States › Ohio

Greenway Corridor (Painesville)

Rail-trail in Ohio · OpenStreetMap relation

Runs through Painesville · Lake County

Conditions now

Loading the weather near Painesville…

Forecast by the National Weather Service for Painesville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.6 mi 7.4 km1
On former railbed
3.8 mi 83%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Johnnycake Ridge Road mile 1.6 · restrooms · water directions to trailhead 1
  2. Parking at Greenway Corridor mile 6.3 directions to trailhead 2
Painesville, along the trail (opens in a new tab)
Painesville, along the trail · Photo: Niagara · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Greenway Corridor is a paved rail-trail in Lake County, Ohio, managed by Lake Metroparks. It runs 4.8 miles and links Painesville, Painesville Township and Concord Township. The trail follows a railroad line whose original tracks, linking the national rail system to Lake Erie, were laid in Lake County in 1870 and acquired by the Baltimore & Ohio Railroad in the 1890s. The railroad carried freight in and out of Painesville, some five million tons of coal and iron ore a year. The trail was funded through a federal ISTEA highway grant administered by the Ohio Department of Transportation.

From Painesville, at an elevation of 660 feet, the trail climbs to 895 feet in Concord Township and crosses two bridges. Lake Metroparks lists access at Route 84 and Liberty Street in Painesville; at the Old Stone School, 7125 Ravenna Road, and at 7371 Ravenna Road in Concord Township; at 10850 Girdled Road; and at Jordan Creek Park on Alexander Road. The southern end connects with the Maple Highlands Trail to Chardon. Off the corridor in Concord Township, a 0.3-mile pedestrian trail leads to a waterfall known locally as Chair Factory Falls, which had been privately owned; Lake Metroparks built the trail after 4.5 acres were donated, and the path down to the overlook is steep.

The trail is open from 6 a.m. to 11 p.m. and is listed for biking and hiking, with drinking water and pit and portable restrooms. The record here maps about 5.1 miles in three pieces, including a short separate piece at the southern end.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

53% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Painesville 4 NW, 8.5 km from the trail's middle, 42 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373946586978828276655342
Low °F242430405162676659493930
Precipitation, in3.12.12.83.53.43.64.13.43.943.23.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1904 Chardon sheet (1:62,500); the 1960 Painesville sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9718936, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenway Corridor — Lake Metroparks · web · checked Oct 14, 2026
    Supports: 4.8 miles, paved, Painesville, Painesville Township and Concord Township, 1870 tracks, B&O acquisition in the 1890s, coal and iron ore freight, ISTEA grant via ODOT, two bridges, 660 to 895 ft elevation, access points, Maple Highlands Trail connection, Chair Factory Falls trail and donation, hours, activities, amenities
  3. Greenway Corridor — OpenStreetMap relation 9718936 · web · checked Oct 14, 2026
    Supports: record extent and pieces

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.