Gilleland Creek Trail
Greenway in Texas
Runs through Pflugerville · Travis County
Conditions now
Loading the weather near Pflugerville…
Forecast by the National Weather Service for Pflugerville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Railroad Avenue mile 2.4 directions to trailhead 1
- Parking at City Park Road mile 2.5 · restrooms directions to trailhead 2
- Parking at Pfennig Lane mile 3.8 directions to trailhead 3
About this trail
The Gilleland Creek Trail is a concrete hike-and-bike trail in Pflugerville, Texas, following Gilleland Creek through the middle of the city between Northeast Metropolitan Park and Grand Avenue Parkway. TrailLink gives its length as 6.5 miles point to point and describes it as the longest hike-and-bike trail in Pflugerville; this record maps about 4.1 miles of it. It is a creek greenway, not a rail-trail.
The east end lies in Northeast Metropolitan Park, a 349-acre Travis County park with sports fields, a skate park and a BMX track; parking there may carry a fee. From the park the trail runs north to Pecan Street and follows the wooded creek banks past a small parking lot in Bohls Park on Immanuel Road. The section to Railroad Avenue forms part of the Heritage Trail loop. West of Railroad Avenue the trail passes the Gilleland Creek Pool and runs through Pfluger, Kuemple, Pfenning and Swenson parks toward Grand Avenue Parkway, with short loops and spurs into neighborhoods. The record shows parking at North Railroad Avenue, City Park Road (with restrooms) and Pfennig Lane. To the south, Travis County plans the Gilleland Creek Greenway, a roughly 19-mile corridor from Northeast Metro Park to the Colorado River with a planned 15-foot-wide concrete trail.
In February 2026 the City of Pflugerville closed a portion of the trail for about a year to build connections to its Downtown East project, which includes a new city hall and the Monarch Recreation Center; a signed detour adds about 0.2 mile.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin-Camp Mabry, 19.2 km from the trail's middle, 3 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 66 73 80 87 93 97 98 91 82 72 64 Low °F 42 46 52 59 67 73 75 75 70 61 50 43 Precipitation, in 2.6 1.9 2.9 2.4 5 3.7 2 2.7 3.5 3.9 2.9 2.7 Snow, in 0 0.2 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1968 Pflugerville East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Pflugerville Hike and Bike Trail within 0.2 mi · 2.7 mi, paved
- Pflugerville Heritage Trail within 0.2 mi · 1.9 mi, paved
- Brushy Creek Trail 3.8 mi away · 1.6 mi, paved
- Lake Creek trail 4.3 mi away · 1.9 mi, paved
- Northern Walnut Creek Trail 4.4 mi away · 4.8 mi, paved
- Brushy Creek Regional Trail 4.7 mi away · 6.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Gilleland Creek Greenway — Travis County, Texas · government source · checked Oct 15, 2026 Supports: planned Gilleland Creek Greenway from NE Metro Park in Pflugerville to the Colorado River, roughly 19 miles, planned 15-foot-wide concrete trail
- Portion of Gilleland Creek Trail in Pflugerville to close — Community Impact (February 9, 2026) · web · checked Oct 15, 2026 Supports: closure from Feb. 17, 2026 for about a year for Downtown East connections to the city hub and Monarch Recreation Center; detour adds about 1,000 feet (0.2 mile); new city hall
- Gilleland Creek Trail — TrailLink · web · checked Oct 15, 2026 Supports: 6.5 miles, concrete, Northeast Metro Park to Grand Avenue Parkway, longest hike and bike trail in Pflugerville, NE Metro Park 349 acres and facilities, possible parking fee, Pecan Street, Bohls Park lot on Immanuel Road, Heritage Trail loop to Railroad Avenue, Gilleland Creek Pool, Pfluger, Kuemple, Pfenning and Swenson parks, neighborhood spurs
- OpenStreetMap ways for this trail · web · checked Oct 15, 2026 Supports: mapped length; parking at North Railroad Avenue, City Park Road (restrooms) and Pfennig Lane
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.