States › Florida

Cross Campus Greenway

Greenway in Florida · OpenStreetMap relation

Runs through Gainesville · Alachua County

Conditions now

Loading the weather near Gainesville…

Forecast by the National Weather Service for Gainesville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Labeled as "Bicycle route" and/or "Shared use path"

Length
2.5 mi 4.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Southwest 36th Terrace mile 0.3 directions to trailhead 1
  2. Parking at Hull Road mile 0.4 directions to trailhead 2
  3. Parking at Hull Road mile 0.4 directions to trailhead 3
  4. Parking at Hull Road mile 0.4 directions to trailhead 4
  5. Parking at Hull Road mile 0.5 directions to trailhead 5
  6. Southwest Rec Center Parking mile 0.9 · water directions to Southwest Rec Center Parking
  7. North Lacrosse Parking mile 1 directions to North Lacrosse Parking
  8. Parking at Hull Road mile 1 directions to trailhead 8
  9. Parking at Ballpark Way mile 1.2 directions to trailhead 9
  10. Parking at Hull Road mile 1.2 directions to trailhead 10
  11. Parking at Hull Road mile 1.3 directions to trailhead 11
  12. Parking at Mowry Road mile 1.4 directions to trailhead 12
  13. Parking at Hull Road mile 1.4 directions to trailhead 13
  14. Parking at Southwest 23rd Drive mile 1.4 directions to trailhead 14
  15. Parking at Mowry Road mile 1.5 directions to trailhead 15
  16. IFAS Parking mile 1.6 directions to IFAS Parking
  17. IFAS Parking mile 1.6 directions to IFAS Parking
  18. Parking at Sabal Palm Drive mile 1.6 directions to trailhead 18
  19. Parking at Mowry Road mile 1.7 directions to trailhead 19
  20. Cancer Genetics Parking mile 1.8 directions to Cancer Genetics Parking
  21. Pony Field Parking mile 1.9 directions to Pony Field Parking
  22. Parking at Gale Lemerand Drive mile 2.1 directions to trailhead 22
  23. Parking at Sweetwater Drive mile 2.2 · water directions to trailhead 23
  24. Black Hall Parking mile 2.3 · water directions to Black Hall Parking
  25. Parking at Center Drive mile 2.4 directions to trailhead 25
  26. Service Vehicle Parking mile 2.6 directions to Service Vehicle Parking
  27. Parking at Newell Drive mile 2.6 directions to trailhead 27
  28. Parking at Museum Road mile 2.6 · water directions to trailhead 28
  29. Parking at Newell Drive mile 2.6 directions to trailhead 29
Cross Campus Greenway (opens in a new tab)
Photo: pkoby · CC BY-SA 4.0 · Mapillary

About this trail

The Cross Campus Greenway is a paved shared-use path of about 2.5 miles across the University of Florida campus in Gainesville. It is not a rail-trail. The Florida Department of Transportation built it in two phases with Transportation Alternatives Program funds, at a cost reported at about $4 million: the first phase ran from the UF Hilton driveway on 34th Street to the east side of Gale Lemerand Drive and was due to open in November 2015, and the second continued to the intersection of Newell Drive and Archer Road. A ribbon-cutting was held on May 7, 2016, at Bartram Carr Woods on Newell Drive. University planners described the path as fixing sidewalks and paths that were too narrow for bicyclists and pedestrians, and filling gaps.

The greenway runs from Southwest 34th Street at Hull Road to Newell Drive and Archer Road, passing along the southern edge of the Bartram-Carr woods rather than through them. OpenStreetMap maps it as asphalt and concrete cycleway, with its west end near Southwest 38th Terrace and Hull Road. The university presented it in 2016 alongside the Depot Trail upgrade and new portions of the Archer Braid Trail, as part of a cross-county trail from Archer to Hawthorne.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gainesville Regional Airport, 10 km from the trail's middle, 12 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F677176828790919088827569
Low °F434650566370727269615145
Precipitation, in3.32.73.52.73.17.66.76.452.71.82.9
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Arredondo sheet (1:62,500); the 1966 Gainesville East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6336252, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Cross Campus Greenway opens May 7 with ceremony — University of Florida News (April 25, 2016) · organization · checked Oct 17, 2026
    Supports: name; route from SW 34th Street at Hull Road to Newell Drive and SW Archer Road; FDOT funding; May 7 ribbon-cutting at Bartram Carr Woods on Newell Drive; Depot Trail upgrade, Archer Braid Trail and the Archer-to-Hawthorne trail
  3. Campus Greenway Project Clears Path For Safe Travel — WUFT (November 9, 2015) · organization · checked Oct 17, 2026
    Supports: 2.5-mile shared use path; two phases and their limits; phase one opening about a week after publication; about $4 million; FDOT Transportation Alternatives Program; narrow sidewalks and gaps; route along the southern edge of the Bartram-Carr woods
  4. Cross Campus Greenway (relation 6336252) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: asphalt and concrete cycleway; west end near SW 38th Terrace and Hull Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.