States › North Carolina

Woodlands Greenway

Greenway in North Carolina

Runs through Cary · Wake County

Conditions now

Loading the weather near Cary…

Forecast by the National Weather Service for Cary · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Woodlands Greenway (opens in a new tab)
Photo: hamzakhan · CC BY-SA 4.0 · Mapillary

About this trail

The Woodlands Greenway is a set of short asphalt greenway paths in western Cary, North Carolina, around the Woodlands at Green Level Crossing and Toscana subdivisions near Mills Road and Green Level Church Road. It is not a rail-trail. The Town of Cary's greenway inventory lists about 1 mile of town-owned and town-maintained segments, all built by developers: a path along Mills Road and a link from Ashley Rose Drive, both completed in 2008 with the Woodlands at Green Level Crossing; a path along the Green Level Church Road frontage of Toscana, completed in 2014; and a link from Thomas Brooks Park to Green Level Church Road. The inventory gives widths of 8 to 10 feet.

The inventory also lists privately owned Woodlands greenway paths and homeowners' association connectors, including a path from Misty Springs Court to the Flat Branch Greenway, and a short proposed piece along Green Level Church Road. OpenStreetMap maps about 1.4 miles under the Woodlands Greenway name, some ways marked as operated by Cary and others as private, all asphalt and designated for bicycles and pedestrians.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

57% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Apex, 8 km from the trail's middle, 41 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F515462727986898782726254
Low °F313339485765696862504034
Precipitation, in3.634.13.63.84.35.14.65.33.73.53.7
Snow, in2.910.400000000.30.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Woodlands Greenway (opens in a new tab)
360° panorama · Photo: hamzakhan · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenway Trails Existing and Proposed — Town of Cary Open Data · organization · checked Oct 17, 2026
    Supports: Woodlands Greenway segments: along Mills Rd and Ashley Rose Drive link (2008, The Woodlands at Green Level Crossing), along Green Level Church Rd frontage of Toscana (2014), Thomas Brooks Park to GLC Rd; built by developers; owned and maintained by Cary; 8-10 ft asphalt; Woodlands private greenway and HOA connectors, including Misty Springs Court to Flat Branch Greenway; proposed segment along GLC Rd
  3. Woodlands Greenway — OpenStreetMap way 217820118 (one of the record's ways) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: name; asphalt; bicycle and foot designated; operator Cary on some ways and private on others; mapped length about 1.4 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.