I 90 Trail
Greenway in Washington
Runs through Seattle, Mercer Island and Bellevue · King County
Conditions now
Loading the weather near Mercer Island…
Forecast by the National Weather Service for Mercer Island · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Golf Drive South mile 0 · restrooms directions to trailhead 1
- Parking at South Massachusetts Street mile 0.8 directions to trailhead 2
- Parking at Bradner Place South mile 1.2 · water directions to trailhead 3
- Parking at Lakeside Avenue South mile 1.7 directions to trailhead 4
- Parking at 60th Avenue Southeast mile 3.3 directions to trailhead 5
- Parking at West Mercer Way mile 3.5 directions to trailhead 6
- Parking at Southeast 22nd Street mile 3.7 · water directions to trailhead 7
- Aubrey Davis Park Parking mile 3.8 · restrooms · water directions to Aubrey Davis Park Parking
- WSDOT and Aubrey Davis Park Shared Parking mile 3.8 · restrooms · water directions to WSDOT and Aubrey Davis Park Shared Parking
- Parking at Southeast 20th Street mile 3.8 · restrooms · water directions to trailhead 10
- Parking at North Mercer Way mile 4.4 directions to trailhead 11
- Parking at Southeast 24th Street mile 4.5 directions to trailhead 12
- Parking at Frontage Road mile 6 directions to trailhead 13
- Parking at 108th Avenue Southeast mile 6.5 · restrooms · water directions to trailhead 14
- Parking at Southeast 36th Street mile 8.5 directions to trailhead 15
- Parking at Southeast 36th Street mile 8.5 directions to trailhead 16
- Parking at Southeast Eastgate Way mile 9.9 directions to trailhead 17
- Parking at West Lake Sammamish Parkway Southeast mile 11.4 directions to trailhead 18
- Parking at West Lake Sammamish Parkway Southeast mile 11.5 directions to trailhead 19
- Parking at Southeast 43rd Place mile 11.5 directions to trailhead 20
- Parking at West Lake Sammamish Parkway Southeast mile 11.5 directions to trailhead 21
Plan your visit
- By trainAmtrak: Seattle, WA (SEA) 0.7 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The I-90 Trail is a paved shared-use path of about 10 miles that follows Interstate 90 between Seattle and Bellevue, Washington. The Washington State Department of Transportation manages it, and it is not a rail-trail. Cascade Bicycle Club describes it as the east-west spine of the Mountains to Sound Greenway trail route.
The Washington Trails Association describes the trail as beginning in Seattle's Rainier Valley at 12th Avenue S near Sturgus Park, crossing Lake Washington on the I-90 bridge to Mercer Island, and passing through the I-90 lid park, now Aubrey Davis Park. It continues through the landscaped freeway corridor to Bellevue and ends in Factoria, with an eastern segment connecting from Eastgate. A newer link runs through Dr. Jose Rizal Park on Beacon Hill.
On Mercer Island most of the right of way is owned by WSDOT, and the Aubrey Davis Park Master Plan sets the standards under which the City of Mercer Island manages the trail. A 2019 Cascade Bicycle Club article calls for widening it and describes a future connection from Alki Beach to Snoqualmie Pass and the Palouse to Cascades Trail.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Seattle Boeing Field, 8.5 km from the trail's middle, 35 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 49 51 55 60 66 71 77 77 72 61 53 48 Low °F 37 37 39 44 49 54 58 58 54 46 40 36 Precipitation, in 5.2 3.7 3.9 2.9 2 1.2 0.6 0.8 1.4 3.5 5.8 5.5 - On the National Register
- Mount Baker Ridge Tunnel, Seattle · structure, listed 1982 · nomination file for Mount Baker Ridge Tunnel
- Dr. José Rizal Park, Seattle · site, listed 2025
- Old maps
USGS topographic maps of the trail's middle go back to the 1895 Snohomish sheet (1:125,000); the 1950 Mercer Island sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders reported construction on the Mercer Island stretch: one said in February 2024 that work had run nearly a year, and a rider on a June 2025 tour said it was still going. r/seattlebike, Feb 2024 · r/seattlebike, Jun 2025
- Riders in August 2025 described two ways from downtown Seattle: Dearborn Street and Hiawatha through Judkins Park, or Jose Rizal Park. One preferred the Rizal route; another said its north approach meets traffic. r/seattlebike, Aug 2025
- Riders in February 2024 suggested 108th Avenue Southeast from the trail's Bellevue end into downtown, one calling it direct but full of sharrows, and steered away from Bellevue Way as unfriendly to bikes. r/seattlebike, Feb 2024
- Riders in February 2024 reported commute times: about 40 minutes by e-bike from downtown Bellevue to Pioneer Square, and under 90 minutes for roughly 17 miles from West Seattle without electric assist. r/seattlebike, Feb 2024
4 Reddit threads about this trail, Feb 2024 to Aug 2025
- West Seattle to downtown Bellevue commute r/seattlebike · Feb 2024 · 16 comments
- Best way to bike to Seward Park from downtown r/seattlebike · Aug 2025 · 27 comments
- Trip report: Cascades mini bike tour r/seattlebike · Jun 2025 · 13 comments
- New I-90 Trail Staircase and Lighting for Judkins Park Link Station Access r/seattlebike · Mar 2024 · 9 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Lake To Lake Trail within 0.2 mi · 4.4 mi, paved
- Newport Way Trail 0.5 mi away · 1.8 mi, paved
- Eastrail 0.7 mi away · 14.9 mi, paved
- Pipeline Trail 1.0 mi away · 5.5 mi, paved
- East Lake Sammamish Trail 1.3 mi away · 10.8 mi, paved
- Elliott Bay Trail 1.7 mi away · 4.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- I-90 Trail - Washington Trails Association · organization · checked Oct 17, 2026 Supports: about 10 miles, paved, route from Rainier Valley to Factoria, Mercer Island lid park, Eastgate segment, Rizal Park link, WSDOT management
- I-90 / Mountains to Sound Greenway Trail - Cascade Bicycle Club · organization · checked Oct 17, 2026 Supports: east-west spine, Mercer Island right of way, master plan, planned extension to Alki Beach and Snoqualmie Pass
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.