States › North Carolina

South Turkey Creek Trail

Greenway in North Carolina

Runs through Raleigh · Wake County

Conditions now

Loading the weather near Raleigh…

Forecast by the National Weather Service for Raleigh · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.8 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Adler Pass mile 0.1 directions to trailhead 1
Raleigh, along the trail (opens in a new tab)
Raleigh, along the trail · Photo: Abhiram Juvvadi · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

South Turkey Creek Trail, which North Carolina State Parks calls the South Turkey Creek Multiuse Trail, is a trail in William B. Umstead State Park open to biking, horseback riding and hiking. The park lists it as 2.8 miles one way, rated moderate and marked with red circles; the stretch mapped for this page is about 1.7 miles.

The trail connects two entrances on the south side of the park, the Ebenezer Church Road bridge gate in the southeast and the gate at Reedy Creek Road and Trenton Road. Parking is at the Ebenezer Church Road entrance, 5407 Ebenezer Church Road, from which a spur leads to the trail; there is no parking at the Reedy Creek Road and Trenton Road gate. OpenStreetMap maps the trail as gravel, with a paved bridge.

The North Carolina Department of Transportation began building a replacement bridge across Crabtree Creek on the trail on June 15, 2026, and segments of the Cedar Ridge, North Turkey Creek and South Turkey Creek multiuse trails near the bridge were closed during construction. The park's site still carried the closure notice in October 2026.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

81% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Raleigh State Univ, 5.6 km from the trail's middle, 16 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525563728087918982726255
Low °F323340495866706963514135
Precipitation, in3.62.94.23.644.94.74.75.73.93.53.7
Snow, in2.50.80.100000000.11
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Trails — William B. Umstead State Park, NC State Parks · government source · checked Oct 17, 2026
    Supports: South Turkey Creek Multiuse Trail: 2.8 miles one way, moderate, red circles, biking, bridle and hiking; closure notice still posted
  3. Construction Project on South Turkey Creek Multiuse Trail — William B. Umstead State Park, NC State Parks (June 9, 2026) · government source · checked Oct 17, 2026
    Supports: NCDOT replacement bridge across Crabtree Creek from June 15, 2026; nearby segments of Cedar Ridge, North Turkey Creek and South Turkey Creek multiuse trails closed
  4. South Turkey Creek Multiuse Trail — MTB Project · web · checked Oct 17, 2026
    Supports: endpoints at the Ebenezer Church Road bridge gate and the Reedy Creek Road and Trenton Road gate; parking at 5407 Ebenezer Church Road via a spur; no parking at the southern gate
  5. OpenStreetMap way 149785572 (South Turkey Creek Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: gravel surface; paved bridge (way 149695571); mapped length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.