Mascoutin Valley State Trail
Rail-trail in Wisconsin · OpenStreetMap relation
Runs through Berlin, Town of Berlin (Green Lake County), Ripon, Town of Ripon, Village of Rosendale, Eldorado, Lamartine, Fond du Lac and 3 more · Green Lake, Winnebago and Fond du Lac counties
All 11 towns and places
Berlin, Town of Berlin (Green Lake County), Nepeuskun, Ripon, Town of Ripon, Village of Rosendale, Town of Rosendale, Eldorado, Lamartine, Town of Fond du Lac and Fond du Lac
Conditions now
Loading the weather near Rosendale…
Forecast by the National Weather Service for Rosendale · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Mascoutin Valley State Trail is a rail trail in northeastern Wisconsin. The trail is used for walking, bicycling, horseback riding, and snowmobiling during the winter months. The trail can also be used for cross-country skiing and snowshoeing but the trail is not groomed and must be shared with snowmobiles. Numerous miles of snowmobile trails connect to the Mascoutin Valley State Trail.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Mascoutin Valley State Trail is a rail-trail in northeastern Wisconsin, built on a former railroad corridor and running past farms, prairies and wetlands in Green Lake, Winnebago and Fond du Lac counties. It is a county-operated state trail: the counties maintain it in conjunction with the Wisconsin Department of Natural Resources, and the DNR lists the Fond du Lac County Parks Department as its contact. The trail totals 21 miles in two sections, because the corridor between Ripon and Rosendale is in private ownership.
The western section runs 11 miles from Berlin to Ripon. It begins at County Highway F near South Street in Berlin, with parking about halfway along on Lake Road off County Highway E by Rush Lake, and ends along County Highway E north of Ripon, where a parking lot sits at the Locust Road junction. Along the way it passes the Berlin Fen State Natural Area, the Koro Railroad Prairie State Natural Area and the Rush Lake marsh. The eastern section runs 10 miles from State Highway 26 in Rosendale, where parking is at Taylor Park, east past the Eldorado Marsh Wildlife Area to Fond du Lac, with parking lots at the eastern trailhead on Rolling Meadows Drive near Highway 41 and at the County Highway I junction north of State Highway 23.
The surface is crushed limestone, with some grass and gravel stretches. The trail is open year-round and no state trail pass is required. It is used for walking, bicycling and horseback riding, except that horses are not allowed in Green Lake County, and for snowmobiling in winter; skiers and snowshoers share the ungroomed trail with snowmobiles.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Ripon 5 NE, 9.8 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 28 40 54 67 76 80 78 72 58 43 30 Low °F 10 12 22 34 46 57 60 59 50 39 28 16 Precipitation, in 1 0.9 1.7 2.9 3.9 4.8 3.9 3.2 3.2 2.7 1.9 1.4 Snow, in 11 8.2 5.6 1.4 0 0 0 0 0 0.1 1.8 9.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1956 Rosendale sheet (1:62,500); the 1957 Madison sheet (1:250,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Look around
-
360° view 1 of 4, photo by greenline -
360° view 2 of 4, photo by greenline -
360° view 3 of 4, photo by greenline -
360° view 4 of 4, photo by greenline
Nearby trails
- Northwestern Trail 0.7 mi away · 2.7 mi, crushed stone
- Brooke Street Trail 1.7 mi away · 2.0 mi, paved
- Downtown Trail 1.9 mi away · 1.0 mi, paved
- Peebles Trail 2.9 mi away · 4.2 mi, paved
- Wild Goose State Trail 3.0 mi away · 34.2 mi, crushed stone
- Prairie Trail 4.3 mi away · 7.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5835617, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Mascoutin Valley State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q16981767, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Mascoutin Valley State Trail — Wisconsin DNR · government source · checked Oct 14, 2026 Supports: county-operated; farms, prairies and wetlands in Green Lake, Winnebago and Fond du Lac counties; former railroad corridor; two sections totaling 21 miles; Berlin-Ripon and Rosendale-Fond du Lac; gap between Ripon and Rosendale in private ownership; open year-round; no state trail pass; Fond du Lac County Parks Department contact
- Basic Information — Mascoutin Valley State Trail — Wisconsin DNR · government source · checked Oct 14, 2026 Supports: 11 miles Berlin to Ripon, 10 miles Fond du Lac to Rosendale; crushed limestone; trailheads and parking at County Highway F and South Street, Lake Road by Rush Lake, County Highway E and Locust Road, Taylor Park, Rolling Meadows Drive near Highway 41, County Highway I north of Highway 23
- Mascoutin Valley State Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: maintained by the three counties with the DNR; uses including horses except in Green Lake County and snowmobiling; ungroomed for skiing and snowshoeing, shared with snowmobiles; some grass and gravel; Berlin Fen and Koro Railroad Prairie State Natural Areas, Rush Lake marsh, Eldorado Marsh Wildlife Area
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
