Wolf River Greenway
Greenway in Tennessee
Runs through Memphis and Germantown · Shelby County
Conditions now
Loading the weather near Memphis…
Forecast by the National Weather Service for Memphis · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South Germantown Road mile 0 directions to trailhead 1
- Parking at Wolf Trail Cove mile 0 directions to trailhead 2
- Parking at South Germantown Road mile 0.1 directions to trailhead 3
- Parking at Wolf River Boulevard mile 1.2 directions to trailhead 4
- Parking at Humphreys Boulevard mile 2.4 directions to trailhead 5
- Parking at Humphreys Boulevard mile 3.3 directions to trailhead 6
- Parking at South Advantage Way Drive mile 10.5 directions to trailhead 7
Plan your visit
- National Recreation TrailDesignated in 2012 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Wolf River Greenway is a corridor of protected green space along the Wolf River in Memphis, Tennessee, with a paved, 12-foot-wide path for walkers and cyclists. It is not a rail-trail. The greenway is a public-private partnership of the Wolf River Conservancy, Memphis Parks and Shelby County, and is being built in phases toward a planned 26 miles from the north end of Mud Island, through north central Memphis, to Shelby Farms Park and on to Germantown and Collierville. The conservancy counts 14 miles open; in August 2026 WMC reported 16 miles complete, from Mud Island to Cordova.
The conservancy describes the open sections from west to east. The Mud Island section opened in October 2017 with a 1.2-mile loop on the old Wolf River levee, built in 1960 to divert the river. The Hollywood section and the McLean Cycle Track make up 3.3 miles through the Hyde Park neighborhood, built atop a levee, with a trailhead at 1833 North Hollywood Street. Epping Way crosses 138 acres of conservancy land around a 20-acre lake. The Kennedy Park section, opened in 2018, runs 1.5 miles through mature forest with six bridges. Wolf Crossing, opened in November 2021, has a 270-foot cable-stayed suspension bridge over the river and a raised concrete boardwalk through the Lucius Burch State Natural Area, and links to the Shelby Farms Greenline. The 3.6-mile East section, with trailheads at 6324 and 6730 Humphreys Boulevard, meets the Germantown Greenway near Kirby Parkway.
The greenway is open daily from sunrise to sunset. About 6.9 miles are on our map, in separate pieces: parts of the Hyde Park and Kennedy Park sections, Wolf Crossing, the East section, and a stretch east of Kirby Parkway toward Germantown Road.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
50% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Memphis Wfo, 6.7 km from the trail's middle, 20 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 49 54 63 73 81 88 91 91 85 75 62 52 Low °F 30 33 40 49 59 68 71 69 62 50 39 33 Precipitation, in 4.3 4.8 5.7 5.8 5.5 4.7 4.5 3.4 3.7 4.2 4.8 5.7 Snow, in 0.8 1.1 0.8 0 0 0 0 0 0 0 0 0.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1956 Blytheville sheet (1:250,000); the 1965 Ellendale sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationWolf River Conservancy — Greenway
- FacebookWolf River Conservancy (Facebook)
- RedditSearch Reddit: r/Tennessee
Nearby trails
- Shelby Farms Greenline 0.2 mi away · 11.4 mi, paved
- Wolf River Greenway - Kennedy Park Section 0.9 mi away · 1.4 mi, paved
- Chickasaw Trail 1.2 mi away · 2.6 mi, paved
- Ducks Unlimited Park Loop 4.8 mi away · 2.0 mi, paved · Arkansas
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenway — Wolf River Conservancy · organization · checked Oct 15, 2026 Supports: protected corridor with paved 12-foot path for pedestrians and bicycles; planned 26 miles from Mud Island to Shelby Farms, Germantown and Collierville; partnership of the conservancy, Memphis Parks and Shelby County; 14 miles open; section descriptions, opening dates, lengths, addresses; Wolf Crossing bridge and boardwalk; East section meets the Germantown Greenway near Kirby Parkway; hours sunrise to sunset
- Wolf River Greenway expansion seeing progress — Action News 5 (WMC), August 2026 · press · checked Oct 15, 2026 Supports: 16 miles completed, from Mud Island to Cordova; 26 miles when finished
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.