Chantal in July 2025; town reopening announced for November 2025; temporary repairs and barriers remain
  6. Bolin Creek Trail (relation 9132651) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: concrete and asphalt surfaces; underpass; bridges including a wooden one; this record's length of about 2.3 miles from the East Franklin Street area to Umstead Drive

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.