States › Michigan

Lakeshore Trail

Greenway in Michigan · OpenStreetMap relation

Runs through North Muskegon, Muskegon, Grand Haven Township, Port Sheldon Township and Park Township (Ottawa County) · Muskegon and Ottawa counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
29.0 mi 46.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Cabin Parking Only mile 0 directions to Cabin Parking Only
  2. Parking at Holland State Park mile 0 directions to trailhead 2
  3. Parking at Ottawa Beach Road mile 0.2 directions to trailhead 3
  4. Parking at Lake Macatawa Campground mile 0.6 · restrooms directions to trailhead 4
  5. Parking at Lake Macatawa Campground mile 0.7 directions to trailhead 5
  6. Parking at Tunnel Park mile 2.4 directions to trailhead 6
  7. Lot B mile 5.3 directions to Lot B
  8. Lot C mile 5.3 directions to Lot C
  9. Parking mile 18.4 · restrooms directions to trailhead 9
  10. Parking at Terrill Avenue mile 20.2 directions to trailhead 10
  11. Parking directions to trailhead 11
  12. Parking at Dune Street restrooms directions to trailhead 12
  13. Parking at Lakeshore Drive directions to trailhead 13
  14. Parking at Lakeshore Drive directions to trailhead 14
  15. Parking at Lakeshore Drive directions to trailhead 15
  16. Parking at Franklin Street directions to trailhead 16
  17. Parking at Adelaide Circle restrooms directions to trailhead 17
  18. Parking directions to trailhead 18
  19. Parking at Franklin Street directions to trailhead 19
  20. Parking at West Western Avenue directions to trailhead 20
  21. Parking at Terrace Point Drive directions to trailhead 21
  22. Parking at 4th Street directions to trailhead 22
  23. Parking at Viridian Drive directions to trailhead 23
  24. Parking at West Western Avenue directions to trailhead 24
  25. Parking at Veteran's Memorial Causeway directions to trailhead 25
  26. Parking at Veteran's Memorial Causeway directions to trailhead 26
  27. Parking at Lakeshore Drive directions to trailhead 27
  28. Parking at Lakeshore Drive directions to trailhead 28
  29. Parking at Lakeshore Drive directions to trailhead 29
  30. Parking at Lakeshore Drive directions to trailhead 30
  31. Parking at 5th Street directions to trailhead 31
  32. Parking at Viridian Drive directions to trailhead 32
  33. Parking at Terracerace Street directions to trailhead 33
  34. Parking at 5th Street directions to trailhead 34
  35. Parking at West Western Avenue directions to trailhead 35
  36. Parking at Mart Street directions to trailhead 36
  37. Parking directions to trailhead 37
  38. Parking at West Western Avenue directions to trailhead 38
  39. Parking at West Western Avenue directions to trailhead 39
  40. Parking at West Western Avenue directions to trailhead 40
  41. Parking directions to trailhead 41
  42. Parking at Franklin Street directions to trailhead 42
  43. Parking directions to trailhead 43
  44. Parking at Adelaide Circle directions to trailhead 44
  45. Parking at Franklin Street directions to trailhead 45
  46. Parking at Veteran's Memorial Causeway directions to trailhead 46
  47. Parking at Veteran's Memorial Causeway directions to trailhead 47
Railroad tracks, Muskegon (opens in a new tab)
Railroad tracks, Muskegon · Photo: Eric Richardson from Los Angeles · CC BY 2.0 · Wikimedia Commons

About this trail

This Lakeshore Trail record joins two separate paved paths of the same name on Michigan's Lake Michigan shore. The longer, also listed as the Lakeshore Connector Path, runs nearly 20 miles in Ottawa County between Holland and Grand Haven, parallel to Lakeshore Drive. The other is the Muskegon Lakeshore Trail, a bicycle and pedestrian path of about 12 miles in Muskegon that runs from the Muskegon River along Muskegon Lake to Pere Marquette Beach. Part of the Muskegon route follows the old railroad corridor that served the former Sappi paper mill, and native plantings along it have replaced brownfield sites.

The Ottawa County path runs between South 168th Street in Holland and Robbins Road in Grand Haven and gives access to beachfront parks including Kirk Park and Tunnel Park; Lake Michigan can also be reached at James Street and Riley Street, which have no facilities. The path crosses private driveways along the way. In Muskegon, TrailLink lists the ends as Center Street in North Muskegon and West Sherman Boulevard in Muskegon, with parking at Heritage Landing Park. The trail loops around Pere Marquette Park, past the South Pier Light Station and the Muskegon Channel, uses short stretches of on-road bike lanes to join its segments, and connects by a short on-road link to the Laketon Trail and from there to the Musketawa Trail.

High water and storms in the winter of 2019-20 badly damaged the Muskegon trail between Hartshorn Marina and Lakeside. The city repaired the eastern part, including washed-out bridge abutments, and a restoration of the former Amoco tank farm site on Muskegon Lake, carried out with the National Oceanic and Atmospheric Administration, moved the path away from the shoreline into a restored wetland. The trail was raised about two and a half feet above the lake's flood zone and protected with limestone riprap, and it has since fully reopened.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Muskegon County Airport, 17.7 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323444576878828073614837
Low °F212127374857626154433426
Precipitation, in2.42.12.43.53.432.83.13.33.82.92.4
Snow, in29.1207.51.80000006.522.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1930 Muskegon sheet (1:62,500); the 1954 Milwaukee sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2815926, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lakeshore Trail reopens in Muskegon after restoration — FOX 17 West Michigan · web · checked Oct 14, 2026
    Supports: 12-mile bike and pedestrian path from the Muskegon River to Pere Marquette Beach; 2019-20 high water and storm damage between Hartshorn Marina and Lakeside; city repair of the eastern half including bridge abutments; NOAA restoration of the Amoco tank farm site moving the path from the shoreline into the wetland restoration; trail raised about 2.5 feet above the flood zone; limestone riprap; full reopening
  3. Lakeshore Connector Path | Michigan Trails | TrailLink · web · checked Oct 14, 2026
    Supports: nearly 20 miles between Grand Haven and Holland; paved, parallel to Lakeshore Drive; endpoints Robbins Rd. and S 168th St.; Kirk Park and Tunnel Park; Lake Michigan access at James Street and Riley Street without facilities; crosses private driveways
  4. Muskegon Lakeshore Trail | Michigan Trails | TrailLink · web · checked Oct 14, 2026
    Supports: endpoints Center St. (North Muskegon) and W. Sherman Boulevard; Muskegon Lake; on-road bike lane sections; old railroad corridor of the former Sappi paper mill; native plantings replacing brownfields; loop around Pere Marquette Park with South Pier Light Station and Muskegon Channel; on-road link to the Laketon Trail and on to the Musketawa Trail; parking at Heritage Landing Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.