East Lake Sammamish Trail
Rail-trail in Washington · OpenStreetMap relation
Runs through Redmond, Sammamish and Issaquah · King County
Conditions now
Loading the weather near Sammamish…
Forecast by the National Weather Service for Sammamish · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The East Lake Sammamish Trail is an 11-mile (18 km) recreational rail trail in King County, Washington that runs along Lake Sammamish from Marymoor Park in Redmond, through Sammamish, to Gilman Boulevard in Issaquah.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Marymoor Village Garage mile 0.2 directions to Marymoor Village Garage
- Parking at Northeast 70th Street mile 0.3 directions to trailhead 2
- Parking at Redmond Way mile 0.3 directions to trailhead 3
- Parking at Northeast 70th Street mile 0.4 directions to trailhead 4
- Parking at Northeast 70th Street mile 0.4 directions to trailhead 5
- Parking at Northeast 70th Street mile 0.4 directions to trailhead 6
- Parking at Northeast 70th Street mile 0.5 directions to trailhead 7
- Parking at Redmond Way mile 0.5 directions to trailhead 8
- Parking at East Lake Sammamish Parkway Northeast mile 0.6 directions to trailhead 9
- Parking at East Lake Sammamish Parkway Northeast mile 0.6 directions to trailhead 10
- Parking at East Lake Sammamish Parkway Northeast mile 0.7 directions to trailhead 11
- Parking at Northeast 65th Street mile 0.7 directions to trailhead 12
- Sammamish Landing Accessible Parking Lot mile 1.8 · restrooms · water directions to Sammamish Landing Accessible Parking Lot
- Sammamish Landing Parking Lot mile 1.9 · restrooms · water directions to Sammamish Landing Parking Lot
- Parking at East Lake Sammamish Parkway Northeast mile 3.9 · restrooms directions to trailhead 15
- Parking at East Lake Sammamish Parkway Northeast mile 4.3 directions to trailhead 16
- Parking at East Lake Sammamish Parkway Southeast mile 7.5 directions to trailhead 17
- Parking at Southeast 51st Street mile 9.6 directions to trailhead 18
- Parking at Southeast 51st Place mile 9.8 directions to trailhead 19
- Parking at Southeast 56th Street mile 10 directions to trailhead 20
- Parking at East Lake Sammamish Parkway Southeast mile 10 directions to trailhead 21
- Parking at Southeast 56th Street mile 10 directions to trailhead 22
- Parking at East Lake Sammamish Parkway Southeast mile 10.1 directions to trailhead 23
- Parking at East Lake Sammamish Parkway Southeast mile 10.1 directions to trailhead 24
- Parking at Southeast 56th Street mile 10.1 directions to trailhead 25
- Parking at Southeast 56th Street mile 10.1 directions to trailhead 26
- Parking at Northwest Gilman Boulevard mile 10.8 directions to trailhead 27
(opens in a new tab) About this trail
The East Lake Sammamish Trail is an 11-mile paved trail along the east shore of Lake Sammamish in King County, Washington, linking Redmond, Sammamish and Issaquah. King County Parks manages it. The county bought the corridor in 1997, and the trail follows a former BNSF Railway right-of-way. It is part of the 44-mile Locks to Lake Corridor, which runs from Seattle's Ballard waterfront to the Cascade foothills.
The trail runs from Gilman Boulevard in Issaquah, where it joins the county's Issaquah-Preston Trail, north to Marymoor Park in Redmond. There it meets the Marymoor Connector Trail and continues on the Redmond Central Connector Trail to Redmond Town Center, with access to the Sammamish River Trail and Sound Transit light rail stations in Redmond.
A gravel interim trail opened in 2006 after a legal dispute with nearby homeowners. Paved segments followed in Redmond in 2011, Issaquah in 2013 and Sammamish in 2015, 2018 and 2023. The finished trail is 12 feet wide with gravel shoulders, limited to non-motorized use, with a 15 mph speed limit. King County's page states that a 600-foot section between Louis Thompson Road NE and NE Inglewood Hill Road is closed from June 1, 2026 through the rest of the year for culvert replacement, with no detour.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 62% of this route as a trail on former railroad right-of-way.
Former BNSF Railway line, abandoned 1998. From Rail Lines of Washington State (WSDOT).
- Shade
34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Renton Municipal Airport, 16.3 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 50 55 60 66 71 77 78 72 61 52 47 Low °F 37 37 40 43 49 54 58 57 53 46 40 37 Precipitation, in 4.9 3.2 3.7 2.8 1.9 1.5 0.6 0.9 1.5 3.5 5.6 4.5 - On the National Register
- Yellowstone Road, The, Redmond · structure, listed 1974 · nomination file for Yellowstone Road, The
- Old maps
USGS topographic maps of the trail's middle go back to the 1895 Snohomish sheet (1:125,000); the 1950 Issaquah sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Community
What riders say on Reddit
- In 2026, one rider said bypassing the closure meant about a quarter mile on the road; a northbound rider in September had trouble rejoining the trail and carried the bike down stairs. r/seattlebike, Apr 2026
- In 2026, one rider recalled West Lake Sammamish Parkway, a suggested detour, as narrow with little shoulder south; another said it would close fully mid-July to mid-October for separate culvert work. r/seattlebike, Apr 2026
- Two riders in November 2025 reported root bumps on the trail, one saying older sections hidden under foliage made them hard to anticipate; other riders in that thread called it smooth or recently rebuilt. r/seattlebike, Nov 2025
- Riders in November 2025 suggested parking at Marymoor and heading south for family rides; one noted almost no car traffic, another preferred it to the Sammamish River Trail for young children. r/seattlebike, Nov 2025
9 Reddit threads about this trail, Jan 2024 to May 2026
- East Lake Sammamish Trail closure beginning in May 2026 r/seattlebike · Apr 2026 · 13 comments
- The Burke Gilman kind of sucks r/seattlebike · Nov 2025 · 100 comments
- Bike route suggestions for tomorrow r/seattlebike · Nov 2025 · 13 comments
- New to biking, how would you rank these routes in terms of scenery, traffic, and difficulty? r/seattlebike · Jun 2025 · 48 comments
- Looking for an easy-ish first century ride r/seattlebike · May 2026 · 27 comments
- I forgot to bring a banana to help fuel the ride, otherwise I would have kept going. r/seattlebike · Sep 2025 · 2 comments
- Safe beginner biking routes from downtown Kirkland area? r/Kirkland · May 2025 · 15 comments
- Top Tier US locations for road cycling... and I do mean TIERS! r/cycling · Mar 2025 · 148 comments
- Neighborhoods with fancy houses? r/eastside · Jan 2024 · 28 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Issaquah-Preston Trail within 0.2 mi · 4.7 mi, paved
- Rainier Trail within 0.2 mi · 2.5 mi, paved
- Bear Creek Trail within 0.2 mi · 1.6 mi, paved
- Redmond Central Connector Trail within 0.2 mi · 3.8 mi, paved
- Marymoor Connector Trail within 0.2 mi · 2.1 mi, paved
- SR 520 Trail 0.8 mi away · 9.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1902971, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “East Lake Sammamish Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q5328774, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- East Lake Sammamish Trail - King County Parks · government source · checked Oct 17, 2026 Supports: 11 miles, surface and width, speed limit, 1997 purchase, 2006 interim trail, paving dates, connections, Locks to Lake Corridor, 2026 culvert closure
- East Lake Sammamish Trail - Wikipedia · organization · checked Oct 17, 2026 Supports: former BNSF Railway right-of-way, homeowner opposition and lawsuit, 2006 opening, Marymoor Park to Gilman Boulevard
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.


