States › Iowa

Carlisle Nature Trail

Greenway in Iowa · OpenStreetMap relation

Runs through Carlisle · Warren County

Conditions now

Loading the weather near Carlisle…

Forecast by the National Weather Service for Carlisle · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.2 mi 5.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Parkview Lane mile 2.7 directions to trailhead 1
  2. Parking at South 5th Street mile 3 directions to trailhead 2
  3. Parking at Hardin Drive mile 3 directions to trailhead 3
  4. Parking at John Goodhue Road mile 3 directions to trailhead 4
Carlisle, along the trail (opens in a new tab)
Carlisle, along the trail · Photo: PopePompus · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Carlisle Nature Trail is a paved trail of about 3.2 miles through the city of Carlisle in northern Warren County, Iowa, about a dozen miles southeast of Des Moines. The 10-foot-wide trail came out of 13 years of planning, with funding from the City of Carlisle and Vision Iowa, and in June 2018 the Iowa Natural Heritage Foundation reported the unveiling of the 3.3-mile multi-use trail. At its south end it joins the Summerset Trail, which runs about 12 miles to the Banner Lakes at Summerset State Park and on to Indianola.

From the north end on County Line Road, just south of Highway 5, the off-street trail passes restorations of five native ecosystems in Scotch Ridge Nature Park, crosses a bridge over the North River, passes Carlisle Middle School and tunnels under Scotch Ridge Road. An on-street section then leads past the aquatic center to the Summerset trailhead. The trail also passes through Lindhardt Park, where parking is available off South 5th Street; there is also parking at the north end.

TrailLink lists the surface as concrete, and the route has some hills. Carlisle has long aimed to link the trail north to the Des Moines trail system. In August 2022 the Des Moines City Council approved an Iowa Department of Transportation grant agreement for the Carlisle Trail Connection, a planned 3-mile, 10-foot-wide concrete trail with a tunnel under East Army Post Road joining the Carlisle Nature Trail to the Easter Lake Spine Trail. The project was then in final design, with construction tentatively expected to start in 2023, and Carlisle and Warren County had agreed to own and maintain the segments within their jurisdictions.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 12.9 km from the trail's middle, 30 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
Old maps

USGS topographic maps of the trail's middle go back to the 1931 Indianola sheet (1:62,500); the 1954 Des Moines sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12603134, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Council Communication 22-381: IDOT grant agreement for the Carlisle Trail Connection Project - City of Des Moines (August 22, 2022) · organization · checked Oct 15, 2026
    Supports: Carlisle Trail Connection: 3-mile, 10-foot concrete trail with tunnel at E. Army Post Road between the Easter Lake Spine Trail and the Carlisle Nature Trail, final design, construction tentatively 2023, 28E agreements with Carlisle and Warren County
  3. A Trail Dream Realized - Iowa Natural Heritage Foundation (June 22, 2018) · organization · checked Oct 15, 2026
    Supports: 13 years of work, unveiling of the 3.3-mile trail, Lindhart Park and Scotch Ridge Nature Park, connection to the Summerset Trail, goal of linking to Des Moines
  4. Nature Trail Information - Carlisle Chamber of Commerce · organization · checked Oct 15, 2026
    Supports: 3.3-mile, 10-foot-wide paved trail; route from the north end through Scotch Ridge Nature Park, North River bridge, middle school, Scotch Ridge Road tunnel, on-street section past the aquatic center to the Summerset trailhead; funding from the City of Carlisle and Vision Iowa; hills; Summerset Trail about 12 miles to Banner Lakes and Indianola
  5. Carlisle Nature Trail | Iowa Trails | TrailLink · web · checked Oct 15, 2026
    Supports: Warren County, about a dozen miles southeast of Des Moines, 3.17 miles, concrete surface, parking at County Line Road south of Highway 5 and at Lindhardt Park off S 5th Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.