States › Ohio

Euclid Creek Greenway

Greenway in Ohio · OpenStreetMap relation

Runs through Euclid and South Euclid · Cuyahoga County

Conditions now

Loading the weather near Euclid…

Forecast by the National Weather Service for Euclid · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Euclid Avenue mile 0.3 directions to trailhead 1
  2. Parking at Euclid Creek Parkway mile 0.9 · restrooms · water directions to trailhead 2
  3. Parking at Euclid Creek Parkway mile 1.7 directions to trailhead 3
  4. Parking at Euclid Creek Parkway mile 1.9 directions to trailhead 4
  5. Parking at Euclid Creek Parkway mile 2.1 · restrooms directions to trailhead 5
  6. Parking at Euclid Creek Parkway mile 2.2 directions to trailhead 6
  7. Parking at Euclid Creek Parkway mile 2.3 directions to trailhead 7
  8. Parking at Euclid Creek Parkway mile 2.4 directions to trailhead 8
  9. Parking at Monticello Boulevard mile 2.8 · restrooms · water directions to trailhead 9
  10. Parking at Euclid Creek Parkway mile 2.8 · restrooms · water directions to trailhead 10
  11. Parking at South Green Road mile 3 directions to trailhead 11
  12. Parking at East Green Road mile 3.1 directions to trailhead 12
Euclid Creek Greenway (opens in a new tab)
Photo: lwjackson · CC BY-SA 4.0 · Mapillary

About this trail

The Euclid Creek Greenway is a Cleveland Metroparks all-purpose trail project in the cities of Euclid and Cleveland, Ohio, built to connect the lower portion of Euclid Creek Reservation with its lakefront portion at Euclid Beach, Villa Angela and Wildwood parks. In 2019 the Cuyahoga Greenways Plan named the corridor one of 12 "Critical Gaps" in Northeast Ohio's trail network. This record also takes in the reservation's existing All Purpose Trail in the Euclid Creek valley, a corridor the park district describes as running 2.5 miles from the Quarry Picnic Area to the Highland Picnic Area.

Construction began on October 19, 2022. Phase 1 extended the all-purpose trail half a mile from the intersection of Euclid Creek Parkway and Highland Road, where new traffic and pedestrian signals were installed, to Euclid Avenue. Phase 2 carried it 0.3 mile across Euclid Avenue and through the former Euclid Central Middle School grounds, which the park district planned as a 17-acre park, to Chardon Road. Both phases opened on November 6, 2023, with money from the Clean Ohio Trail Fund and, for Phase 1, the federal Congestion Mitigation and Air Quality program.

Phase 3, a 0.6-mile trail along Chardon Road from the former school site to St. Clair Avenue in Cleveland, includes a safer at-grade pedestrian railroad crossing; Cleveland Metroparks expects to start it in late 2026 and finish by the end of 2027, with southbound Chardon Road traffic detoured for one construction season. A final 1.1-mile Phase 4 through Collinwood, routed through the 2023 RAISE East Side Trails planning process, is in planning and design. When finished, the greenway is to have more than 2 miles of all-purpose trail. The reservation is open from 6 a.m. to 11 p.m.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

50% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cleveland Burke Airport, 13.3 km from the trail's middle, 38 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353745576877818074625040
Low °F242431415363686760493830
Precipitation, in1.81.52.43.13.52.83.73.52.93.22.92
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Euclid sheet (1:62,500); the 1953 East Cleveland sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19568378, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Euclid Creek Greenway Phases 1 & 2 — Cleveland Metroparks · web · checked Oct 14, 2026
    Supports: multi-phased project connecting the lower portion of Euclid Creek Reservation to its lakefront portion; Phase 1 from Euclid Creek Parkway and Highland Road with new signal to Euclid Avenue and Chardon Road; Phase 2 across Euclid Avenue through the former Euclid Central Middle School property to Chardon Road; opening date November 6, 2023; lengths 0.5 mi and 0.3 mi; ODNR Clean Ohio Trails Fund and NOACA/ODOT CMAQ funding
  3. Euclid Creek Greenway Phases 3 & 4 — Cleveland Metroparks · web · checked Oct 14, 2026
    Supports: Phase 3 0.6-mile trail from the Phase 2 terminus on Chardon Road in Euclid to St. Clair Avenue in Cleveland; safer at-grade pedestrian railroad crossing; construction late 2026 to end of 2027; Chardon Road southbound detour for one construction season; Phase 4 of 1.1 miles to the lakefront portion, routed through the 2023 RAISE East Side Trails project, in planning and design
  4. Cleveland Metroparks Breaks Ground on New Lakefront Connection on Cleveland's East Side — Cleveland Metroparks (October 19, 2022) · web · checked Oct 14, 2026
    Supports: construction began October 19, 2022; half-mile Phase 1 with new traffic and pedestrian signals at Highland Road; former school grounds to become a 17-acre park; lakefront portion includes Euclid Beach, Villa Angela and Wildwood parks; Phase 4 through Collinwood; 2019 Cuyahoga Greenways Plan Critical Gap, one of 12; more than two miles of all-purpose trail when complete, in Cleveland and Euclid
  5. Euclid Creek Reservation — Cleveland Metroparks · web · checked Oct 14, 2026
    Supports: 2.5 miles along Euclid Creek Valley from Quarry Picnic Area to Highland Picnic Area; hours 6 a.m. to 11 p.m.

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.