Peachtree Creek Greenway
Greenway in Georgia · OpenStreetMap relation
Runs through Brookhaven · DeKalb County
Conditions now
Loading the weather near Brookhaven…
Forecast by the National Weather Service for Brookhaven · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Peachtree Creek Greenway trail is a multi-use trail under construction along the North Fork Peachtree Creek in and near Atlanta, Georgia, United States, which will traverse the cities of Atlanta, Brookhaven, Chamblee, Doraville and parts of unincorporated Dekalb County. Once complete, it will connect 12 miles (19 km) from the Atlanta Beltline and PATH400 trails northward up to I-285. Some landmarks along the route will include Silverback stadium, Mercer University, CHOA & Emory and multiple schools and libraries.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Trailhead at Briarwood Court Northeast mile 0.1 directions to trailhead 1
- Parking at I-85 Access Road mile 0.2 directions to trailhead 2
- Trailhead at Corporate Boulevard Northeast mile 1.1 directions to trailhead 3
- Trailhead at North Druid Hills Road Northeast mile 1.3 directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Peachtree Creek Greenway is a planned multi-city path along the North Fork of Peachtree Creek through Atlanta, Brookhaven, Chamblee, Doraville and unincorporated DeKalb County, Georgia. Wikipedia puts the full route at about 12.3 miles and says the surface is mostly 14-foot-wide lighted concrete. Groundbreaking was in early 2018.
The finished part is the Brookhaven Model Mile, which opened in December 2019 and runs from North Druid Hills Road to Briarwood Road. Peachtree Creek Greenway, Inc., the nonprofit that advocates for the project, gives its length as 1.27 miles, paved and lighted, with three trailheads and parking at 2036 North Druid Hills Road, 1801 Corporate Boulevard NE and 1793 Briarwood Road NE. It lists hours of 6 a.m. to 11 p.m. daily, with benches and bike repair stations; cyclists are named among the intended users. Our map relation covers about 1.4 miles, close to the Model Mile, and is probably that section. Planned links reach the Atlanta BeltLine and PATH400.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Atlanta Peachtree Airport, 4.9 km from the trail's middle, 53 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 64 73 80 86 89 88 83 73 62 54 Low °F 33 36 42 49 58 66 70 69 63 51 41 36 Precipitation, in 4.6 4.5 4.7 3.9 3.8 4.7 4.7 4.5 4.1 3.4 4.2 4.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Decatur sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationPeachtree Creek Greenway, Inc.
Nearby trails
- South Peachtree Creek PATH Trail 2.5 mi away · 2.5 mi, paved
- Atlanta Beltline Trail 2.6 mi away · 19.3 mi, paved
- Chamblee Rail Trail 2.9 mi away · 2.2 mi, paved
- Beltline Access Line 3.0 mi away · 1.6 mi, paved
- Nancy Creek PATH Trail 3.4 mi away · 2.3 mi, paved
- Chastain Park PATH Trail 3.6 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14939405, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Peachtree Creek Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q48795560, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Peachtree Creek Greenway — Wikipedia · organization · checked Oct 17, 2026 Supports: cities, full planned length, surface, groundbreaking, first section, planned links
- Peachtree Creek Greenway · organization · checked Oct 17, 2026 Supports: Model Mile opening, length, surface, trailheads, hours, amenities, users
- OpenStreetMap relation 14939405, Peachtree Creek Greenway — OpenStreetMap · web · checked Oct 17, 2026 Supports: name and the mapped length of the section
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.