Chamblee Rail Trail
Rail-trail in Georgia · OpenStreetMap relation
Runs through Chamblee · DeKalb County
Conditions now
Loading the weather near Chamblee…
Forecast by the National Weather Service for Chamblee · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Chamblee Northwest Park and Ride mile 1.2 directions to Chamblee Northwest Park and Ride
- Chamblee Southwest Park and Ride mile 1.5 directions to Chamblee Southwest Park and Ride
(opens in a new tab) About this trail
The Chamblee Rail Trail is a paved shared-use path in Chamblee, Georgia, built by the city along the abandoned Roswell Junction Railroad line and adjacent land. The City of Chamblee has worked on the project since 2000. By 2020 the trail linked Keswick Park with the Mid-City District and included a transit-oriented hub near the city's MARTA rail station.
On August 31, 2023, Urbanize Atlanta reported that the city had finished Segments 4, 5 and 6, a 0.46-mile section from Pierce Drive to Chamblee Tucker Road west of the historic downtown, and scheduled a ribbon-cutting. It put the trail's total at 1.96 miles, from Keswick Drive to Peachtree Road to Pierce Drive. Our map record covers about 2.3 miles in OpenStreetMap, including short connectors: it runs from Keswick Park southeast to Peachtree Road and New Peachtree Road, and east past the Chamblee park-and-ride lots to Pierce Drive and Peachtree Road. OpenStreetMap maps the path as concrete, with a short boardwalk and several marked street crossings.
Further growth is planned. In 2020 Chamblee received a $660,000 federal grant through the Atlanta Regional Commission for design of extensions, part of a project estimated at about $6.6 million; they included an on-street stretch along Peachtree Road from McGaw Drive to Pierce Drive and a route from Pierce Drive through the Town Center district toward the Doraville Assembly development. A trails concept developed with the PATH Foundation and Kaizen Collaborative, unveiled in 2023, proposes a wider network including a loop at the north end of the city.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Atlanta Peachtree Airport, 1.6 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 64 73 80 86 89 88 83 73 62 54 Low °F 33 36 42 49 58 66 70 69 63 51 41 36 Precipitation, in 4.6 4.5 4.7 3.9 3.8 4.7 4.7 4.5 4.1 3.4 4.2 4.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Chamblee sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Nancy Creek PATH Trail 0.4 mi away · 2.3 mi, paved
- Peachtree Creek Greenway 2.9 mi away · 1.4 mi, paved
- Chastain Park PATH Trail 4.2 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12796224, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chamblee declares next section of Rail Trail finished — Urbanize Atlanta (August 31, 2023) · web · checked Oct 16, 2026 Supports: abandoned Roswell Junction Railroad line and adjacent properties; Segments 4, 5 and 6, 0.46 miles from Pierce Drive to Chamblee Tucker Road west of downtown; total 1.96 miles from Keswick Drive to Peachtree Road to Pierce Drive; 2023 trails concept with the PATH Foundation and Kaizen Collaborative, including a loop at the north end
- Making Tracks — Simply Buckhead (August 27, 2020) · web · checked Oct 16, 2026 Supports: city working on the trail since 2000; links Keswick Park to the Mid-City District; transit-oriented hub near the MARTA station; $660,000 federal grant through the ARC for design; total project about $6.6 million; planned extensions along Peachtree Road from McGaw Drive to Pierce Drive and from Pierce Drive through the Town Center district toward the Doraville Assembly development
- Chamblee Rail Trail — OpenStreetMap relation 12796224 · web · checked Oct 16, 2026 Supports: mapped length about 2.3 miles with connectors; route from Keswick Park to Peachtree Road and New Peachtree Road, and east past the park-and-ride lots to Pierce Drive; concrete surface; boardwalk; marked crossings
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.