States › Alaska

Fish Creek Trail

Greenway in Alaska · OpenStreetMap relation

Runs through Anchorage · Anchorage Municipality

Conditions now

Loading the weather near Anchorage…

Forecast by the National Weather Service for Anchorage · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Iris Drive mile 0.6 directions to trailhead 1
  2. Parking at Spenard Road mile 0.7 directions to trailhead 2
  3. Parking at Spenard Road mile 0.7 directions to trailhead 3
  4. Parking at Spenard Road mile 0.8 directions to trailhead 4
  5. Parking at Turnagain Boulevard mile 0.8 directions to trailhead 5
  6. Parking at Turnagain Boulevard mile 0.9 directions to trailhead 6
  7. Parking at Turnagain Boulevard mile 1 directions to trailhead 7
Anchorage, along the trail (opens in a new tab)
Anchorage, along the trail · Photo: Frank K. from Anchorage, Alaska, USA · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Fish Creek Trail is a paved multi-use trail of about 1.5 miles in Anchorage, Alaska, following Fish Creek through the Spenard area. The Anchorage Park Foundation describes the project as connecting Fish Creek from Midtown's Cuddy Pond to Cook Inlet. OpenStreetMap maps parking along Spenard Road and Iris Drive near the trail.

The trail was rebuilt over three years at a cost of about $5 million, with new pavement and four new bridges. Funding came mostly from an Alaska Transportation Alternatives Program grant, grants from the Anchorage Metropolitan Area Transportation Solutions (AMATS) and a voter-approved bond. A grand reopening with a ribbon-cutting was held on October 31, 2019. Partners included the Alaska Department of Transportation, AMATS, the Alaska Railroad, the Spenard Community Council and Friends of Fish Creek.

A separate project led by the Alaska Department of Transportation and Public Facilities with Anchorage Parks and Recreation would build a new multi-use trail from the Fish Creek Trail at Northern Lights Boulevard to the Coastal Trail. Its environmental document was completed in March 2025, and the project team is moving toward final design. The municipality would own and maintain it.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Anchorage Lake Hood Airport, 1.8 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F232733465866686557422925
Low °F101417304150545243311813
Precipitation, in0.60.60.60.40.60.91.82.83.11.71.10.9
Old maps

USGS topographic maps of the trail's middle go back to the 1951 Anchorage sheet (1:250,000); the 1953 Anchorage A-8 sheet (1:63,360) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 15669964, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Fish Creek Trail Re-Opening and Trail Trick or Treat - Anchorage Park Foundation · organization · checked Oct 17, 2026
    Supports: Cuddy Pond to Cook Inlet, three-year $5 million renovation, new pavement and four bridges, funding, October 31, 2019 reopening, partners
  3. Fish Creek Trail Connection - fishcreektrail.com · web · checked Oct 17, 2026
    Supports: connection project to Coastal Trail led by DOT&PF with Anchorage Parks, environmental document March 2025, final design, municipal ownership
  4. OpenStreetMap relation 15669964 · web · checked Oct 17, 2026
    Supports: mapped parking at Spenard Road and Iris Drive

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.