States › Michigan

Bridge to Bay Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Fort Gratiot Township, Port Huron, Marysville, St. Clair, China Township, Marine City, Cottrellville Township, Algonac and 3 more · St. Clair County

All 11 towns and places

Fort Gratiot Township, Port Huron, Marysville, St. Clair Township, St. Clair, China Township, East China Township, Marine City, Cottrellville Township, Clay Township and Algonac

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
22.0 mi 35.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Clay Street mile 0 directions to trailhead 1
  2. Parking at Clay Street mile 0.1 directions to trailhead 2
  3. Parking at Green Street mile 0.2 directions to trailhead 3
  4. Parking at Dixie Boulevard mile 0.5 directions to trailhead 4
  5. Parking at King Road mile 6.6 directions to trailhead 5
  6. Parking at King Road mile 6.7 directions to trailhead 6
  7. Parking at Ward Street mile 7.1 directions to trailhead 7
  8. Parking at 6th Street mile 28.8 directions to trailhead 8
  9. Parking at 6th Street mile 28.8 directions to trailhead 9
  10. Parking at Quay Street mile 29 directions to trailhead 10
  11. Parking at McMorran Boulevard mile 29 directions to trailhead 11
  12. Parking at Bard Street mile 29.2 directions to trailhead 12
  13. Parking at Michigan Street mile 29.5 directions to trailhead 13
  14. Parking at Pine Grove Park Drive mile 30 directions to trailhead 14
  15. Parking at Pine Grove Park Drive mile 30.1 · restrooms directions to trailhead 15
  16. Parking at Prospect mile 30.1 · restrooms directions to trailhead 16
  17. Parking at Saint Clair Street mile 30.7 directions to trailhead 17
  18. Parking at State Street mile 30.8 · restrooms directions to trailhead 18
  19. Parking at Elmwood Street mile 30.9 directions to trailhead 19
  20. Parking at Church Street mile 31.1 · restrooms directions to trailhead 20
  21. Parking at Omar Street mile 31.3 · restrooms directions to trailhead 21
  22. Parking at Conger Street mile 31.4 · restrooms directions to trailhead 22
  23. Parking at Conger Street mile 31.4 · restrooms directions to trailhead 23
  24. Parking at Conger Street mile 31.6 · restrooms directions to trailhead 24
  25. Parking at Gratiot Avenue mile 32.7 directions to trailhead 25
  26. Parking mile 32.9 · restrooms · water directions to trailhead 26

Plan your visit

Links checked Oct 18, 2026, except those marked. Sources: Amtrak stations (USDOT BTS); Michigan DNR.

File:Blue Water Bridge and Bridge to Bay Trail - panoramio.jpg (opens in a new tab)
File:Blue Water Bridge and Bridge to Bay Trail - panoramio.jpg · Photo: Peter K. · CC BY-SA · Wikimedia Commons

About this trail

The Bridge to Bay Trail is a system of boardwalks, riverwalks, rail trails and bike paths along about 50 miles of shoreline across St. Clair County, Michigan, on Lake Huron, the St. Clair River and Lake St. Clair. It involves 13 local units of government, passes through Port Huron, Marysville, St. Clair, Marine City and Algonac, and is planned to link Lakeport State Park with Algonac State Park. The project dates from the early 1990s. A Regional Trails Board leads it, with oversight by the Friends of the St. Clair River as trail coordinator and with funding from the trail communities and several foundations.

The line mapped on this page covers about 11 miles of the southern part of the system, between Algonac State Park and the city of St. Clair. From Algonac Lions Field Park, Michigan Street leads to a shared-use rail-trail through the marsh and woodland of Algonac State Park, a 5-mile round trip; the park is open for hunting in fall and winter. Farther north, a rail-trail through a wooded corridor runs about 3.5 miles from behind the Marine City library on Parker Street to East China Township Park on Recor Road, with road crossings about a mile apart. Between East China and St. Clair the route is mostly sidepath, with short on-road stretches.

Paved sections are asphalt or concrete, and other parts of the system use bike lanes, paved shoulders and local roads. The trail's site warns that high water and flooding may close sections near Algonac State Park, leaving St. Clair River Drive (M-29), which has no bicycle facilities, as the alternative. Gaps are still being closed: a one-mile, 10-foot path on Clinton Avenue in St. Clair was due in spring 2024, St. Clair received a $209,652 federal grant in February 2026 for Riverside Avenue, and in July 2026 the county received $45,000 from SEMCOG to update its trails strategy.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Port Huron, 15 km from the trail's middle, 12 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313342546776818073604736
Low °F202028384959656457463526
Precipitation, in2.52.12.23.13.53.63.23.13.33.12.82.2
Snow, in11.111.44.60.40000001.36.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1912 Port Huron sheet (1:62,500); the 1952 St. Clair sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9767420, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Frequently Asked Questions — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: boardwalks, riverwalks, rail trails and bike paths along 50 miles of shoreline, 13 local units of government, towns, Algonac State Park to Lakeport State Park, Regional Trails Board and Friends of the St. Clair River roles, mix of road trails, sidepaths, bike lanes, paved shoulders and local routes
  3. Home — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: Lake Huron, St. Clair River and Lake St. Clair, inception in the early 1990s
  4. Who We Are — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: funding from the trail communities and foundations
  5. Algonac State Park Bike Ride — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: Algonac Lions Field Park and Michigan Street access, rail-trail through marsh and woodland, 5-mile out-and-back, hunting seasons, asphalt/concrete surface, flood closures and M-29 alternative
  6. Marine City to East China Bike Ride — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: rail-trail through a wooded corridor, 7-mile out-and-back between the Marine City library (300 S Parker St) and East China Township Park (Recor Road), road crossings about a mile apart
  7. St Clair to East China Twp Bike Ride — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: mostly sidepath with short on-road and off-road segments between East China Township and St. Clair
  8. Trail News — Bridge to Bay Trail · organization · checked Oct 15, 2026
    Supports: Clinton Avenue path (one mile, 10 feet, spring 2024), St. Clair $209,652 grant February 2026 for Riverside Avenue, $45,000 SEMCOG planning grant July 2026, remaining gaps

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.