States › Washington

PSE Trail

Greenway in Washington · OpenStreetMap relation

Runs through Redmond and Union Hill-Novelty Hill · King County

Conditions now

Loading the weather near Redmond…

Forecast by the National Weather Service for Redmond · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The PSE Trail, also called the Puget Power Trail and the Redmond Powerline Trail, is an unpaved equestrian, pedestrian and mountain bike trail in Redmond, Washington. It links the Redmond Central Connector and Sammamish River Trail to Farrel-McWhirter Park.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
5.7 mi 9.3 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Northeast 111th Street mile 4.2 directions to trailhead 1
  2. Parking at 9900 Block mile 6.2 directions to trailhead 2
  3. Parking at 9900 Block mile 6.3 directions to trailhead 3
  4. Parking at 9900 Block mile 6.3 directions to trailhead 4
  5. Parking at 9900 Block mile 6.4 directions to trailhead 5
  6. Parking at 9900 Block mile 6.4 directions to trailhead 6
  7. Parking at 9900 Block mile 6.4 directions to trailhead 7
  8. Parking at 9900 Block mile 6.4 directions to trailhead 8
  9. Parking at 9900 Block mile 6.5 directions to trailhead 9
  10. Parking at 9900 Block mile 6.6 directions to trailhead 10
PSE Trail (opens in a new tab)
Photo: tjhorner · CC BY-SA 4.0 · Mapillary

About this trail

The PSE Trail, also called the Puget Power Trail and the Redmond Powerline Trail, is an unpaved path of about 5.7 miles in Redmond, Washington, open to walkers, horseback riders and mountain bikers. OpenStreetMap records a gravel surface. Wikipedia says the route lies within the easement of the 230 kV Sammamish-Juanita transmission line, which Puget Sound Energy once leased and the Bonneville Power Administration now owns.

The trail begins at the Redmond Central Connector and passes Overlake Christian Church before crossing the Sammamish River, where it meets the Sammamish River Trail. It then climbs Education Hill, crosses State Route 202, and descends to Farrel-McWhirter Park. A short gap follows just past the park. Beyond it the trail passes through the Redmond Watershed Preserve and ends at Redmond Ridge.

The sources reviewed give no opening date, hours or fees, and name no managing agency for the trail itself.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Seattle Sand Pt Wsfo, 12.2 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F475054596570767771605246
Low °F373739434853565753474137
Precipitation, in5.13.53.932.21.60.811.73.65.85.5
Snow, in0.91000000000.21.7
Old maps

USGS topographic maps of the trail's middle go back to the 1895 Snohomish sheet (1:125,000); the 1950 Redmond sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Apr 2024

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 4293817, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “PSE Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7258919, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. PSE Trail - Wikipedia · organization · checked Oct 17, 2026
    Supports: Alternate names, unpaved surface, uses, route from the Redmond Central Connector to Redmond Ridge, short gap past Farrel-McWhirter Park, easement of the Sammamish-Juanita transmission line, PSE lease and BPA ownership
  5. OpenStreetMap relation 4293817 · web · checked Oct 17, 2026
    Supports: Gravel surface, length of about 5.7 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.