States › Arkansas

Ducks Unlimited Park Loop

Greenway in Arkansas

In Crittenden County

Conditions now

Loading the weather near Memphis…

Forecast by the National Weather Service for Memphis · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Hernando de Soto Bridge 2022b (opens in a new tab)
Hernando de Soto Bridge 2022b · Photo: Antony-22 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Ducks Unlimited Park Loop is the paved loop of Ducks Unlimited Park, a 1,500-acre park on the Mississippi River floodplain in West Memphis, Arkansas, across the river from Downtown Memphis. The Big River Park Conservancy, the umbrella nonprofit over Big River Crossing, Big River Trails and the park, secured the land; Ducks Unlimited leads the conservation strategy and the City of West Memphis is a partner. The park's website and a 2023 announcement give the loop as 7 miles (11.3 km) of pavement, with a separate half-mile (0.8 km) out-and-back trail.

The park is reached from Downtown Memphis over Big River Crossing, a pedestrian and cyclist bridge across the Mississippi, and connects to the Big River Levee Trail System, which has more than 110 miles (177 km) of riverside trails. The park is open from sunrise to sunset every day unless it is flooded, and parking is offered at two places off Dacus Lake Road, one at the west end of Big River Crossing and one at the split in the 7-mile loop. The park's website says no vehicles, including ATVs, are allowed on its trails. In April 2024 the U.S. Department of Transportation awarded the City of West Memphis more than $16 million to restore floodplain at the park.

The line mapped here covers about 2 miles (3.2 km), against the 7 miles the park gives for its loop. OpenStreetMap tags the way as asphalt, designated for bicycles and foot traffic, and lists it in a route relation named Ducks Unlimited Park Loop, described as a Paved Walk and Cycle route.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
W Memphis, 10.2 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485462728088919085756252
Low °F313442516169737164524234
Precipitation, in4.44.45.85.85.944.23.13.34.44.85.6
Snow, in0.50.70.3000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1916 Memphis sheet (1:62,500); the 1965 Northwest Memphis sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. 1,500-acre project to start at new Ducks Unlimited Park in Arkansas (April 13, 2023) — Ducks Unlimited · organization · checked Oct 31, 2026
    Supports: 1,500 acres; Big River Park Conservancy secured the land and is the umbrella 501(c)3 organization over Big River Crossing, Big River Trails and the park; Ducks Unlimited leads the conservation strategy; City of West Memphis a project partner; across from Downtown Memphis, reached via Big River Crossing; 7-mile paved trail loop and half-mile out-and-back trail; Big River Levee Trail System of more than 110 miles
  3. U.S. DOT awards $16M for restoration of park at Big River Crossing — Action News 5 (April 11, 2024) · press · checked Oct 31, 2026
    Supports: U.S. Department of Transportation awarded more than $16 million to the City of West Memphis to restore hundreds of acres of Mississippi River floodplain; work to be done at Ducks Unlimited Park; park accessible from Downtown Memphis via Big River Crossing; 7-mile paved trail loop and half-mile out-and-back trail
  4. Trails — Ducks Unlimited Park · web · checked Oct 31, 2026
    Supports: 7-mile paved loop and half-mile out-and-back trail; 1,500 acres; Big River Crossing, an exclusive pedestrian and cyclist bridge over the Mississippi connecting downtown Memphis with West Memphis; direct connection to the Big River Levee Trail System of more than 110 miles of riverside trails; open sunrise to sunset every day
  5. FAQs — Ducks Unlimited Park · web · checked Oct 31, 2026
    Supports: open sunrise to sunset every day unless the park is flooded; parking in two locations off Dacus Lake Road, at the west end of Big River Crossing and at the 7 mile loop split; no vehicles, including ATVs, on park trails; 7 mile paved loop
  6. Ducks Unlimited Park Loop — OpenStreetMap relation 16118219 · web · checked Oct 31, 2026
    Supports: route relation named Ducks Unlimited Park Loop, bicycle=designated, foot=designated, description Paved Walk and Cycle route; way 889343708 is a member
  7. Ducks Unlimited Park Loop — OpenStreetMap way 889343708 · web · checked Oct 31, 2026
    Supports: highway=cycleway, surface=asphalt, bicycle=designated, foot=designated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.