Gates Mills Boulevard Median Trail
Greenway in Ohio
Runs through Pepper Pike · Cuyahoga County
Conditions now
Loading the weather near Pepper Pike…
Forecast by the National Weather Service for Pepper Pike · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Gates Mills Boulevard Median Trail is a multi-use path of about 1.3 miles in Cuyahoga County, Ohio, running along the median of Gates Mills Boulevard. The route is mapped in OpenStreetMap, which gives the path this name; the surface is not recorded.
The City of Pepper Pike applied to the state for money for the northern stretch. The 2024 Clean Ohio Trail Fund awards list a Gates Mills Boulevard Trail Extension to Cedar Road project with a total cost of $875,000 and an award of $500,000. The project covers 1.0 mile of multi-purpose trail from the Fairmount, Lander and Gates Mills Boulevard circle on the south, where it joins the Gates Mills Boulevard multi-use trail that connects to Shaker Median Park and its trail, north to Cedar Road, where it is to tie into a proposed Mayfield Heights section. The listing calls the trail ADA compliant and designated as non-motorized, for walking, bicycling, jogging or similar uses.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Kirtland-Holden 2, 20.5 km from the trail's middle, 21 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 36 45 58 69 77 82 80 74 62 49 38 Low °F 19 20 28 38 49 58 62 61 55 45 35 25 Precipitation, in 3.5 2.7 3.3 4.1 4.1 4 5.2 4.4 4.5 3.9 4.1 4.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Chagrin Falls sheet (1:62,500); the 1953 Chagrin Falls sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Shaker Blvd Multi-Purpose Trail 0.8 mi away · 2.3 mi, paved
- Woodpecker Way Loop 1.4 mi away · 1.6 mi, paved
- Bruce G. Rinker Greenway Trail 3.6 mi away · 2.5 mi, paved
- Euclid Creek Greenway 4.1 mi away · 3.1 mi, paved
- South Chagrin Reservation All Purpose Trail 4.5 mi away · 6.9 mi, paved
- North Chagrin Reservation All Purpose Trail 4.6 mi away · 5.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- 2024 Clean Ohio Trail Fund Awards - Ohio Department of Natural Resources · government source · checked Oct 17, 2026 Supports: Pepper Pike Gates Mills Boulevard Trail Extension to Cedar Road: 1.0 mile, cost, award, connection to Shaker Median Park trail and proposed Mayfield Heights section, ADA compliant, non-motorized uses
- OpenStreetMap ways for this trail - OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: name, mapped length of about 1.3 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.