Clinton River Trail connector
Greenway in Michigan
Runs through Pontiac and Auburn Hills · Oakland County
Conditions now
Loading the weather near Pontiac…
Forecast by the National Weather Service for Pontiac · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bagley Street mile 0.2 directions to trailhead 1
- Parking at Rockwell Avenue mile 0.4 directions to trailhead 2
- Parking at South Boulevard West mile 0.8 directions to trailhead 3
- Parking at Motor Street mile 0.9 directions to trailhead 4
- Parking at South Boulevard West mile 1 directions to trailhead 5
- Parking at South Boulevard West mile 1.3 directions to trailhead 6
- Parking at Howland Avenue mile 1.3 directions to trailhead 7
- Parking at Hillsmont Avenue mile 1.4 directions to trailhead 8
- Parking at South Boulevard West mile 1.5 directions to trailhead 9
- Parking at Earlmoor Boulevard mile 1.5 directions to trailhead 10
- Parking at Woodward Avenue mile 1.5 directions to trailhead 11
- Parking at Central Avenue mile 1.6 directions to trailhead 12
- Parking at South Boulevard East mile 2.2 directions to trailhead 13
- Parking at South Boulevard East mile 2.2 directions to trailhead 14
- Parking at South Boulevard East mile 2.3 directions to trailhead 15
- Parking at Bradford Street mile 2.5 directions to trailhead 16
- Parking at South Boulevard East mile 2.5 directions to trailhead 17
- Parking at South Opdyke Road mile 3.2 directions to trailhead 18
- Parking at South Opdyke Road mile 3.5 directions to trailhead 19
(opens in a new tab) About this trail
The Clinton River Trail connector is a concrete sidepath along South Boulevard in Pontiac and Auburn Hills, Michigan, named Clinton River Trail connector in OpenStreetMap. The Friends of the Clinton River Trail's map lists a 3.6-mile (5.8 km) CRT Pontiac Route in its road-to-road mileage, between the entries for I-75 to Opdyke Road and for Bagley Street. The mapped line covers about 3.3 miles (5.4 km) between Bagley Street on the west and South Opdyke Road on the east. Wikipedia reports that Pontiac received funding in 2023 for the Pike Street Clinton River Trail Connector Project, which would connect the trail at Bagley Street and Opdyke Road; the Friends list that project's construction as estimated for 2027 or 2028.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Pontiac Wwtp, 2.5 km from the trail's middle, 19 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 69 78 82 81 74 60 47 36 Low °F 17 18 26 36 49 59 63 62 54 42 32 24 Precipitation, in 2.2 1.9 2.2 2.9 3.8 3.3 3.1 3.2 2.9 2.9 3.1 2.2 Snow, in 12.1 9 4.1 0.9 0 0 0 0 0 0.1 1.7 8.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Pontiac sheet (1:62,500); the 1952 Pontiac South sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Clinton River Trail
Nearby trails
- Clinton River Trail within 0.2 mi · 11.3 mi, paved
- West Bloomfield Trail 1.5 mi away · 8.0 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Clinton River Trail — Wikipedia · organization · checked Oct 31, 2026 Supports: 2023 funding for the Pike Street Clinton River Trail Connector Project, which would connect the trail at Bagley Street and Opdyke Road
- Projects — Clinton River Trail · organization · checked Oct 31, 2026 Supports: Pike Street Connector estimated construction timeframe 2027/2028
- Clinton River Trail map, 8th edition — Friends of the Clinton River Trail · web · checked Oct 31, 2026 Supports: road-to-road mileage list includes a CRT Pontiac Route of 3.6 miles between the I-75 to Opdyke Rd entry and the Bagley St entry
- Clinton River Trail connector — OpenStreetMap way 1465728133 · web · checked Oct 31, 2026 Supports: the mapped line: ways named Clinton River Trail connector tagged highway=cycleway, cycleway=sidepath, surface=concrete, along South Boulevard
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.