Clear Creek Trail
Greenway in Texas
Runs through Pearland · Harris and Brazoria counties
Conditions now
Loading the weather near Pearland…
Forecast by the National Weather Service for Pearland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
This Clear Creek Trail record covers a concrete shared-use path along Clear Creek in Pearland, Texas, built by the City of Pearland as the Green Tee Terrace Hike and Bike Trail. State accessibility records list the project as a 10-foot-wide reinforced concrete shared-use path along Clear Creek between FM 518 and Hughes Ranch Road, with construction from January 2019 to February 2020 at an estimated $3 million. Visit Pearland described the new trail as 1.5 miles long and the first to connect Brazoria and Harris counties, with benches, directional signs and a 250-foot pedestrian bridge over Clear Creek.
The trail is part of Pearland's Trail Master Plan, adopted by the City Council in 2007, and Visit Pearland presented it as one phase of the city's Clear Creek Trail, with two other phases planned to connect the Shadow Creek Sports Complex and Nature Trail to the Lower Kirby District. At the north end it connects to existing trails in several neighborhoods; at the south end a public parking area is off Pearland Parkway at the Lowe's shopping center near Broadway (FM 518). This record maps about 2.4 miles under the Clear Creek Trail name used in OpenStreetMap, from near Broadway north across the creek to the Hughes Road area.
More of the Clear Creek Trail is planned. In January 2023 the Pearland City Council updated a Transportation Alternatives project for about 10,000 feet of 10-foot-wide concrete trail along the west bank of Clear Creek from Hughes Road to the University of Houston-Clear Lake at Pearland campus, with San Jacinto-themed historical points of interest; bids were then expected in October 2024. A City of Pearland project named Clear Creek Trail, registered with the state in September 2026, lists construction from April to August 2027 at an estimated $4.7 million, including a pedestrian bridge, a parking lot, shade structures and a bike repair station.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston Clover Field, 5.7 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 65 68 74 80 86 91 93 94 90 83 73 66 Low °F 46 50 55 62 70 75 76 76 72 63 54 48 Precipitation, in 3.6 2.9 2.8 3.7 5.1 5.2 4.2 5.6 5.4 5.8 4.2 4.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1920 Mykawa sheet (1:31,680); the 1955 Pearland sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Southbelt Hike & Bike Trail 1.0 mi away · 3.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Project EABPRJB9800984, Green Tee Terrace Hike and Bike Trail — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: owner City of Pearland; along Clear Creek between FM 518 and Hughes Ranch Road; 10-foot-wide reinforced concrete shared-use path; start January 1, 2019, completion February 29, 2020; estimated cost $3,000,000; inspection complete
- Project TABS2027001577, Clear Creek Trail — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: City of Pearland project named Clear Creek Trail registered September 21, 2026; start April 12, 2027, completion August 31, 2027; estimated $4,700,000; concrete trail, parking lot, pedestrian bridge, shade structures, bike repair station
- Take a Hike or Bike Down Green Tee Terrace Trail — Visit Pearland · web · checked Oct 15, 2026 Supports: 1.5 miles; first trail to connect Brazoria and Harris counties; benches, directional signage; 250-foot pedestrian bridge over Clear Creek; north access from neighborhood trails; south parking off Pearland Parkway at the Lowe's shopping center near Broadway/FM 518; Trail Master Plan adopted 2007; two other Clear Creek Trail phases to connect Shadow Creek Sports Complex and Nature Trail to the Lower Kirby District
- Pearland releases new details for Clear Creek Trail project — Community Impact (January 27, 2023) · web · checked Oct 15, 2026 Supports: January 23, 2023 ordinance; about 10,000 feet of 10-foot-wide concrete along the west bank of Clear Creek from Hughes Road to the UH-Clear Lake at Pearland campus; Transportation Alternatives Program; San Jacinto-themed historical points of interest; bids expected October 2024
- OpenStreetMap ways for this trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: name Clear Creek Trail on the path; mapped extent of about 2.4 miles from near Broadway north across Clear Creek to the Hughes Road area
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.