Northern Walnut Creek Trail
Greenway in Texas · OpenStreetMap relation
Runs through Austin · Travis County
Conditions now
Loading the weather near Austin…
Forecast by the National Weather Service for Austin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Amherst Drive mile 0 · restrooms · water directions to trailhead 1
- Staff Parking mile 1.2 directions to Staff Parking
- Parking at Park Bend Drive mile 1.3 directions to trailhead 3
- Parking at Metric Boulevard mile 2.2 directions to trailhead 4
- Parking at Walnut Creek Park Road mile 3.3 · water directions to trailhead 5
- Parking at Walnut Creek Park Road mile 3.3 · water directions to trailhead 6
- Parking at Thompkins Drive mile 5.4 directions to trailhead 7
(opens in a new tab) About this trail
The Northern Walnut Creek Trail is a paved urban trail along Walnut Creek in north Austin, Texas, and the northern part of the Walnut Creek Regional Trail system. Austin's Parks and Recreation Department proposed that system in the late 1990s as the city's first regional trail; when complete it is to run about 20 miles from Balcones District Park in northwest Austin to Govalle Park in southeast Austin, where an 8.7-mile southern section to Johnny Morris Road was completed in 2014. The northern trail has been built by Parks and Recreation with the city's Urban Trails program. This record maps about 4.8 miles.
Phases 1 and 1A run 3.5 miles from Balcones District Park to Walnut Creek Metropolitan Park; the parks department lists Phase 1 as completed in 2014 and Phase 1A in 2019, while an Urban Trails briefing says the trail opened in 2015 and was extended west in 2019. Section 2A, a 1.3-mile, 12-foot-wide concrete trail, continues from a trailhead in Walnut Creek Metropolitan Park east under Lamar Boulevard to Oakbrook Drive; construction began in October 2021 and the ribbon was cut on March 4, 2023. On OpenStreetMap the west end, at Amherst Drive, has parking, water and restrooms.
Further sections are planned east toward the Southern Walnut Creek Trail. In September 2024 the Urban Trails program reported Sections 2B and 3A funded and at 60 percent design, with final design expected in late spring 2025 and construction to start in summer 2025; Section 2B's proposed alignment crosses under IH-35, and Section 3A includes a pedestrian bridge in an LCRA easement. Sections 3A South and 3C, with a proposed tunnel under Old Manor Road and a crossing under US 290, were in feasibility review at an early estimate of $5.8 million.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin-Camp Mabry, 11.1 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 66 73 80 87 93 97 98 91 82 72 64 Low °F 42 46 52 59 67 73 75 75 70 61 50 43 Precipitation, in 2.6 1.9 2.9 2.4 5 3.7 2 2.7 3.5 3.9 2.9 2.7 Snow, in 0 0.2 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1968 Pflugerville West sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesAustin Parks and Recreation: Walnut Creek Regional Trail
Nearby trails
- MoPac Trail (Capital of Texas Highway to Walnut Creek) within 0.2 mi · 2.1 mi, paved
- Red Line Parkway Trail 0.7 mi away · 6.4 mi, paved
- Shoal Creek Trail 2.4 mi away · 3.0 mi, paved
- Pflugerville Hike and Bike Trail 3.7 mi away · 2.7 mi, paved
- Lake Creek trail 4.1 mi away · 1.9 mi, paved
- Gilleland Creek Trail 4.4 mi away · 4.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15054153, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Walnut Creek Regional Trail — Austin Parks and Recreation, AustinTexas.gov · government source · checked Oct 15, 2026 Supports: regional system proposed late 1990s as first regional trail; about 20 miles Balcones District Park to Govalle Park; 8.7 miles Govalle Park to Johnny Morris Rd completed 2014; Phases 1 and 1A 3.5 miles Balcones District Park to Walnut Creek Metropolitan Park, completed 2014 and 2019; Section 2A 1.3 miles, 12-foot concrete, under Lamar Blvd to Oakbrook Dr, construction from October 2021, ribbon cutting March 4, 2023; partnership with Urban Trails program
- "The Big Loop" Urban Trails Update, Mobility Committee, September 19, 2024 — City of Austin · government source · checked Oct 15, 2026 Supports: opened 2015, extended west 2019 and east 2023; Sections 2B and 3A funded, 60% design, 100% design late spring 2025, construction start summer 2025; 2B alignment under IH-35; 3A bridge in LCRA easement; 3A South and 3C feasibility review, $5.8 million early estimate, tunnel under Old Manor Rd, crossing under US 290
- Northern Walnut Creek Trail (relation 15054153) — OpenStreetMap · web · checked Oct 15, 2026 Supports: trailhead with parking, water and restrooms at Amherst Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.