Carquinez Bridge Trail
Greenway in California
Runs through Vallejo and Crockett · Solano and Contra Costa counties
Conditions now
Loading the weather near Vallejo…
Forecast by the National Weather Service for Vallejo · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 6th Avenue mile 0 directions to trailhead 1
(opens in a new tab) About this trail
The Carquinez Bridge Trail is the bicycle and pedestrian path on the westbound Carquinez Bridge, also called the Alfred Zampa Memorial Bridge, which carries Interstate 80 across the Carquinez Strait between Crockett in Contra Costa County and Vallejo in Solano County, California. The crossing is two bridges: the original span opened in 1927 and was replaced in 2003 by a suspension bridge that carries westbound traffic and the path, while the 1958 eastbound span carries vehicles only. The bridge is named for Al Zampa, an ironworker who helped build the original bridge and other Bay Area toll bridges.
The 12-foot-wide path along the western side of the suspension bridge opened in May 2004, at a ribbon-cutting that kicked off that year's Bike-to-Work Week; Bay Crossings gave its length as 1.6 miles. It runs from a vista point on the Vallejo side to the Crockett end, with access from San Pablo Avenue near Merchant Street in Crockett and from Maritime Academy Drive in Vallejo. The path closed a major gap in the San Francisco Bay Trail and is a segment of the Bay Area Ridge Trail. This record maps about 2 miles, from Merchant Street in Crockett north to Constance Drive in Vallejo.
At its opening the path was open daily from sunrise to sunset to bicyclists, pedestrians and wheelchair users, with rollerblades, skateboards and dogs not allowed, and with call boxes facing the path. Caltrans designed, built and manages the bridge, with funding and oversight from the Bay Area Toll Authority; the $500 million total, paid by Regional Measure 1 bridge tolls, covered the bridge, the path and the rebuilt I-80/Crockett interchange. The Metropolitan Transportation Commission publishes counts of bicyclists and pedestrians crossing the bridge since 2016.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: September to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Martinez Wtp, 11.3 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 61 66 71 78 85 88 87 84 76 64 56 Low °F 35 37 40 42 46 50 51 50 50 46 39 35 Precipitation, in 3.9 3.8 2.7 1.3 0.6 0.2 0 0 0.1 0.8 2.1 3.8 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Carquinez Strait sheet (1:62,500); the 1952 Benicia sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- San Francisco Bay Trail within 0.2 mi · 174 mi, paved
- Benicia Bay Trail 1.2 mi away · 1.9 mi, dirt
- Napa Valley Vine Trail 2.4 mi away · 21.2 mi, paved
- George Miller Regional Trail 2.7 mi away · 1.9 mi, paved
- Blue Rock Springs Cycleway 3.2 mi away · 1.5 mi, paved
- Solano Bikeway 4.4 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Carquinez Bridge — Metropolitan Transportation Commission · government source · checked Oct 16, 2026 Supports: two bridges, 1927 original span replaced in 2003 by a suspension bridge carrying westbound traffic and the bicycle and pedestrian pathway, 1958 eastbound span vehicles only, Alfred Zampa Memorial Bridge name and Al Zampa, I-80 between Contra Costa and Solano counties, bike and pedestrian counts since 2016
- New Pedestrian/Bicycle Lane Opens on Carquinez Bridge — Bay Crossings (June 2004) · web · checked Oct 16, 2026 Supports: 12-foot-wide path on the western side, 1.6 miles, opening at a ribbon-cutting kicking off Bike-to-Work Week (May 2004), vista point in Vallejo to Crockett, access at San Pablo Avenue near Merchant Street and Maritime Academy Drive, Bay Trail gap and Bay Area Ridge Trail, sunrise-to-sunset hours and rules, call boxes, Caltrans and BATA roles, $500 million Regional Measure 1 cost
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: trail name, mapped extent of about 2 miles from Merchant Street in Crockett to Constance Drive in Vallejo
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.