Fred Meijer Berry Junction Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Fruitland Township, Dalton Township, Muskegon Township and North Muskegon · Muskegon County
Conditions now
Loading the weather near Lakewood Club…
Forecast by the National Weather Service for Lakewood Club · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Michigan DNR Parks and Recreation Division.2
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Cogswell Avenue mile 0 directions to trailhead 1
- Parking at West White Lake Drive mile 0.1 directions to trailhead 2
- Parking at West McMillan Road mile 6.7 directions to trailhead 3
- Parking at West Salem Drive mile 10.3 directions to trailhead 4
(opens in a new tab) About this trail
The Fred Meijer Berry Junction Trail is an 11.5-mile paved trail in Muskegon County, Michigan, running from North Muskegon to White Lake Road near Whitehall, much of it on an abandoned Chesapeake and Ohio Railroad line. The Michigan Department of Natural Resources administers it, and the Friends of the Fred Meijer Berry Junction Trail support it. The line was built by the Chicago and West Michigan Railroad and later operated by the Pere Marquette, the Chesapeake and Ohio (Chessie System) and CSX. The trail takes its name from Berry Junction, a wye where the line to Whitehall, Montague and Hart split from the branch to Fremont, about 30 feet northeast of the trail's River Road crossing. The original 7-mile rail-trail ran from McMillan Road north to White Lake Road; in 2018 a 4.6-mile extension connected North Muskegon to the McMillan Road trailhead, funded by the West Michigan Trails and Greenways Coalition, a DNR Trust Fund grant and local sources.
The south trailhead is the Muskegon Lake Nature Preserve at 2500 Lake Avenue in North Muskegon, where the trail meets the Muskegon Lakeshore Trail; from there the Laketon Trail leads to the Musketawa Trail. The extension follows Whitehall Road and Giles Road before entering the woods. The McMillan Road trailhead has paved parking. The trail passes Michigan's Adventure amusement park and crosses Bear Creek. At the north end it joins the Whitehall Trail, with parking and restrooms at the Whitehall library a mile on and the Hart-Montague Trail trailhead in Montague about 2 miles farther.
DNR data lists the trail as open to hiking, all bikes, cross-country skiing and snowshoeing, with snowmobiles allowed on the rail-trail sections. The DNR scheduled a closure between Giles Road and North Whitehall Road from October 12 to October 22, 2026, for a bridge repair.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Muskegon County Airport, 17.7 km from the trail's middle, 12 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 44 57 68 78 82 80 73 61 48 37 Low °F 21 21 27 37 48 57 62 61 54 43 34 26 Precipitation, in 2.4 2.1 2.4 3.5 3.4 3 2.8 3.1 3.3 3.8 2.9 2.4 Snow, in 29.1 20 7.5 1.8 0 0 0 0 0 0 6.5 22.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1929 Montague sheet (1:48,000); the 1959 Montague sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Mar 2025
- Favorite Paved Bike Trails (GR and Lakeshore) r/grandrapids · Mar 2025 · 26 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Fred Meijer Berry Junction Trail
- RedditSearch Reddit: r/Michigan
Nearby trails
- Lakeshore Trail within 0.2 mi · 29.0 mi, paved
- White Lake Pathway within 0.2 mi · 3.3 mi, paved
- Bear Lake Trail 0.7 mi away · 2.5 mi, paved
- Medbery Bike Trail 2.4 mi away · 1.6 mi, paved
- Hart-Montague Bicycle Trail 2.5 mi away · 22.8 mi, paved
- Laketon Trail 2.6 mi away · 3.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9767609, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “managing_org from Michigan DNR Statewide Railtrails”
- Statewide Railtrails layer, query for Fred Meijer Berry Junction Trail — Michigan DNR Trails open data (ArcGIS REST) · government source · checked Oct 14, 2026 Supports: DNR administration, Muskegon County, asphalt surface, hiking, all bikes, cross-country skiing, snowshoeing and snowmobile designations, October 9, 2026 notice of closure between Giles Road and N. Whitehall Road October 12–22 for bridge repair
- Fred Meijer Berry Junction Trail | Friends of the Berry Junction Trail · web · checked Oct 14, 2026 Supports: 11.5 miles, fully paved, abandoned C&O line, Bear Creek, Michigan's Adventure, Whitehall connection to Hart-Montague, Muskegon Lakeshore Trail, Laketon Trail and Musketawa Trail connections
- Railroad History — Friends of the Berry Junction Trail · web · checked Oct 14, 2026 Supports: Chicago and West Michigan, Pere Marquette, C&O/Chessie and CSX succession, Berry Junction wye location near River Road, lines to Fremont and to Whitehall, Montague and Hart
- 2018 Fred Meijer Berry Junction Trail Extension — Friends of the Berry Junction Trail · web · checked Oct 14, 2026 Supports: 2018 extension of 4.6 miles from North Muskegon to McMillan Road, 7-mile rail-trail north of McMillan Road, route along Whitehall Road and Giles Road, Berry Junction at River Road, extension funding sources
- Trailheads/Parking — Friends of the Berry Junction Trail · web · checked Oct 14, 2026 Supports: Muskegon Lake Nature Preserve trailhead at 2500 Lake Avenue, McMillan Road trailhead parking, north end at White Lake Road joining the Whitehall Trail, Whitehall library parking and restrooms, Montague trailhead
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.