Cedar Ridge Trail
Greenway in North Carolina
Runs through Raleigh · Wake County
Conditions now
Loading the weather near Raleigh…
Forecast by the National Weather Service for Raleigh · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Cedar Ridge Trail is one of the multi-use trails in William B. Umstead State Park, about 10 miles northwest of downtown Raleigh in Wake County, North Carolina. The park has 13 miles of trail open to bicycles. MTB Project describes Cedar Ridge as a 1.6-mile, doubletrack-width trail with a fine gravel surface. It starts near the Ebenezer Church Road bridge gate and climbs gradually to the park's main Reedy Creek Multiuse Trail. Just past the start it crosses Sycamore Creek, which is normally about 15 feet wide. OpenStreetMap maps a concrete ford at the crossing and marks the trail open to horses as well as walkers and cyclists.
The state park has posted a notice that, beginning June 15, segments of the Cedar Ridge, North Turkey Creek and South Turkey Creek multi-use trails will close for bridge replacement on South Turkey Creek. The notice gives no year or end date. The park's Reedy Creek entrance in Cary opens at 8 a.m. and closes between 6 and 9 p.m., depending on the season.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
88% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Raleigh Durham International Airport, 6.3 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 63 73 80 87 91 89 82 73 63 55 Low °F 32 34 40 49 58 66 70 69 63 50 40 34 Precipitation, in 3.4 2.8 4.1 3.5 3.4 3.9 5 4.7 5.2 3.4 3.3 3.4 Snow, in 2.6 1.4 0.3 0 0 0 0 0 0 0 0.1 0.8 - On the National Register
- Crabtree Creek Recreational Demonstration Area, Raleigh · historic district, listed 1995 · nomination file for Crabtree Creek Recreational Demonstration Area
- Old maps
USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesWilliam B. Umstead State Park alerts — NC State Parks
Nearby trails
- North Turkey Creek Trail within 0.2 mi · 2.6 mi, gravel
- South Turkey Creek Trail within 0.2 mi · 1.7 mi, gravel
- Crabtree Creek Trail within 0.2 mi · 17.7 mi, paved
- Reedy Creek Multi-Use Trail within 0.2 mi · 2.7 mi, gravel
- Graylyn Trail within 0.2 mi · 1.6 mi, gravel
- Reedy Creek Trail 1.2 mi away · 5.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- William B. Umstead State Park — NC State Parks · government source · checked Oct 17, 2026 Supports: Wake County, 10 miles northwest of downtown Raleigh, 13 miles of biking, Cedar Ridge MUT closure notice for South Turkey Creek bridge replacement, Reedy Creek entrance hours
- Cedar Ridge Multiuse Trail — MTB Project · web · checked Oct 17, 2026 Supports: 1.6 miles, doubletrack, fine gravel surface, start near Ebenezer Church Road bridge gate, Sycamore Creek crossing about 15 feet wide, connection to Reedy Creek Multiuse Trail, gradual climb
- OpenStreetMap way 149792679 (Cedar Ridge Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: concrete ford, bicycles, horses and foot allowed
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.