Downtown Trail
Rail-trail in Wisconsin · OpenStreetMap relation
Runs through Fond du Lac · Fond du Lac County
Conditions now
Loading the weather near Fond du Lac…
Forecast by the National Weather Service for Fond du Lac · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by City of Fond du Lac Park Division.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Division Street mile 0.4 directions to trailhead 1
- Parking at Forest Avenue mile 0.5 directions to trailhead 2
- Parking at West 1st Street mile 0.6 directions to trailhead 3
- Parking at West 2nd Street mile 0.7 directions to trailhead 4
- Parking at Western Avenue mile 0.8 directions to trailhead 5
(opens in a new tab) About this trail
The Downtown Trail is a paved city trail of about one mile in Fond du Lac, Wisconsin, run by the City of Fond du Lac. It parallels the Fond du Lac River through downtown, from Brooke Street south to Morris Street. The city's description of the trail mentions no railroad, and only about 0.2 mile of the route mapped here lies on a former railbed; the rest follows the river.
The trail links with the Brooke Street Trail, a paved trail of 1.5 miles that runs north to Lakeside Park and south to Dixie Street and is planned eventually to connect with the Wild Goose State Park Trail. Mapped access points along the Downtown Trail include West Division Street, West 1st Street and Forest Avenue.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fond Du Lac Wwtp, 2.1 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 28 40 53 66 76 80 78 71 57 43 30 Low °F 9 12 22 34 46 56 61 59 51 39 27 16 Precipitation, in 1.2 1.1 1.9 3.1 3.4 4.4 3.6 3.5 3.2 2.8 1.9 1.5 Snow, in 10.8 9.9 5.7 2.4 0 0 0 0 0 0.4 1.7 7.1 - On the National Register
- South Main Street Historic District, Fond du Lac · historic district, listed 1993 · nomination file for South Main Street Historic District
- North Main Street Historic District, Fond du Lac · historic district, listed 2002 · nomination file for North Main Street Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1910 Fond du Lac sheet (1:62,500); the 1955 Fond Du Lac sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Brooke Street Trail within 0.2 mi · 2.0 mi, paved
- Wild Goose State Trail 1.2 mi away · 34.2 mi, crushed stone
- Peebles Trail 1.4 mi away · 4.2 mi, paved
- Mascoutin Valley State Trail 1.9 mi away · 21.0 mi, crushed stone
- Prairie Trail 2.3 mi away · 7.0 mi, paved
- Old Plank Road Trail 2.3 mi away · 34.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5830849, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — Parks and Trees — Public Works — City of Fond du Lac · government source · checked Oct 15, 2026 Supports: paved; parallels the Fond du Lac River; Brooke Street south to Morris Street through downtown; one mile; Brooke Street Trail 1.5 miles, Lakeside Park to Dixie Street, links with the Downtown Trail, eventual link to the Wild Goose State Park Trail
- Relation 5830849: Downtown Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: operator City of Fond du Lac Park Division; access points at West Division Street, West 1st Street and Forest Avenue; about 0.3 km of the route on mapped railbed
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.