States › California

Metro G Line Bikeway

Greenway in California · OpenStreetMap relation

Runs through Los Angeles · Los Angeles County

Conditions now

Loading the weather near Los Angeles…

Forecast by the National Weather Service for Los Angeles · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
15.2 mi 24.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Burbank Boulevard mile 0.5 directions to trailhead 1
  2. Parking at Oxnard Street mile 1.2 directions to trailhead 2
  3. Parking at Oxnard Street mile 1.2 directions to trailhead 3
  4. Parking at Aetna Street mile 1.9 directions to trailhead 4
  5. Parking at Aetna Street mile 2 directions to trailhead 5
  6. Parking at Calvert Street mile 2.2 directions to trailhead 6
  7. Parking at Calvert Street mile 2.2 directions to trailhead 7
  8. Parking at Calvert Street mile 2.4 · restrooms directions to trailhead 8
  9. Parking at Alley 90651 mile 2.4 directions to trailhead 9
  10. Parking at Alley 90651 mile 2.4 directions to trailhead 10
  11. Parking at Alley 80787 mile 2.4 directions to trailhead 11
  12. Parking at Calvert Street mile 2.5 directions to trailhead 12
  13. Parking at Lemona Avenue mile 3 directions to trailhead 13
  14. Parking at Noble Avenue mile 3.1 directions to trailhead 14
  15. Parking at Noble Avenue mile 3.1 directions to trailhead 15
  16. Parking at Alley 80781 mile 3.4 directions to trailhead 16
  17. Parking at Costco Drive mile 3.5 directions to trailhead 17
  18. Parking at Alley 80781 mile 3.5 directions to trailhead 18
  19. Sepulveda Station Parking Lot mile 3.6 directions to Sepulveda Station Parking Lot
  20. Parking at Erwin Street mile 3.6 directions to trailhead 20
  21. Parking at Haskell Avenue mile 4.2 directions to trailhead 21
  22. Parking at Lake Balboa Drive mile 4.9 directions to trailhead 22
  23. Parking at Lake Balboa Drive mile 5.1 · water directions to trailhead 23
  24. Orange Line Park & Ride - Balboa mile 5.6 directions to Orange Line Park & Ride - Balboa
  25. Parking at Birmingham High School Driveway mile 5.7 directions to trailhead 25
  26. Parking at Birmingham High School Driveway mile 5.7 directions to trailhead 26
  27. Parking at Victory Boulevard mile 5.7 directions to trailhead 27
  28. Parking at Balboa Boulevard mile 6.4 · restrooms directions to trailhead 28
  29. Parking at Oxnard Street mile 6.8 · restrooms directions to trailhead 29
  30. Parking at Oxnard Street mile 6.9 · restrooms directions to trailhead 30
  31. Parking at Victory Boulevard mile 7 · restrooms directions to trailhead 31
  32. Parking at Victory Boulevard mile 7 · restrooms directions to trailhead 32
  33. Parking at Oxnard Street mile 7 · restrooms directions to trailhead 33
  34. Parking at Oxnard Street mile 7 · restrooms directions to trailhead 34
  35. Parking at Oxnard Street mile 7 · restrooms directions to trailhead 35
  36. Parking at Oxnard Street mile 7 · restrooms directions to trailhead 36
  37. Parking at Oxnard Street mile 7 · restrooms directions to trailhead 37
  38. Parking at Victory Boulevard mile 7.1 · restrooms directions to trailhead 38
  39. Parking at Victory Boulevard mile 7.3 · restrooms directions to trailhead 39
  40. Parking at Alley 81217 mile 8.2 directions to trailhead 40
  41. Orange Line Park & Ride - Reseda mile 8.3 directions to Orange Line Park & Ride - Reseda
  42. Parking at Alley 87574 mile 8.4 directions to trailhead 42
  43. Parking at Reseda Boulevard mile 8.4 directions to trailhead 43
  44. Parking at Alley ‎80793 mile 8.4 directions to trailhead 44
  45. Orange Line Park & Ride - Reseda mile 8.5 directions to Orange Line Park & Ride - Reseda
  46. Parking at Calvert Street mile 8.5 directions to trailhead 46
  47. Parking at Topham Street mile 8.5 directions to trailhead 47
  48. Parking at Topham Street mile 8.6 directions to trailhead 48
  49. Parking at Winnetka Avenue mile 10.5 directions to trailhead 49
  50. Parking at Variel Avenue mile 11.9 directions to trailhead 50
  51. Parking at Kittridge Street mile 12 directions to trailhead 51
  52. Parking at Kittridge Street mile 12 directions to trailhead 52
  53. Orange Line Park & Ride - Canoga mile 12.2 directions to Orange Line Park & Ride - Canoga
  54. Orange Line Park & Ride - Canoga mile 12.2 directions to Orange Line Park & Ride - Canoga
  55. Parking at Eton Avenue mile 12.2 directions to trailhead 55
  56. Orange Line Park & Ride - Sherman Way mile 12.8 directions to Orange Line Park & Ride - Sherman Way
  57. Orange Line Park & Ride - Sherman Way mile 12.8 directions to Orange Line Park & Ride - Sherman Way
  58. Parking at Canoga Avenue mile 14.1 directions to trailhead 58
  59. Parking at Osborne Street mile 15.1 directions to trailhead 59

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

G Line pedestrian crossing with railroad signals.jpg (opens in a new tab)
G Line pedestrian crossing with railroad signals.jpg · Photo: Lars Smiley · Public domain · Wikimedia Commons

About this trail

The G Line Bikeway is a bicycle and pedestrian route of about 17.9 miles across the San Fernando Valley in Los Angeles, running beside the Metro G Line (until 2020 the Orange Line) bus rapid transit busway from Chatsworth station through the Sepulveda Basin to North Hollywood. Metro maintains it. The busway follows part of the Southern Pacific's former Burbank Branch, which carried passenger trains from 1904 to 1920 and Pacific Electric streetcars from 1911 to 1952. The path opened with the busway in 2005 as a 12-mile route between Warner Center and North Hollywood, and 4 miles between Canoga station and the Chatsworth train station were added in 2012.

From Chatsworth station to just east of Valley College station the route is an off-street paved path, much of it with separate lanes for cyclists and pedestrians, and riders stop where it crosses the valley's north-south streets. The last 2 miles, from between Coldwater Canyon and Fulton Avenues to North Hollywood station, are on-street bike lanes on Chandler Boulevard; the Los Angeles Department of Transportation is building the Chandler Bicycle Connection, a 3-mile protected bikeway on Chandler Boulevard, to close the gap between the G Line path and the Chandler bike paths. At Chatsworth the route meets the 1.6-mile Browns Creek Bike Path, and it connects to the bike paths of the Sepulveda Dam Recreation Area.

Metro's G Line Improvements Project is rebuilding parts of the corridor with bridges, a new aerial Van Nuys station and gated crossings, with completion expected in December 2027. Van Nuys station closed on February 21, 2025. As of September 2026 the path was closed between Tyrone Avenue and Sepulveda station, with a signed detour on Calvert, Delano and Erwin Streets, and Metro planned to extend the closure east to Woodman Avenue from December 2026 to December 2027. Work begun on September 11, 2026 is resurfacing the path and adding lighting, signs and bike parking.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Woodland Hills Pierce College, 5.2 km from the trail's middle, 21 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F707074788288959794857669
Low °F434446485357616158534642
Precipitation, in3.74.62.70.80.40.1000.10.60.82.7
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Calabasas sheet (1:62,500); the 1952 Canoga Park sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9748432, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. G Line Bikeway — Wikipedia · organization · checked Oct 15, 2026
    Supports: 17.9-mile route from Chatsworth through Sepulveda Basin to North Hollywood beside the G Line; maintained by Los Angeles Metro; opened 2005 as a 12-mile route Warner Center-North Hollywood; 4 miles Canoga-Chatsworth added 2012; Class I path from Chatsworth to east of Valley College and 2-mile on-street lane on Chandler to North Hollywood; separate bike and pedestrian lanes; stops at cross streets; Browns Creek Bike Path and Sepulveda Dam Recreation Area connections; Van Nuys station closure February 21, 2025
  3. G Line (Los Angeles Metro) — Wikipedia · organization · checked Oct 15, 2026
    Supports: busway on the former Southern Pacific Burbank Branch (passenger service 1904-1920, Pacific Electric streetcars 1911-1952); 2020 rename from Orange Line
  4. G Line Improvements — LA Metro · web · checked Oct 15, 2026
    Supports: project scope (grade separations, aerial Van Nuys station, safety features); bike path closed during construction; LADOT Chandler Bicycle Connection, a 3-mile protected bikeway on Chandler Boulevard
  5. Metro G Line Improvements Project, Virtual Community Meeting presentation (September 22, 2026) — LA Metro · web · checked Oct 15, 2026
    Supports: anticipated completion December 2027; path closed between Tyrone Avenue and Sepulveda Station with detour via Calvert, Delano and Erwin Streets; closure extension to Woodman Avenue December 2026-December 2027; path improvements begun September 11, 2026 (resurfacing, striping, lighting, wayfinding, bike racks) and temporary detours

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.