Green Bay Trail (Highland Park)
Rail-trail in Illinois · OpenStreetMap relation
Runs through Highland Park · Lake County
Conditions now
Loading the weather near Highland Park…
Forecast by the National Weather Service for Highland Park · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Green Bay Trail is a rails with trails built on the former Chicago North Shore and Milwaukee Railroad. It runs parallel to Metra's Union Pacific North Line for nearly nine miles from Wilmette, Illinois, to Highland Park, Illinois. It was originally a path used by various users between the Chicago area and the Green Bay, Wisconsin, area.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at St Johns Avenue mile 1.2 directions to trailhead 1
- Ravinia Train Station North parking lot mile 1.3 directions to Ravinia Train Station North parking lot
- Parking at Roger Williams Avenue mile 1.3 · restrooms · water directions to trailhead 3
- Parking at St Johns Avenue mile 1.3 · restrooms · water directions to trailhead 4
- Parking at Roger Williams Avenue mile 1.3 · restrooms · water directions to trailhead 5
- Parking at Dean Avenue mile 1.4 · restrooms · water directions to trailhead 6
- Parking at Burton Avenue mile 1.4 · restrooms · water directions to trailhead 7
- Parking at St Johns Avenue mile 1.4 · restrooms · water directions to trailhead 8
- South Parking Lot mile 2 · restrooms directions to South Parking Lot
- Braeside Metra Station East Lot mile 2.3 directions to Braeside Metra Station East Lot
- Braeside Metra Station West Lot mile 2.3 directions to Braeside Metra Station West Lot
(opens in a new tab) About this trail
This record is the Highland Park section of the Green Bay Trail, the rail-trail on the former Chicago North Shore and Milwaukee Railroad beside Metra's Union Pacific North Line on Chicago's North Shore. It runs about 2.3 miles from Lake Cook Road north past the Braeside and Ravinia Metra stations and through the site of the Ravinia Festival toward downtown Highland Park. The City of Highland Park calls the route the Robert McClory Bike Path, also known as the Green Bay Trail. Wikipedia describes the stretch between Glencoe and the Highland Park station as mostly crushed stone. Since 2017 the city and the Park District of Highland Park have replaced buckthorn along the trail with native plantings.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chicago Botanic Garden, 3 km from the trail's middle, 13 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 36 46 57 68 78 84 82 75 63 49 38 Low °F 16 19 28 38 48 57 63 62 55 43 32 22 Precipitation, in 2.1 2 2.3 4 4.8 4.3 3.7 4.2 3.6 3.6 2.6 2.3 Snow, in 11.3 7.7 5.6 1.1 0 0 0 0 0 0.1 1.9 5.9 - On the National Register
- Linden Park Place-Belle Avenue Historic District, Highland Park · historic district, listed 1983 · nomination file for Linden Park Place-Belle Avenue Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1900 Highwood sheet (1:62,500); the 1953 Highland Park sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Green Bay Trail
Nearby trails
- Green Bay Trail within 0.2 mi · 5.1 mi, paved
- Robert McClory Bike Path 0.8 mi away · 21.6 mi, paved
- North Branch Black Paved Trail 1.1 mi away · 4.5 mi, paved
- Skokie Valley Trail 1.2 mi away · 9.6 mi, paved
- Buffalo Grove-Lincolnshire Bike Path 2.4 mi away · 3.9 mi, paved
- North Branch Red Trail 2.5 mi away · 15.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 8676809, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Green Bay Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q5602351, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Green Bay Trail - Wikipedia · organization · checked Oct 15, 2026 Supports: built on the former Chicago North Shore and Milwaukee Railroad, parallel to Metra's Union Pacific North Line, Braeside and Ravinia stops, route through the site of the Ravinia Festival in Highland Park, crushed stone between the Highland Park station and Glencoe
- McClory Trail Pollinator Garden - City of Highland Park, IL · web · checked Oct 15, 2026 Supports: Robert McClory Bike Path also known as the Green Bay Trail, 2017 ComEd Green Region grant, buckthorn removal and native plantings by the city and the Park District of Highland Park from 2017
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.