States › Washington

Duwamish Trail

Greenway in Washington · OpenStreetMap relation

Runs through Seattle · King County

Conditions now

Loading the weather near Seattle…

Forecast by the National Weather Service for Seattle · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.0 mi 6.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Marginal Way Southwest mile 0.3 directions to trailhead 1
  2. Parking at West Marginal Way Southwest mile 0.8 directions to trailhead 2
  3. Parking at Southwest Alaska Street mile 0.8 directions to trailhead 3
  4. Parking at Southwest Edmunds Street mile 0.9 directions to trailhead 4
  5. Parking at Detroit Avenue Southwest mile 1.5 directions to trailhead 5
  6. Parking at West Marginal Way Southwest mile 1.5 directions to trailhead 6
  7. Parking at West Marginal Way Southwest mile 1.5 directions to trailhead 7
  8. Parking at West Marginal Way Southwest mile 1.9 directions to trailhead 8
  9. Parking at West Marginal Way Southwest mile 2.4 directions to trailhead 9
  10. Parking at Southwest Michigan Street mile 2.5 directions to trailhead 10
  11. Parking at South Kenyon Street mile 3.2 directions to trailhead 11
  12. Parking at South Director Street mile 4.5 directions to trailhead 12
  13. Parking at South Director Street mile 4.5 directions to trailhead 13
Duwamish Trail (opens in a new tab)
Photo: Gary Dean Austin · CC BY-SA · Flickr

About this trail

Duwamish Trail is a paved multi-use path for walking and biking beside West Marginal Way SW on the west bank of the Duwamish Waterway in Seattle, Washington. The Seattle Department of Transportation (SDOT) says it runs alongside the road for several miles; a 2012 SDOT post described it as about 2.5 miles, paved and flat, from the lower South Spokane Street Bridge south to the First Avenue South Bridge, and connecting to the Alki Trail and, to the south, on-street and off-street routes toward the Green River and Interurban trails. The 2012 post reports that SDOT crews repaved the middle section, where the trail leaves the street and passes through a wooded area, with Bridging the Gap funds.

In April and May 2023 SDOT installed a 0.4-mile two-way protected bike lane on the west side of the road between SW Marginal Pl and the Duwamish Longhouse, and updated 17 trail driveway crossings on the east side with signs and pavement markings. A permanent sidewalk and curb ramps at the Longhouse crossing were planned for 2024; whether they have been built was not confirmed. This record maps about 4 miles.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Seattle Boeing Field, 2.9 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F495155606671777772615348
Low °F373739444954585854464036
Precipitation, in5.23.73.92.921.20.60.81.43.55.85.5
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Seattle sheet (1:62,500); the 1949 Seattle South sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3493102, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. West Marginal Way SW Safety Corridor Project - Seattle Department of Transportation · government source · checked Oct 17, 2026
    Supports: trail runs alongside West Marginal Way SW for several miles, 0.4-mile protected bike lane and 17 driveway crossings installed April-May 2023, planned Longhouse crossing work
  3. Duwamish Trail - Now ready for bicycling or walking - SDOT Blog · government source · checked Oct 17, 2026
    Supports: about 2.5 miles, endpoints, paved and flat, repaving of the middle section, Bridging the Gap funding, connections
  4. OpenStreetMap relation 3493102 · web · checked Oct 17, 2026
    Supports: mapped length of this record

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.