Del Rio Trail
Rail-trail in California
Runs through Sacramento · Sacramento County
Conditions now
Loading the weather near Sacramento…
Forecast by the National Weather Service for Sacramento · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at San Mateo Way mile 0.1 directions to trailhead 1
- Parking at South Land Park Drive mile 0.7 directions to trailhead 2
- Parking at 35th Avenue mile 1.7 directions to trailhead 3
- Parking at Florin Road mile 3.5 directions to trailhead 4
- Parking at Freeport Boulevard mile 4.5 directions to trailhead 5
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Del Rio Trail is a 4.8-mile multi-use path in Sacramento, California, built by the City of Sacramento's Department of Public Works on the abandoned corridor of the former Sacramento Southern Railroad's Walnut Grove Branch line. Planning and public meetings began in 2017, and the City Council approved the project in 2019, but a lawsuit by the Sacramento Rail Preservation Action Group to stop construction on the line delayed it until a county judge ruled for the city. Construction began in December 2022. The $23 million project drew $5 million from the state's Clean California initiative, $10.9 million from the Sacramento Area Council of Governments and federal Active Transportation Program grants. Most of the trail opened in May 2024. Its bridge over Interstate 5 and Riverside Boulevard stayed closed after the city found it had not been built to specifications; the city rebuilt it from August 2025 and opened it in December 2025, completing the route.
The trail runs from the city's Farm-to-Fork water tower along Interstate 5 at the southern city limits north to William Land Park, through the Meadowview, Pocket, Z'Berg, Freeport Manor, South Land Park and Land Park neighborhoods. A second bridge crosses Willow Slough near Freeport Boulevard. The north end is near Riverside Boulevard and 13th Avenue, and the trail links to the Sacramento River Parkway and existing trails toward downtown. The record's map line is about 5 miles long.
The path is asphalt. Eighteen permanent artworks, gathering spaces and wayfinding pieces paid for with Clean California grants, were installed along it in 2024, together with twelve interpretive signs, five of them on local history by the Center for Sacramento History.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 85% of this route as an abandoned rail line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento Executive Airport, 1.1 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 61 66 72 80 88 93 92 88 79 65 56 Low °F 39 42 44 47 52 56 59 59 56 50 43 38 Precipitation, in 3.7 3.5 2.7 1.3 0.8 0.2 0 0 0.1 0.8 1.7 3.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Davisville sheet (1:62,500); the 1949 Sacramento West sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Sacramento River Bike Trail within 0.2 mi · 6.2 mi, paved
- Clarksburg Branch Line Trail 1.4 mi away · 4.3 mi, paved
- American River Bike Trail 2.6 mi away · 36.5 mi, paved
- Sacramento Northern Bike Trail 3.2 mi away · 10.1 mi, paved
- Two Rivers Bike Trail 3.7 mi away · 1.8 mi, surface unknown
- Levee Path 3.9 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sacramento Del Rio Trail construction continues. Here's what to expect. — CapRadio, June 13, 2023 · organization · checked Oct 16, 2026 Supports: 4.8-mile abandoned railroad corridor of the former Sacramento Southern Railroad's Walnut Grove Branch line; route from the Farm-to-Fork water tower along I-5 to William Land Park; asphalt paving; bridges over I-5 and Riverside Boulevard and over Willow Slough near Freeport Boulevard; links to the Sacramento River Trail and trails toward downtown; neighborhoods; 2017 planning, 2019 approval, lawsuit by the Sacramento Rail Preservation Action Group, county judge's ruling, December 2022 construction start; $23 million with $5 million Clean California, $10.9 million SACOG and federal Active Transportation Program funds
- Del Rio Trail Bridge reopens to the public — CapRadio, December 16, 2025 · organization · checked Oct 16, 2026 Supports: rebuilt bridge over Interstate 5 near the zoo reopened; originally slated to open in 2024 but did not meet safety standards; trail was an abandoned rail line
- City celebrates completion of Del Rio Trail Bridge, completing full trail connection — Sacramento City Express (City of Sacramento), December 17, 2025 · press · checked Oct 16, 2026 Supports: 4.8-mile length; majority opened May 2024; bridge over I-5 and Riverside Boulevard rejected as not built to specifications; rebuilding from August 2025; construction finalized December 10 and celebrated December 16, 2025; full connection between south Sacramento and downtown and the Sacramento River Parkway
- City breaks ground and prepares for construction of multi-use Del Rio Trail — Sacramento City Express (City of Sacramento), November 17, 2022 · press · checked Oct 16, 2026 Supports: City of Sacramento Department of Public Works project; planning and outreach began 2017; $23 million project with $5 million from Clean California
- Check out Del Rio Trail's 18 new art installations and meet the artists Nov. 8-9 — Sacramento City Express (City of Sacramento), November 4, 2024 · press · checked Oct 16, 2026 Supports: 18 permanent artworks (Gathering Spaces and Wayfinding installations) funded by Clean California grants; twelve interpretive signs, five by the Center for Sacramento History; neighborhoods served; north end near Riverside Boulevard and 13th Avenue
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.