States › North Carolina

Green Hope School Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Cary · Wake County

Conditions now

Loading the weather near Cary…

Forecast by the National Weather Service for Cary · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.8 directions to trailhead 1
  2. Parking at Brassica Lane mile 1.1 directions to trailhead 2
Green Hope School Greenway (opens in a new tab)
Photo: hamzakhan · CC BY-SA 4.0 · Mapillary

About this trail

The Green Hope School Greenway is a Town of Cary greenway in the Highcroft neighborhood of Cary, North Carolina. It is not a rail-trail. It is a collection of short shared-use paths through the neighborhood rather than one continuous trail: the town's greenway inventory lists about 1.9 miles of existing segments, owned and maintained by Cary, some built by the town and others by developers as subdivisions went in, including Highcroft Phase 2D (2006), Highcroft Village (2012) and Fryars Gate Phase 5 (2017).

TrailLink gives the trail as 2.6 miles between Morrisville Parkway and the Batchelor Branch Greenway, with gaps bridged by quiet residential streets. The town's segment list runs from the Batchelor Branch Greenway to Edgemore Avenue and Sears Farm Road Park, from the park to Highcroft Elementary School, through Highcroft Village to Green Hope School Road, and on to the Morrisville Parkway street-side trail. Parking and restrooms are at Sears Farm Road Park, 5077 Sears Farm Road, which has a large interactive play sculpture.

Most segments are 10-foot asphalt, with shorter concrete sections 7 to 9 feet wide along Sears Farm Road, Green Hope School Road and between Edgemore Avenue and the park. This record maps about 1.9 miles in a dozen pieces, from Morrisville Parkway south to the Batchelor Branch Greenway.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Apex, 7.8 km from the trail's middle, 24 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F515462727986898782726254
Low °F313339485765696862504034
Precipitation, in3.634.13.63.84.35.14.65.33.73.53.7
Snow, in2.910.400000000.30.2
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Green Hope School Greenway (opens in a new tab)
  1. 360° view 1 of 2, photo by hamzakhan
  2. 360° view 2 of 2, photo by hamzakhan
360° panorama · Photo: hamzakhan · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 4582023, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenway Trails Existing and Proposed — Town of Cary Open Data · organization · checked Oct 16, 2026
    Supports: Green Hope School Greenway segments (all existing, about 1.9 miles in total): Batchelor Branch Greenway to Edgemore Ave; Edgemore Ave to Sears Farm Rd Park; Sears Farm Rd Park to Highcroft Elem; Highcroft Village GW to Green Hope School Rd; Morrisville Pkwy SS Trail to Highcroft SS Trail; Sears Farm Road; Green Hope School Road; owned and maintained by Cary; built by Cary or developers; Highcroft Phase 2D (2006), Highcroft Village (2012), Fryars Gate Phase 5 (2017); widths and surfaces (10-ft asphalt; 7-9-ft concrete)
  3. Green Hope School Greenway — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026
    Supports: 2.6 miles between Morrisville Parkway and the Batchelor Branch Greenway; collection of shared-use paths through Cary's Highcroft neighborhood; connects Highcroft Elementary, Sears Farm Road Park and the Batchelor Branch Greenway; gaps bridged by residential streets; parking and restrooms at Sears Farm Road Park, 5077 Sears Farm Rd.; interactive play sculpture
  4. Green Hope School Greenway (relation 4582023) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: record length of about 1.9 miles in about a dozen pieces from Morrisville Parkway south to the Batchelor Branch Greenway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.