States › Illinois

Robert McClory Bike Path

Rail-trail in Illinois · OpenStreetMap relation

Runs through Winthrop Harbor, Zion, Beach Park, Waukegan, North Chicago, Lake Bluff, Lake Forest, Highland Park and 1 more · Lake County

All 9 towns and places

Winthrop Harbor, Zion, Beach Park, Waukegan, North Chicago, Lake Bluff, Lake Forest, Highwood and Highland Park

Conditions now

Loading the weather near Waukegan…

Forecast by the National Weather Service for Waukegan · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
21.6 mi 34.8 km1
On former railbed
18.3 mi 85%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Western Avenue mile 7.6 directions to trailhead 1
  2. Parking at Edison Court mile 9 directions to trailhead 2
  3. Parking at West Cornelia Avenue mile 9.1 directions to trailhead 3
  4. Parking at Washington Street mile 9.2 directions to trailhead 4
  5. Parking at South Jackson Street mile 9.3 directions to trailhead 5
  6. Parking at Glenn Drive mile 10.5 directions to trailhead 6
  7. Parking at Jacobson Drive mile 10.6 directions to trailhead 7
  8. Parking at Sheridan Road mile 12.9 directions to trailhead 8
  9. Metra Great Lakes Parking mile 13.1 directions to Metra Great Lakes Parking
  10. Parking at Sheridan Road mile 14.8 · restrooms directions to trailhead 10
  11. Parking at East Scranton Avenue mile 14.9 · restrooms directions to trailhead 11
  12. Parking at East North Avenue mile 14.9 · restrooms directions to trailhead 12
  13. Parking at East North Avenue mile 14.9 · restrooms directions to trailhead 13
  14. Parking at Walnut Avenue mile 14.9 directions to trailhead 14
  15. Parking at East Woodland Road mile 16.5 directions to trailhead 15
  16. Parking at North McKinley Road mile 16.6 directions to trailhead 16
  17. Parking at North McKinley Road mile 16.8 directions to trailhead 17
  18. Gorton Center Overflow Lot mile 16.9 directions to Gorton Center Overflow Lot
  19. Parking at North McKinley Road mile 16.9 directions to trailhead 19
  20. Parking at North McKinley Road mile 16.9 directions to trailhead 20
  21. Parking at East Deerpath mile 16.9 directions to trailhead 21
  22. Gorton Center Parking Lot mile 17 directions to Gorton Center Parking Lot
  23. Parking at North McKinley Road mile 17 directions to trailhead 23
  24. Parking at Vine Avenue mile 17.1 directions to trailhead 24
  25. Parking at Sheridan Road mile 19.4 directions to trailhead 25
  26. Parking at Western Avenue mile 19.6 directions to trailhead 26
  27. Parking at Sheridan Road mile 19.6 directions to trailhead 27
  28. Parking at Sheridan Road mile 20.1 directions to trailhead 28
  29. Parking at Sheridan Road mile 20.2 directions to trailhead 29
  30. Parking at Sheridan Road mile 20.2 directions to trailhead 30
  31. Parking at Sheridan Road mile 20.2 directions to trailhead 31
  32. Parking at Sheridan Road mile 20.2 directions to trailhead 32
  33. Parking at Sheridan Road mile 20.3 directions to trailhead 33
  34. Parking at Washington Avenue mile 20.3 directions to trailhead 34
  35. Parking at Washington Avenue mile 20.3 directions to trailhead 35
  36. Parking at Washington Avenue mile 20.3 directions to trailhead 36
  37. Parking at Sheridan Road mile 20.3 directions to trailhead 37
  38. Parking at Sheridan Road mile 20.4 directions to trailhead 38
  39. Parking at 4th Street mile 20.4 directions to trailhead 39
  40. Parking at Washington Avenue mile 20.4 directions to trailhead 40
  41. Parking at Webster Avenue mile 20.5 directions to trailhead 41
  42. Parking at Sheridan Road mile 20.5 directions to trailhead 42
  43. Parking at C Street mile 20.6 directions to trailhead 43
  44. Parking at Webster Avenue mile 20.7 directions to trailhead 44
  45. Parking at Webster Avenue mile 20.7 directions to trailhead 45
  46. Parking at Walker Avenue mile 20.8 directions to trailhead 46
  47. Parking at Waukegan Avenue mile 20.8 directions to trailhead 47
  48. Parking at Walker Avenue mile 20.8 directions to trailhead 48
  49. Parking at Walker Avenue mile 20.8 directions to trailhead 49
  50. Parking at Temple Avenue mile 20.9 directions to trailhead 50
  51. Parking at Lauretta Place mile 20.9 directions to trailhead 51
  52. Parking at Lauretta Place mile 20.9 directions to trailhead 52
  53. Parking at Walker Avenue mile 20.9 directions to trailhead 53
  54. Parking at Waukegan Avenue mile 21.1 directions to trailhead 54
  55. Parking at Burtis Avenue mile 21.1 directions to trailhead 55
  56. Parking at Trillium Lane mile 21.1 directions to trailhead 56
  57. Parking at Vine Avenue mile 21.6 directions to trailhead 57

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

Robert McClory Bike Path in Waukegan, IL - July 2025 (opens in a new tab)
Robert McClory Bike Path in Waukegan, IL - July 2025 · Photo: AlphaBeta135 · CC BY · Wikimedia Commons

About this trail

The Robert McClory Bike Path is a rail-trail in Lake County, Illinois, that runs the length of the county through the communities of Chicago's North Shore to the Wisconsin border. It mostly follows the route of the Chicago North Shore and Milwaukee Railroad, an electric interurban whose Shore Line Route ran parallel to Sheridan Road between Wilmette and North Chicago. Passenger service on the Shore Line Route ended in 1955, and the railroad stopped operating altogether in 1963. A section of the path was certified as a National Recreation Trail on February 4, 1982, with the City of Lake Forest listed as its public contact. In 1997 the path was named for Robert McClory, a congressman who had served the area for 20 years.

TrailLink gives the length as 25.4 miles, from the Kenosha County Bike Trail at the Wisconsin state line to the Braeside Metra station in Highland Park. Metra trains between Chicago and Kenosha run on Union Pacific tracks that parallel much of the trail. North of Waukegan the route passes parks and open space. In Lake Bluff it crosses the North Shore Bike Path and leaves the rail corridor for a few blocks of a light-industrial district, then runs beside the Metra line to Lake Forest. For about 1.5 miles it skirts Fort Sheridan, a former Army post, and farther south it passes the Highland Park and Ravinia Metra stations before ending at Braeside.

The surface is asphalt in the south, concrete where the path leaves the rail corridor to follow city streets, and finely screened limestone in the north. In Lake Forest, the city identified the path as a priority in its 2023 community survey and received an Illinois Department of Natural Resources grant award in October 2024. In May 2025 the city council awarded a $236,664 contract for the 2025 McClory Bike Path resurfacing project, with construction planned for July 7 to August 1.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chicago Waukegan Regional Airport, 8.8 km from the trail's middle, 23 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444566777818073614836
Low °F161827364656626154433122
Precipitation, in1.41.52.23.83.94.53.53.63.63.22.31.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1906 Waukegan sheet (1:62,500); the 1960 Waukegan sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in June and October 2025 said the limestone sections turned soft and muddy after rain, and one suggested county roads instead for road bikes. r/chibike, Jun 2025 · r/chibike, Oct 2025
  • In October 2025 one rider said the limestone sections were being paved and might not be finished; in May 2026 another said the northern Illinois stretch was paved, having been crushed stone in 2024. r/chibike, Oct 2025 · r/chibike, May 2026
  • Riders in 2025 and 2026 described street crossings every quarter to half mile that broke up any rhythm, and one rider in 2026 said trees and brush hid cross traffic. r/chibike, Jun 2025 · r/chibike, Oct 2025 · r/chibike, May 2026
  • In 2025 several riders advised bypassing the path around Waukegan on Sheridan Road or parallel Jackson Street, while in 2024 several riders on a Kenosha thread preferred the path to Sheridan for safety. r/Kenosha, Jul 2024 · r/chibike, Oct 2025
9 Reddit threads about this trail, Aug 2022 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9762984, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Chicago North Shore and Milwaukee Railroad — Wikipedia · organization · checked Oct 14, 2026
    Supports: electric interurban; Shore Line Route from Wilmette to North Chicago Junction parallel to Sheridan Road; Shore Line passenger service discontinued 1955; end of the railroad's operation in 1963
  3. Robert McClory Trail — National Recreation Trails Database (American Trails) · organization · checked Oct 14, 2026
    Supports: certified as a National Recreation Trail February 4, 1982; public contact City of Lake Forest
  4. Robert McClory Bike Path — Lake County, Illinois, Convention & Visitors Bureau · organization · checked Oct 14, 2026
    Supports: runs the length of Lake County through North Shore communities to the Wisconsin border; named in 1997 for a congressman who served the area for 20 years; asphalt in the south, concrete on city streets, screened limestone in the north
  5. Proceedings of the Monday, May 5, 2025 City Council Meeting — City of Lake Forest · web · checked Oct 14, 2026
    Supports: path a priority in the 2023 community-wide survey; IDNR grant award letter dated 10/24/24; $236,664 contract for the 2025 McClory Bike Path Resurfacing project; construction anticipated July 7 to August 1
  6. Robert McClory Bike Path | Illinois Trails — TrailLink · web · checked Oct 14, 2026
    Supports: 25.4 miles; endpoints at the Kenosha County Bike Trail (state line) and Braeside Metra station; mostly follows the Chicago North Shore and Milwaukee Railroad; Metra on Union Pacific tracks parallels much of the trail; parks north of Waukegan; crosses North Shore Bike Path in Lake Bluff; light-industrial blocks; 1.5 miles past Fort Sheridan; Highland Park and Ravinia stations

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.