States › Michigan

Wadhams to Avoca Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through Kenockee Township, Clyde Township (St. Clair County), Kimball Township and Port Huron Township · St. Clair County

Conditions now

Loading the weather near Ruby…

Forecast by the National Weather Service for Ruby · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
12.4 mi 20.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Main Street mile 0 · restrooms directions to trailhead 1
  2. Parking mile 2.4 directions to trailhead 2
  3. Parking at Lapeer Road mile 8.3 · restrooms directions to trailhead 3
Wadhams to Avoca Trail drawn on the 1961 USGS topographic map of Ruby, Michigan
Then: the 1961 USGS Ruby sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Wadhams to Avoca Trail is a county-owned rail-trail in St. Clair County, Michigan. It uses more than 12 miles of a historic rail line formerly owned by CSX, and the Michigan Department of Natural Resources lists it as an open, nonmotorized trail owned and administered by the county.

As its name says, the trail runs between Wadhams and Avoca. Its centerpiece is the Mill Creek Trestle, a former railroad bridge built in the late 1800s that is 640 feet long and 60 feet high. The trestle has been decked and railed for walkers and bicyclists, with four overlooks above the Mill Creek Valley.

The trail is used by walkers, cyclists and horseback riders. Designated off-road parking is at the Wadhams Road, Imlay City Road and Avoca Road trailheads; the closest parking to the trestle is near 8258 Imlay City Road in Avoca. Users are asked to be courteous to neighboring residents and cautious of vehicles where the trail meets roads.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Port Huron, 15.1 km from the trail's middle, 27 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313342546776818073604736
Low °F202028384959656457463526
Precipitation, in2.52.12.23.13.53.63.23.13.33.12.82.2
Snow, in11.111.44.60.40000001.36.7
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Flint sheet (1:250,000); the 1961 Ruby sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

4 Reddit threads about this trail, Jul 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9768229, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Statewide Railtrails layer, Wadhams To Avoca Trail — Michigan DNR open data · government source · checked Oct 15, 2026
    Supports: rail-trail; nonmotorized; open; county ownership and administration; Saint Clair County
  3. Wadhams to Avoca Trail — Thumb Coast (Blue Water Area tourism bureau) · organization · checked Oct 15, 2026
    Supports: more than 12 miles of a historic rail line formerly owned by CSX; walkers, cyclists and horseback riders; Mill Creek Trestle 640 feet long, 60 feet high, built in the late 1800s, decked and railed, four overlooks of the Mill Creek Valley; parking at Wadhams Road, Imlay City Road and Avoca Road trailheads; closest trestle parking near 8258 Imlay City Rd., Avoca; courtesy to neighboring residents and caution with on-road vehicles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.