States › Florida

Downtown Connector Rail-Trail

Rail-trail in Florida · OpenStreetMap relation

Runs through Gainesville · Alachua County

Conditions now

Loading the weather near Gainesville…

Forecast by the National Weather Service for Gainesville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Downtown Connector Rail-Trail (opens in a new tab)
Photo: pkoby · CC BY-SA 4.0 · Mapillary

About this trail

The Downtown Connector Rail-Trail is a paved path of about 1.7 miles in Gainesville, Florida, between Boulware Springs Park, the western trailhead of the Gainesville-to-Hawthorne State Trail, and Depot Park on the south side of downtown. The Florida Department of Environmental Protection's overview of the Florida Park Service's Northeast District trail system calls it the Downtown Connector Trail. It says the trail gives bicycle and pedestrian access between the heart of downtown Gainesville, Depot Park, the state trail and Paynes Prairie Preserve State Park, and that the Depot Park area is a designated Trail Town.

From Boulware Springs the path runs under tree canopy, with access to the trails of Sweetwater Preserve, and crosses several streets, the busiest at Williston. It crosses Sweetwater Branch and joins the Depot Park trail. At Depot Park it meets the Depot Avenue Rail-Trail, which connects onward to the Waldo Road Greenway, and the University of Florida Campus Greenway runs west from the park to the campus.

TrailLink counts the connector as part of the Gainesville-Hawthorne State Park Trail and gives that trail's western end as Depot Park at 874 SE 4th Street. OpenStreetMap maps the connector as an asphalt path designated for bicycles and pedestrians, closed to motor vehicles, with one bridge.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Shade

48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gainesville Regional Airport, 7.5 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F677176828790919088827569
Low °F434650566370727269615145
Precipitation, in3.32.73.52.73.17.66.76.452.71.82.9
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Arredondo sheet (1:62,500); the 1966 Gainesville East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2117058, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Northeast District Trail System overview — Florida Department of Environmental Protection · government source · checked Oct 16, 2026
    Supports: name Downtown Connector Trail; bicycle and pedestrian access between downtown Gainesville, Depot Park, the Gainesville-to-Hawthorne State Trail and Paynes Prairie Preserve State Park; Depot Park area a designated Trail Town; University of Florida Campus Greenway west of Depot Park; Waldo Road Greenway northeast of Depot Park; state trail starts at Boulware Springs Park
  3. Gainesville Hawthorne Trail, Top 10 FL Biking — 100 Florida Trails · web · checked Oct 16, 2026
    Supports: Downtown Connector from Boulware Springs Trailhead to Depot Park under canopy; access to Sweetwater Preserve trails; several road crossings, busy crossing at Williston; crossing Sweetwater Branch Creek onto the Depot Park trail; link to the Depot Avenue Rail-Trail, which connects to the Waldo Road Greenway
  4. Gainesville-Hawthorne State Park Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026
    Supports: end point Depot Park, 874 SE 4th St. (Gainesville)
  5. OpenStreetMap relation 2117058 (Downtown Connector Rail-Trail) — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: name Downtown Connector Rail-Trail; asphalt cycleway designated for bicycles and pedestrians, motor vehicles no; one bridge; mapped length about 1.7 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.