Redmond Central Connector Trail
Rail-trail in Washington
Runs through Redmond · King County
Conditions now
Loading the weather near Redmond…
Forecast by the National Weather Service for Redmond · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 170th Avenue Northeast mile 0.1 directions to trailhead 1
- Parking at Redmond Way mile 0.1 directions to trailhead 2
- Parking at Redmond Way mile 0.2 directions to trailhead 3
- Parking at Northeast 76th Street mile 0.2 directions to trailhead 4
- Parking at Northeast 76th Street mile 0.3 directions to trailhead 5
- Parking at Northeast 76th Street mile 0.3 directions to trailhead 6
- Parking at Redmond Way mile 0.4 directions to trailhead 7
- Parking at 164th Avenue Northeast mile 0.5 directions to trailhead 8
- Parking at Cleveland Street mile 0.6 directions to trailhead 9
- Parking at Leary Way mile 0.6 · restrooms · water directions to trailhead 10
- Parking at Northeast 76th Street mile 0.6 directions to trailhead 11
- Parking at Cleveland Street mile 0.6 directions to trailhead 12
- Parking at 164th Avenue Northeast mile 0.6 directions to trailhead 13
- Redmond Central Connector Parking mile 0.7 directions to Redmond Central Connector Parking
- Parking at Cleveland Street mile 0.7 · restrooms · water directions to trailhead 15
- Parking at Cleveland Street mile 0.7 · restrooms · water directions to trailhead 16
- Parking at Cleveland Street mile 0.7 · restrooms · water directions to trailhead 17
- Parking at Bear Creek Parkway mile 0.9 directions to trailhead 18
- Parking at Redmond Way mile 0.9 directions to trailhead 19
- Parking at Redmond Way mile 0.9 directions to trailhead 20
- Parking at Redmond Way mile 1 · water directions to trailhead 21
- Parking at 158th Avenue Northeast mile 1 directions to trailhead 22
- Parking at Redmond Way mile 1 directions to trailhead 23
- Parking at 158th Avenue Northeast mile 1 directions to trailhead 24
- Parking at Willows Road Northeast mile 2.5 directions to trailhead 25
- Parking at Willows Road Northeast mile 2.6 directions to trailhead 26
- Parking at Willows Road Northeast mile 3.5 directions to trailhead 27
- Parking at Northeast 124th Street mile 3.9 directions to trailhead 28
(opens in a new tab) About this trail
The Redmond Central Connector is a paved rail-trail of 3.9 miles in Redmond, Washington, built by the City of Redmond on the former Burlington Northern Railroad corridor. It is a spur of the Eastside Rail Corridor and part of the 42-mile Eastrail system, linking the main Eastrail to downtown Redmond. Wikipedia gives the year the land was acquired as 2010.
The city built the trail in three phases. Phase 1, about one mile through downtown Redmond from the Bear Creek Trail near SR 202 and Redmond Way to the Sammamish River Trail, was completed in 2013. Phase 2 added about 1.3 miles from east of the Sammamish River to the Willows Road area, including a retrofitted railroad trestle over the river and the 154th Avenue NE bridge, and was finished in 2017. Phase 3, the final 1.6 miles to NE 124th Street, was under construction in 2025 and Wikipedia lists the third phase as completed that year.
The route begins at NE 124th Street and Willows Road NE, crosses the Sammamish River and the Sammamish River Trail on the trestle, passes Redmond Central Connector Park, Downtown Park and Redmond Town Center, and reaches Downtown Redmond station. It ends at the Bear Creek Trail, which connects with the East Lake Sammamish Trail. The city says it will eventually link to the Cross Kirkland Corridor north of NE 124th Street. Phase 2 is paved about 12 feet wide, with gravel shoulders.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as an out-of-service rail line, naming the line Woodinville.
Former BNSF Railway line, abandoned 1998–2008 in sections. From Rail Lines of Washington State (WSDOT).
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Seattle Sand Pt Wsfo, 8.3 km from the trail's middle, 3 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 50 54 59 65 70 76 77 71 60 52 46 Low °F 37 37 39 43 48 53 56 57 53 47 41 37 Precipitation, in 5.1 3.5 3.9 3 2.2 1.6 0.8 1 1.7 3.6 5.8 5.5 Snow, in 0.9 1 0 0 0 0 0 0 0 0 0.2 1.7 - On the National Register
- Yellowstone Road, The, Redmond · structure, listed 1974 · nomination file for Yellowstone Road, The
- Old maps
USGS topographic maps of the trail's middle go back to the 1895 Snohomish sheet (1:125,000); the 1950 Kirkland sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesRedmond Central Connector - City of Redmond
Look around
Nearby trails
- East Lake Sammamish Trail within 0.2 mi · 10.8 mi, paved
- Bear Creek Trail within 0.2 mi · 1.6 mi, paved
- PSE Trail within 0.2 mi · 5.7 mi, gravel
- Sammamish River Trail within 0.2 mi · 9.5 mi, paved
- Eastrail within 0.2 mi · 14.9 mi, paved
- SR 520 Trail 0.2 mi away · 9.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Redmond Central Connector - City of Redmond · government source · checked Oct 17, 2026 Supports: 3.9-mile length, Burlington Northern corridor, phase lengths and dates, trestle, bridge, connections, Eastrail, Cross Kirkland Corridor, paved 12-foot width, Phase 3 under construction
- Redmond Central Connector - Wikipedia · organization · checked Oct 17, 2026 Supports: land acquired 2010, completion years 2013, 2017 and 2025, spur of Eastside Rail Corridor, route from NE 124th Street to Bear Creek Trail, downtown landmarks
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

