Maple Highlands Trail
Rail-trail in Ohio · OpenStreetMap relation
Runs through Chardon and Middlefield · Geauga County
Conditions now
Loading the weather near Aquilla…
Forecast by the National Weather Service for Aquilla · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Industrial Parkway mile 4.6 directions to trailhead 1
- Parking at Center Street mile 5 directions to trailhead 2
- Parking at Cherry Avenue mile 5 directions to trailhead 3
- Parking at 6th Avenue mile 5 directions to trailhead 4
- Parking at Center Street mile 5.1 directions to trailhead 5
- Parking at Center Street mile 5.1 directions to trailhead 6
- Parking at Center Street mile 5.1 directions to trailhead 7
- Parking at Cherry Avenue mile 5.1 directions to trailhead 8
- Parking at Water Street mile 5.2 directions to trailhead 9
- Parking at Water Street mile 5.2 directions to trailhead 10
- Parking at Water Street mile 5.2 directions to trailhead 11
- Parking at Water Street mile 5.2 directions to trailhead 12
- Parking at Plaza Drive mile 5.3 directions to trailhead 13
- Parking at Water Street mile 5.3 directions to trailhead 14
- Parking at Plaza Drive mile 5.4 directions to trailhead 15
- Parking at Park Avenue mile 5.5 · restrooms · water directions to trailhead 16
- Parking at South Street mile 6.1 · water directions to trailhead 17
- Parking at West Barrington Lane mile 6.1 · water directions to trailhead 18
- Parking at Burlington Oval Drive mile 6.1 · water directions to trailhead 19
- Parking at Claridon Road mile 6.2 directions to trailhead 20
- Parking at North State Avenue mile 14.3 directions to trailhead 21
- Parking at North State Avenue mile 17.7 directions to trailhead 22
- Parking at Grant Street mile 17.8 directions to trailhead 23
- Parking at West High Street mile 17.8 directions to trailhead 24
- Parking at North State Avenue mile 17.8 directions to trailhead 25
- Parking at North State Avenue mile 17.8 directions to trailhead 26
- Parking at West High Street mile 17.8 directions to trailhead 27
- Parking at West High Street mile 17.8 directions to trailhead 28
- Parking at East High Street mile 17.9 directions to trailhead 29
- Parking at East High Street mile 17.9 directions to trailhead 30
- Parking at East High Street mile 17.9 directions to trailhead 31
- Parking at North State Avenue mile 17.9 directions to trailhead 32
- Parking at Sperry Lane mile 17.9 directions to trailhead 33
- Parking at Sperry Lane mile 18 directions to trailhead 34
- Parking at Mill Street mile 18 directions to trailhead 35
- Parking at Sperry Lane mile 18 directions to trailhead 36
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Maple Highlands Trail is an asphalt rail-trail run by the Geauga Park District across Geauga County, Ohio, from near the Lake County line through Chardon to Middlefield Township. The park district lists 21.1 miles in its sections: North (4.7 miles), City of Chardon (1.2 miles), Central (8.3 miles) and South (6.9 miles, of which 3.5 miles belong to the Village of Middlefield), plus the Big Creek Spur and the Chardon Run Way connector at Mountain Run Station. At its northern end it meets Lake Metroparks' Greenway Corridor, which follows a rail line laid in Lake County in 1870 and acquired by the Baltimore & Ohio Railroad in the 1890s; the railroad hauled coal and iron ore in and out of Painesville.
The trail passes woodlands, wetlands, farm fields and Amish neighborhoods, and crosses two covered bridges in the south. The South section begins at State Route 608 at Headwaters Park and the East Branch Reservoir, crosses Durkee and Burton Windsor roads to Tare Creek Parkway in Middlefield, then resumes at Johnston Street, crosses State Route 528 and ends at Bridge Road in Middlefield Township. The park district and the village paved parts of that section in November 2017 with funding from the Ohio Department of Natural Resources.
Parking is at the Big Creek Spur trailhead, 9280 Ravenna Road in Chardon Township, and at Mountain Run Station, Claridon Woodlands, Headwaters Park and Swine Creek Reservation, with partner lots in Chardon and Middlefield. The trail itself has no restrooms; the parks along it do. It is open dawn to dusk. Horseback riding is allowed only on the South section, where bicyclists and walkers yield to horses.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chardon, 4.6 km from the trail's middle, 11 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 44 58 69 77 81 80 73 61 48 38 Low °F 17 16 24 35 46 55 59 57 51 41 32 24 Precipitation, in 4.2 3.1 3.7 4.3 4.4 4.5 4.7 4.1 4.5 4.5 4.3 4.3 Snow, in 34.4 23.4 16.5 4 0 0 0 0 0 0.6 9.3 25.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1904 Chardon sheet (1:62,500); the 1953 Chardon sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- One rider in September 2024 said the trail is asphalt except for a chipstone stretch south of Headwaters Park, which is shared with horses and buggies. r/BikeCLE, Sep 2024
- Two riders, in September 2024 and 2025, called the trail mostly flat; one added that the climbs and the traffic noise from Route 44 are north of Chardon. r/BikeCLE, Sep 2024 · r/Cleveland, Sep 2025
- One rider in August 2025, days after a reported tornado in Middlefield, saw branches, leaves and a few cut-up fallen trees on the pavement heading toward the Middlefield end. r/Ohio, Aug 2025
- One rider in September 2024 said they pair a ride on the 2-mile gravel trail at Headwaters Park, part of the Buckeye Trail, with time on the Maple Highlands. r/gravelcycling, Sep 2024
4 Reddit threads about this trail, Sep 2024 to Sep 2025
- Good biking in the Chagrin falls area? r/BikeCLE · Sep 2024 · 5 comments
- Cleveland Ohio? r/gravelcycling · Sep 2024 · 11 comments
- Places to cruise on a skateboard in Northeast Ohio? r/Cleveland · Sep 2025 · 6 comments
- Tornado touched down in Middlefield last night r/Ohio · Aug 2025 · 15 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesThe Maple Highlands Trail — Geauga Park District
- RedditSearch Reddit: r/Ohio
Nearby trails
- Greenway Corridor (Painesville) within 0.2 mi · 4.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9369464, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- The Maple Highlands Trail, Chardon — Geauga Park District · organization · checked Oct 14, 2026 Supports: asphalt, 21.1 miles, section lengths, Middlefield-owned 3.5 miles, connectors, landscape, two covered bridges to the south, parking locations and 9280 Ravenna Road, no facilities on the trail, dawn-to-dusk hours, horseback riding only on South section
- Greenway Corridor — Lake Metroparks · web · checked Oct 14, 2026 Supports: Greenway Corridor connects to the Maple Highlands Trail; rail line laid in Lake County in 1870, acquired by the B&O in the 1890s, coal and iron ore freight through Painesville
- New Park District Trail Paves the Way in Middlefield — Geauga County Maple Leaf (2017-11-16) · web · checked Oct 14, 2026 Supports: South section route from SR 608 at Headwaters Park to Tare Creek Parkway and from Johnston Street across SR 528 to Bridge Road, November 2017 paving by park district and village, ODNR funding
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.