States › Michigan

Detroit Riverwalk

Greenway in Michigan

Runs through Detroit · Wayne County

Conditions now

Loading the weather near Detroit…

Forecast by the National Weather Service for Detroit · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.8 mi 6.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mount Elliott Street mile 0.5 directions to trailhead 1
  2. Parking at Wight Street mile 0.5 directions to trailhead 2
  3. Parking at USCG mile 0.5 · restrooms directions to trailhead 3
  4. Parking at USCG mile 0.5 · restrooms directions to trailhead 4
  5. Parking at East Harbortown Drive mile 0.6 directions to trailhead 5
  6. Parking at Wight Street mile 0.6 directions to trailhead 6
  7. Parking at East Harbortown Drive mile 0.8 directions to trailhead 7
  8. Parking at McDougall Street mile 1.2 directions to trailhead 8
  9. Parking at McDougall Street mile 1.2 directions to trailhead 9
  10. Parking at Joseph Campau Street mile 1.4 directions to trailhead 10
  11. Parking at Atwater Street mile 1.4 directions to trailhead 11
  12. Parking at Guoin Street mile 1.7 directions to trailhead 12
  13. Parking at Atwater Street mile 1.8 directions to trailhead 13
  14. Parking at Atwater Street mile 1.8 directions to trailhead 14
  15. Parking at Atwater Street mile 1.9 · restrooms · water directions to trailhead 15
  16. Parking at Atwater Street mile 1.9 · restrooms · water directions to trailhead 16
  17. Parking at Atwater Street mile 1.9 · restrooms · water directions to trailhead 17
  18. Parking at Orleans Street mile 2 directions to trailhead 18
  19. Parking at Atwater Street mile 2 directions to trailhead 19
  20. Parking at Atwater Street mile 2.1 · restrooms · water directions to trailhead 20
  21. Parking at Atwater Street mile 2.3 · restrooms · water directions to trailhead 21
  22. GM Lot mile 2.5 directions to GM Lot
  23. Parking at Atwater Street mile 2.7 directions to trailhead 23
  24. Marriott Valet mile 2.9 directions to Marriott Valet
  25. Parking at Detroit-Windsor Tunnel mile 2.9 directions to trailhead 25
  26. Parking at Bates Street mile 3 directions to trailhead 26
  27. Parking at Atwater Street mile 3 directions to trailhead 27
  28. Parking at Atwater Street mile 3 directions to trailhead 28
  29. Parking at Steve Yzerman Drive mile 3.6 directions to trailhead 29
  30. Parking at West Jefferson Avenue mile 3.6 directions to trailhead 30
  31. Parking at West Jefferson Avenue mile 3.6 directions to trailhead 31
  32. Parking at 6th Street mile 3.8 directions to trailhead 32
Detroit Riverwalk Path with Jogger (opens in a new tab)
Detroit Riverwalk Path with Jogger · Photo: jjes84 · CC BY 4.0 · Flickr

About this trail

The Detroit RiverWalk is a promenade along the Detroit River in Detroit, Michigan, developed and managed by the Detroit Riverfront Conservancy, a nonprofit formed in 2003 to open the riverfront to the public. The first phase, including Cullen Plaza and about two miles of the east riverfront, opened in 2007. The Conservancy gives the length as almost five miles, with a goal of 5.5.

The east end is Gabriel Richard Park, beside the MacArthur Bridge to Belle Isle. The route passes Mt. Elliott Park, Milliken State Park and GM Plaza beside the Renaissance Center, and Hart Plaza. In October 2025 the walk was extended west to Ralph C. Wilson, Jr. Centennial Park, which connects to the Southwest Greenway toward Michigan Central. The Dequindre Cut Greenway joins it from the north. This record maps about 3.8 miles of the whole.

Non-motorized travel, including bicycles, is allowed, and Wikipedia describes separate lanes for pedestrians and wheeled traffic. Cyclists yield to pedestrians, and e-bikes and e-scooters faster than 7 mph are prohibited. The RiverWalk and its parks are open 6 a.m. to 10 p.m. Bicycle rentals are available at several points.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Detroit City Airport, 8.9 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323545587079848174614837
Low °F202128395060656456453426
Precipitation, in1.41.422.83.53.13.23.13.12.32.21.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Detroit sheet (1:62,500); the 1954 Detroit sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. The Riverwalk — Detroit RiverFront Conservancy · organization · checked Oct 18, 2026
    Supports: managing organization, formed 2003, length, endpoints, bicycles allowed, Southwest Greenway link, rentals
  3. Rules & Guidelines — Detroit RiverFront Conservancy · organization · checked Oct 18, 2026
    Supports: yielding to pedestrians, 7 mph electric limit, hours 6 a.m. to 10 p.m.
  4. Detroit International RiverWalk — Encyclopedia of Detroit (Detroit Historical Society) · organization · checked Oct 18, 2026
    Supports: 2007 opening of first phase with about two miles, Hart Plaza, Milliken State Park and GM Plaza
  5. Detroit International Riverfront — Wikipedia · organization · checked Oct 18, 2026
    Supports: separate lanes for pedestrians and wheeled traffic, October 2025 extension to Centennial Park, Dequindre Cut link, Mt. Elliott and Gabriel Richard parks
  6. OpenStreetMap · web · checked Oct 18, 2026
    Supports: length of the portion mapped in this record

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.