Clinton River Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Pontiac, Auburn Hills, Rochester Hills and Rochester · Oakland County
Conditions now
Loading the weather near Rochester Hills…
Forecast by the National Weather Service for Rochester Hills · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Riverbank Drive mile 0.4 · restrooms directions to trailhead 1
- Parking at Riverbank Drive mile 0.5 directions to trailhead 2
- Parking at Hess Street mile 1.4 directions to trailhead 3
- Parking at Rockwell Avenue mile 1.6 directions to trailhead 4
- Parking at Bagley Street mile 1.6 directions to trailhead 5
- Parking at Maple Street mile 1.7 directions to trailhead 6
- Parking at Bagley Street mile 1.8 directions to trailhead 7
- Parking at Bagley Street mile 1.9 directions to trailhead 8
- Parking at Orchard Lake Road mile 1.9 directions to trailhead 9
- Parking at West Pike Street mile 2 directions to trailhead 10
- Lot 9 mile 2.2 directions to Lot 9
- Parking at West Lawrence Street mile 2.2 directions to trailhead 12
- Parking at Wayne Street mile 2.2 directions to trailhead 13
- Parking at East Lawrence Street mile 2.3 directions to trailhead 14
- Parking at North Perry Street mile 2.3 directions to trailhead 15
- Parking at South Mill Street mile 2.4 directions to trailhead 16
- Parking at Water Street mile 2.4 directions to trailhead 17
- Parking at Water Street mile 2.4 directions to trailhead 18
- Parking at Woodward Avenue mile 2.4 directions to trailhead 19
- Parking at South Perry Street mile 2.4 directions to trailhead 20
- Parking at South Perry Street mile 2.4 directions to trailhead 21
- Parking at Union Street mile 2.5 directions to trailhead 22
- Parking at Hill Street mile 2.6 directions to trailhead 23
- Parking at Mechanic Street mile 2.6 directions to trailhead 24
- Parking at Mechanic Street mile 2.6 directions to trailhead 25
- Parking at Hill Street mile 2.6 directions to trailhead 26
- Parking at Mechanic Street mile 2.9 directions to trailhead 27
- Parking at Chandler Street mile 3.2 directions to trailhead 28
- Parking at North Ardmore Street mile 3.2 directions to trailhead 29
- Parking at South Edith Street mile 3.3 directions to trailhead 30
- Parking at North Marshall Street mile 3.4 directions to trailhead 31
- Parking at South Opdyke Road mile 4.9 directions to trailhead 32
- Parking at Bloomfield Village Boulevard mile 5.7 directions to trailhead 33
- Parking at Auburn Court mile 5.7 directions to trailhead 34
- Parking at Auburn Court mile 5.8 directions to trailhead 35
- Parking at Primary Street mile 6.3 directions to trailhead 36
- Parking at South Squirrel Road mile 6.3 directions to trailhead 37
- Parking at Primary Street mile 6.4 directions to trailhead 38
- Parking at Auburn Road mile 6.5 directions to trailhead 39
- Parking at Primary Street mile 6.5 directions to trailhead 40
- Parking at Parkways Boulevard mile 6.6 directions to trailhead 41
- Parking at Parkways Boulevard mile 6.6 directions to trailhead 42
- Parking at Auburn Road mile 6.7 directions to trailhead 43
- Parking at Cherryland Street mile 6.7 directions to trailhead 44
- Parking at Auburn Road mile 6.8 directions to trailhead 45
- Parking at Auburn Road mile 6.8 directions to trailhead 46
- Parking at Trailway Commons Circle mile 6.9 directions to trailhead 47
- Parking at South Adams Road mile 7.5 directions to trailhead 48
- Parking at South Adams Road mile 7.6 directions to trailhead 49
- Parking at South Adams Road mile 7.6 · restrooms directions to trailhead 50
- Leach Road Trailhead Parking Lot mile 7.7 · restrooms · water directions to Leach Road Trailhead Parking Lot
- Parking at South Adams Road mile 7.9 directions to trailhead 52
- Parking at Avon Industrial Drive mile 9.1 directions to trailhead 53
- Parking at Crooks Road mile 9.2 directions to trailhead 54
- Parking at South Livernois Road mile 10.4 directions to trailhead 55
- Eagle's Landing Kayak & Canoe Launch Site mile 10.6 · restrooms · water directions to Eagle's Landing Kayak & Canoe Launch Site
- Parking at South Livernois Road mile 10.6 · restrooms · water directions to trailhead 57
- Parking at South Livernois Road mile 10.6 · restrooms · water directions to trailhead 58
- Parking at West Avon Road mile 10.8 directions to trailhead 59
- Parking at West Avon Road mile 10.9 directions to trailhead 60
- Parking at Diversion Street mile 11.9 directions to trailhead 61
- Parking at South Main Street mile 11.9 directions to trailhead 62
- Parking at Diversion Street mile 11.9 directions to trailhead 63
- Parking at Diversion Street mile 11.9 directions to trailhead 64
- Parking at South Main Street mile 12 directions to trailhead 65
- Parking at Mill Street mile 12.1 directions to trailhead 66
- Parking at East 2nd Street mile 12.5 directions to trailhead 67
- Parking at Letica Drive mile 12.6 directions to trailhead 68
- Parking at Dequindre Road mile 14.1 directions to trailhead 69
(opens in a new tab) About this trail
The Clinton River Trail is a multi-use rail-trail in Oakland County, Michigan. The Friends of the Clinton River Trail, a volunteer nonprofit, describe it as 16 miles (26 km) long, passing through Sylvan Lake, Pontiac, Auburn Hills, Rochester Hills and Rochester. Each of the five cities owns and maintains its own portion; the Friends coordinate standards and promote the trail but have no direct responsibility for maintenance. The trail follows the former Michigan Air Line railroad, built around 1880. Wikipedia reports that the Grand Trunk Western acquired the Pontiac-to-Rochester track that year and that the line was abandoned in 1998, with the rails removed in 1999; the Friends' map says the tracks were removed in 1998. Auburn Hills bought its 2.1-mile (3.4 km) section in late 1999, and the trail officially opened in spring 2004.
The line mapped here covers about 11.3 miles (18.2 km), shorter than the Friends' figure, from Telegraph Road in Pontiac east to Dequindre Road. Wikipedia places the West Bloomfield Trail at the west end of the trail and the Macomb Orchard Trail at the east end. The Friends call the Pike Street Connector the final phase of connecting the trail within Pontiac via downtown, with construction estimated for 2027 or 2028; Wikipedia reports that Pontiac received funding for it in 2023. The Friends describe the trail as a critical part of two cross-state trails, the Iron Belle Trail and Great Lake-to-Lake Trails Route 1.
Wikipedia gives the surface as asphalt and gravel, and the Friends describe it as flat, level and open year-round. A bridge over I-75 opened in fall 2003, and a bridge over Telegraph Road was built in 2012. In Rochester, the Friends list repairs of two washouts as completed, one near Diversion Street in August 2026 and one west of Dequindre Road in October 2026, after closures there.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 81% of this route as a trail on former railroad right-of-way.
- Shade
30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Pontiac Wwtp, 4.4 km from the trail's middle, 9 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 69 78 82 81 74 60 47 36 Low °F 17 18 26 36 49 59 63 62 54 42 32 24 Precipitation, in 2.2 1.9 2.2 2.9 3.8 3.3 3.1 3.2 2.9 2.9 3.1 2.2 Snow, in 12.1 9 4.1 0.9 0 0 0 0 0 0.1 1.7 8.1 - On the National Register
- Pontiac Commercial Historic District (Boundary Increase), Pontiac · historic district, listed 1989 · nomination file for Pontiac Commercial Historic District (Boundary Increase)
- Pontiac Commercial Historic District, Pontiac · historic district, listed 1984 · nomination file for Pontiac Commercial Historic District
- Franklin Boulevard Historic District, Pontiac · historic district, listed 1983 · nomination file for Franklin Boulevard Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1908 Rochester sheet (1:62,500); the 1952 Rochester sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Clinton River Trail
- RedditSearch Reddit: r/Michigan
Nearby trails
- West Bloomfield Trail within 0.2 mi · 8.0 mi, gravel
- Clinton River Trail connector within 0.2 mi · 3.3 mi, paved
- Macomb Orchard Trail within 0.2 mi · 23.7 mi, paved
- Shelby Metro Bike Trail within 0.2 mi · 3.0 mi, paved
- Clinton River Trail Rustic Detour within 0.2 mi · 1.3 mi, crushed stone
- Paint Creek Trail 0.6 mi away · 8.9 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 272100, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “Open”
- Official trail website · Official site · checked Oct 31, 2026
- Clinton River Trail — Friends of the Clinton River Trail · organization · checked Oct 31, 2026 Supports: 16-mile multi-use trail; Sylvan Lake, Pontiac, Auburn Hills, Rochester Hills and Rochester; Friends are a volunteer nonprofit that works with the cities, county and community to coordinate standards and encourage use; the trail is a critical part of two cross-state trails, the Iron Belle Trail and Great Lake-to-Lake Trails Route #1
- The Cities — Clinton River Trail · organization · checked Oct 31, 2026 Supports: the five cities each own and maintain their portions; the Friends have no direct authority or responsibility for maintenance
- Projects — Clinton River Trail · organization · checked Oct 31, 2026 Supports: Pike Street Connector as the final phase of connecting the trail within Pontiac via downtown, construction estimated 2027/2028; Rochester Washout 2 (near Diversion St) repairs completed August 2026; Washout 1 (west of Dequindre Rd) repairs completed October 2026 after closure
- Clinton River Trail — Wikipedia · organization · checked Oct 31, 2026 Supports: Michigan Air Line Railway; 1880 track between Pontiac and Rochester acquired by the Grand Trunk Western; abandoned 1998 and rails removed 1999; I-75 bridge opened fall 2003; trail officially opened spring 2004; Telegraph Road bridge built 2012; 2023 funding for the Pike Street Clinton River Trail Connector Project; asphalt and gravel surface; West Bloomfield Trail at the west and Macomb Orchard Trail at the east
- The Clinton River Trail: How it Started — City of Auburn Hills · organization · checked Oct 31, 2026 Supports: the city council bought its 2.1-mile section in late 1999
- Clinton River Trail map, 8th edition — Friends of the Clinton River Trail · web · checked Oct 31, 2026 Supports: railroad built around 1880 and originally known as the Michigan Air Line; tracks removed in 1998; open year-round, flat and level trail surface
- Clinton River Trail — OpenStreetMap relation 272100 · web · checked Oct 31, 2026 Supports: the mapped line: route relation named Clinton River Trail, ref CRT, tagged hiking and bicycle, with the Friends' website
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.