States › Michigan

Conner Creek Greenway

Greenway in Michigan

Runs through Detroit · Wayne County

Conditions now

Loading the weather near Detroit…

Forecast by the National Weather Service for Detroit · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Sanford Street mile 0 directions to trailhead 1
  2. Parking at Conner Street mile 0 directions to trailhead 2
  3. Parking at Conner Street mile 0.3 directions to trailhead 3
File:Conner-creek.JPG (opens in a new tab)
File:Conner-creek.JPG · Photo: Fishtoes2000 at English Wikipedia · CC BY · Wikimedia Commons

About this trail

The Conner Creek Greenway is a planned nine-mile bicycle and pedestrian route on Detroit's east side, following the course of the historic Conner Creek from Eight Mile Road south to the Detroit River. The Detroit Eastside Community Collaborative (DECC) started the project, and a green-jobs workforce-training program led by the Greening of Detroit maintains it. DECC's site gives conflicting figures for how much is built: seven of the nine miles in one passage and almost five in another.

The first phase, the Milbank Greenway between Van Dyke and Conner near Eight Mile Road, was built on an abandoned railroad right-of-way. Other completed sections include a path from Conner Playfield (Conner and Harper) to Coleman A. Young International Airport, bike lanes on St. Jean from Mack to Jefferson, and paths along Conner and Clairpointe south of Jefferson. In April 2011 Model D reported that more than two miles of trail had opened, bringing the total built since 2006 to about 4.5 miles, with a celebration planned at Maheras Gentry Park on the Detroit River.

The mapped record covers about 1.4 miles of paved path, and is one piece of the longer route. DECC's page does not name a surface for the sections it describes.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Detroit City Airport, 1.4 km from the trail's middle, 4 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323545587079848174614837
Low °F202128395060656456453426
Precipitation, in1.41.422.83.53.13.23.13.12.32.21.7
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Grossepoint sheet (1:62,500); the 1952 Grosse Pointe sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Conner Creek Greenway - Detroit Eastside Community Collaborative · organization · checked Oct 18, 2026
    Supports: nine-mile route, Eight Mile Road to Detroit River, DECC, Milbank Greenway on abandoned railroad right-of-way, completed sections, maintenance, conflicting mileage
  3. Conner Creek Greenway extension adds two miles of pedestrian trails - Model D · web · checked Oct 18, 2026
    Supports: April 2011: more than two miles opened, about 4.5 miles built since 2006, Maheras Gentry Park, full path nine miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.