States › Michigan

Macomb Orchard Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through Shelby Township (Macomb County), Washington Township (Macomb County), Romeo, Bruce Township (Macomb County), Armada Township, Armada, Richmond Township (Macomb County) and Richmond · Macomb County

Conditions now

Loading the weather near Romeo…

Forecast by the National Weather Service for Romeo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Macomb County.2

Length
23.7 mi 38.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Division Road mile 0 · restrooms · water directions to trailhead 1
  2. Parking at Division Road mile 0.1 · restrooms · water directions to trailhead 2
  3. Parking at Division Road mile 0.1 · restrooms · water directions to trailhead 3
  4. Parking at Armada Ridge Road mile 2.5 · restrooms directions to trailhead 4
  5. Parking at Depot mile 6.8 directions to trailhead 5
  6. Parking at Fulton Street mile 6.9 directions to trailhead 6
  7. Parking at Powell Road mile 12 directions to trailhead 7
  8. Parking at Clinton Street mile 13.5 directions to trailhead 8
  9. Parking at Van Dyke Road mile 14.9 directions to trailhead 9
  10. Parking at Van Dyke Road mile 18.6 directions to trailhead 10
  11. Parking at West Road mile 19.4 · restrooms directions to trailhead 11
  12. Parking at 25 Mile Road mile 21.7 directions to trailhead 12
  13. Parking at 25 Mile Road mile 21.7 directions to trailhead 13
  14. Parking at Shelby Road mile 21.8 directions to trailhead 14
  15. Parking at 25 Mile Road mile 21.8 directions to trailhead 15
  16. Parking at Horseshoe Drive mile 21.8 directions to trailhead 16
  17. Parking at Horseshoe Drive mile 21.8 directions to trailhead 17
  18. Parking at 25 Mile Road mile 21.9 directions to trailhead 18
  19. Parking at 25 Mile Road mile 21.9 directions to trailhead 19
Romeo, along the trail (opens in a new tab)
Romeo, along the trail · Photo: Andrew Jameson · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Macomb Orchard Trail is a paved rail-trail across northern Macomb County, Michigan. Macomb County gives it as 24 miles (39 km), from Dequindre Road at 24 Mile Road in Shelby Township to Division Road at Main Street in Richmond, through Shelby Township, Washington Township, Romeo, Armada and the City of Richmond; the mapped line covers about 23.7 miles (38.2 km). It follows the former Michigan Air Line Railroad, which first connected Romeo and Richmond in 1871 and later became part of the Grand Trunk Western Railroad. The Macomb Orchard Trail Commission, formed in July 2002 under an interlocal agreement, is composed of Macomb County, the Huron-Clinton Metroparks and the communities along the trail, and was charged with acquiring the abandoned railroad and converting it into a trail. In 2011 the last nine miles (14 km), in Armada and Richmond, were being paved, and a county commissioners' page dates the paved trail's completion to 2011.

The county describes urban landscapes, wide open spaces, tree canopy, small towns, orchards and farms along the route. At Dequindre Road the trail connects to Oakland County and the Clinton River Trail, and leads into Rochester to Paint Creek. The county says it connects users to more than 180 miles (290 km) of regional non-motorized trails.

The surface is asphalt and concrete, and the county lists benches, bike repair stations, parking and restrooms. Class 1 and Class 2 e-bikes are allowed at no more than 10 mph; Class 3 e-bikes are prohibited for general use. In 2020 the county added stop signs, road-name signs and crossing signs, and in 2021 it was placing half-mile markers starting from Dequindre Road. The county's trail page lists a closure between Dequindre Road and 24 Mile Road from April 20 for the Great Lakes Water Authority's relocation of a 96-inch water transmission main; the authority's project page includes trail reconstruction on that stretch.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 99% of this route as a trail on former railroad right-of-way.

Shade

23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Richmond 4 NNW, 15 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303342566878838073604635
Low °F161625364758625952413223
Precipitation, in2.41.92.13.23.83.63.93.33.5332.4
Snow, in10.813.36.12.60000003.510.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Armada sheet (1:62,500); the 1952 Armada sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 272055, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. Macomb Orchard Trail — Macomb County · organization · checked Oct 31, 2026
    Supports: 24-mile path along a former railroad; Shelby Township, Washington Township, Romeo, Armada and the City of Richmond; endpoints Dequindre Road and 24 Mile Road (Shelby Township) and Division Road at Main Street (Richmond); asphalt and concrete; benches, bike repair stations, parking, restrooms; Class 1 and 2 e-bikes allowed, Class 3 prohibited for general use, 10 mph limit; connects users to more than 180 miles of regional non-motorized trail networks; closure between Dequindre and 24 Mile Road beginning Monday, April 20, for the Great Lakes Water Authority's 96-inch water main relocation (no year given)
  4. Macomb Orchard Trail donations — Macomb County · organization · checked Oct 31, 2026
    Supports: urban landscapes, wide open spaces, tunnels of tree canopy, small towns, orchards and farms
  5. Macomb Orchard Trail Commission — Macomb County Executive · organization · checked Oct 31, 2026
    Supports: commission formed in July 2002; origin an interlocal agreement; charged with acquiring and converting the abandoned railroad into a trail; composed of Macomb County, Huron-Clinton Metroparks and the communities along the trail
  6. Commissioner Grot Appointed to Macomb Orchard Trail Commission — Macomb County Board of Commissioners (August 3, 2023) · organization · checked Oct 31, 2026
    Supports: follows the route of the Michigan Air Line Railroad, which first linked Romeo and Richmond in 1871 and later became part of the Grand Trunk Western Railroad; paved path complete since 2011
  7. Macomb Orchard Trail — Wikipedia · organization · checked Oct 31, 2026
    Supports: connects to the Clinton River Trail at Dequindre Road
  8. 96-Inch Main Relocation — Great Lakes Water Authority · organization · checked Oct 31, 2026
    Supports: water transmission main installation and trail reconstruction from Dequindre Road to south of 24 Mile Road in Shelby Township
  9. Come walk – or run, skate or bike – across Macomb County and beyond — Metromode (June 30, 2011) · web · checked Oct 31, 2026
    Supports: final nine miles being laid in Armada and Richmond in summer 2011; connects to Oakland County at Dequindre Road and leads into Rochester to Paint Creek
  10. Biking, hiking, and handcycling: Macomb County's thriving trail system attracts users of all stripes — Metromode (May 31, 2021) · web · checked Oct 31, 2026
    Supports: county installed stop signs, road name signs and trail crossing signs the previous year; half-mile safety markers placed every half mile starting at Dequindre Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.