States › California

Burbank Chandler Bikeway

Rail-trail in California · OpenStreetMap relation

Runs through Los Angeles and Burbank (Los Angeles County) · Los Angeles County

Conditions now

Loading the weather near Burbank…

Forecast by the National Weather Service for Burbank · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.0 mi 4.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Alley 87642 mile 0 directions to trailhead 1
  2. Parking at Chandler Boulevard mile 3 directions to trailhead 2
  3. Parking at Chestnut Street mile 3 directions to trailhead 3

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Chandler bike path evening burbank (opens in a new tab)
Chandler bike path evening burbank · Photo: Junkyardsparkle · CC0 · Wikimedia Commons

About this trail

The Chandler Boulevard Bike Path is a separated rail-trail along Chandler Boulevard between North Hollywood, in the city of Los Angeles, and Burbank, California; the Burbank section is called the Chandler Bikeway, and OpenStreetMap names this record the Burbank Chandler Bikeway. It follows the Southern Pacific Burbank Branch, whose railroad track ran along Chandler Boulevard until the 1980s. The Los Angeles County Metropolitan Transportation Authority (Metro) owns the corridor, and the transportation departments of Los Angeles and Burbank maintain their sections with Metro funding. In 2004 the City of Burbank converted the railroad track along Chandler Boulevard into a 2-mile path, and city officials opened it on August 20, 2004.

The path runs about 2.8 miles from Vineland Avenue in North Hollywood east to Mariposa Street in Burbank, with the city line at Clybourn Avenue. The section maintained by the Los Angeles Department of Transportation, from Vineland Avenue to Clybourn Avenue, is 0.8 miles; the Burbank section from Clybourn Avenue to Mariposa Street is 1.91 miles. The western end is close to the North Hollywood station of the Metro B Line and G Line. This record maps about 3 miles of the path.

The asphalt path has separate bicycle and pedestrian lanes, sculpture, murals, landscaping and views of the Verdugo Mountains, and the North Hollywood section has added exercise equipment, a playground and a fenced dog run. In November 2025 the Burbank City Council approved design plans for a 0.6-mile Chandler Bikeway Extension east of Mariposa Street. Because Union Pacific keeps freight operating rights on the line beyond Mariposa, the $3.3 million, federally funded extension turns onto Victory Boulevard and Cypress Avenue, using Class I and Class IV bikeway, to reach the downtown Burbank Metrolink station and the San Fernando Bikeway extension along the Burbank Western Channel. Construction was tentatively set to start in January 2027, with completion expected by the end of 2028.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Burbank Valley Pump Plt, 1.6 km from the trail's middle, 19 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F696871747580868887817568
Low °F434447505559636361544642
Precipitation, in3.64.52.80.90.40.1000.10.70.82.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Los Angeles sheet (1:62,500); the 1953 Burbank sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10531957, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Chandler Bikeway Extension Project (SCH 2025110797) — CEQAnet, State of California · government source · checked Oct 16, 2026
    Supports: 0.6-mile extension with Class I and Class IV bikeway from the existing eastern terminus at Mariposa Street to the San Fernando Bikeway extension along the Burbank Western Channel; former Union Pacific line owned by Metro; Victory Boulevard and Cypress Avenue; City of Burbank lead agency
  3. 2004 - Chandler Bikeway — Burbank in Focus, Burbank Public Library · organization · checked Oct 16, 2026
    Supports: in 2004 the City of Burbank converted a railroad track along Chandler Boulevard into a 2-mile path from Mariposa Street to the city border at Clybourn Avenue; official opening August 20, 2004
  4. Chandler Boulevard Bike Path — Wikipedia · organization · checked Oct 16, 2026
    Supports: Class I rail trail from North Hollywood to Burbank; Southern Pacific Burbank Branch track until the 1980s; 2.8 miles; Mariposa Street to Vineland Avenue, city line at Clybourn Avenue; owned by Metro, maintained by Los Angeles and Burbank transportation departments with Metro funding; near North Hollywood station (B Line, G Line); asphalt; separate bicycle and pedestrian lanes, sculpture, murals, landscaping, Verdugo Mountain views; North Hollywood improvements
  5. List of Los Angeles bike paths — Wikipedia · organization · checked Oct 16, 2026
    Supports: LADOT-maintained section Vineland Avenue to Clybourn Avenue, 0.8 miles; continues as Chandler Bikeway 1.91 miles in Burbank from Clybourn Avenue to Mariposa Street
  6. Chandler bikeway extension finally gets rolling — Burbank Leader (November 22, 2025) · press · checked Oct 16, 2026
    Supports: council approved design plans November 18, 2025; Union Pacific freight operating rights east of Mariposa; route via Victory Boulevard and Cypress Avenue to the downtown Burbank Metrolink station; $3.3 million federal grant funding; construction tentatively January 2027; completion end of 2028
  7. OpenStreetMap relation 10531957 — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: record length about 3 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.