Southbelt Hike & Bike Trail
Greenway in Texas
Runs through Houston and Pearland · Harris County
Conditions now
Loading the weather near Pearland…
Forecast by the National Weather Service for Pearland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Blackhawk Boulevard mile 0.9 directions to trailhead 1
- Parking at Blackhawk Boulevard mile 1.7 directions to trailhead 2
- Parking at Blackhawk Boulevard mile 2 directions to trailhead 3
- Parking at Blackhawk Boulevard mile 2.3 directions to trailhead 4
- Parking at Blackhawk Boulevard mile 3.7 directions to trailhead 5
(opens in a new tab) About this trail
The Southbelt Hike & Bike Trail is a paved recreation path in the South Belt/Ellington area of southeast Houston, Texas, owned by Harris County. The county registered a project with the Texas Department of Licensing and Regulation to remove the trail's asphalt pavement and replace it with concrete, at an estimated cost of $737,571, scheduled to run from June 1 to November 30, 2024. The trail is not on a railroad corridor.
The official trailhead is at the west end, at 10777 Blackhawk Boulevard, with parking and outdoor fitness stations. From there the trail heads south and east along the edge of a drainage canal between rows of suburban homes, crossing streets at marked crosswalks. It connects to three parks: Bishops Park and Clear Brook City Park, both managed by the Clear Brook City Municipal Utility District, and Dixie Farm Road Park at the east end, where the trail loops around a detention pond. TrailLink gives the length as 3.75 miles one way, including a 1.25-mile loop at one end; the record's map line, which follows Blackhawk Boulevard, measures about 3.7 miles.
Benches stand along the route, and the parks add seating, picnic areas and their own walking paths. Parking is also available at Clear Brook City Park (911 Blackhawk Boulevard) and at Dixie Farm Road Park.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston Clover Field, 6.1 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 65 68 74 80 86 91 93 94 90 83 73 66 Low °F 46 50 55 62 70 75 76 76 72 63 54 48 Precipitation, in 3.6 2.9 2.8 3.7 5.1 5.2 4.2 5.6 5.4 5.8 4.2 4.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Genoa sheet (1:24,000); the 1955 Friendswood sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Clear Creek Trail 1.0 mi away · 2.4 mi, paved
- Strawberry Trail 4.3 mi away · 2.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Project Details: Hike and Bike Trail - Southbelt Trail - 2023 — Texas Department of Licensing and Regulation (TABS) · government source · checked Oct 15, 2026 Supports: Harris County as owner; 10777 Blackhawk Blvd; replacement of asphalt with concrete; $737,571 estimate; June 1 to November 30, 2024
- Southbelt Hike & Bike Trail — TrailLink · web · checked Oct 15, 2026 Supports: South Belt/Ellington location; 3.75 miles with a 1.25-mile loop; official west-end trailhead with parking and fitness stations; drainage canal route; marked crosswalks; Bishops Park, Clear Brook City Park (Clear Brook City MUD), Dixie Farm Road Park and detention-pond loop; benches; parking addresses
- OpenStreetMap ways for Southbelt Hike & Bike Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped line along Blackhawk Boulevard, about 3.7 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.