Halls Bayou Greenway Trail
Greenway in Texas
Runs through Houston · Harris County
Conditions now
Loading the weather near Houston…
Forecast by the National Weather Service for Houston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Aldine Westfield Road mile 0 directions to trailhead 1
(opens in a new tab) About this trail
The Halls Bayou Greenway Trail is a paved hike-and-bike trail along Halls Bayou in north Houston, Texas, part of the Bayou Greenways program of the Houston Parks Board, a public-private partnership building 150 miles of trails along the city's major bayous. Halls Bayou rises in northwest Houston and flows 17 miles southeast to meet Greens Bayou near Brock Park; once called the south fork of Greens Bayou, it was renamed in the 1880s, apparently for landowner Archibald S. Hall. This record maps about 10.6 miles of trail in several pieces, from Aldine Westfield Road in the west to Brock Park in the east.
The Parks Board lists Keith-Wiess Park, Mary Withers Park, Tidwell Park, Lake Forest Park and Brock Park along the greenway. In August 2017 it finished the segment from Brock Park to Banting Street, with a boardwalk over wetlands through a palmetto forest, educational signs and a gateway entrance at Brock Park. Construction then began on the next segment, about three miles west from Banting Street to Tidwell, with signs, benches and landscaping, the Talton Street hike-and-bike bridge, and planned neighborhood connections at Forest View, Forest Dale, Hillis, Arvin and Snowden streets, Mosswood Drive and Tidwell Road; it was expected to be complete in summer 2019.
Segments from Tidwell to Wayside and from Wayside to Bretshire, Hirsh and Jensen were awaiting design approval from the Harris County Flood Control District and Union Pacific Railroad when the Parks Board last updated its project page; the record's map line still has gaps. The design firm Clark Condon, in its project portfolio, describes a proposed 6-mile greenway joining existing trails to form a continuous greenway of 12 miles.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston-Port, 12.5 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 63 67 73 79 86 91 93 94 90 82 72 65 Low °F 44 49 54 61 69 75 77 77 72 63 53 46 Precipitation, in 4 2.8 3.8 5.2 5.1 7.9 4.5 3.4 4.5 5.4 3.4 4.3 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Settegast sheet (1:24,000); the 1955 Settegast sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationHalls Bayou Greenway — Houston Parks Board
- RedditSearch Reddit: r/texas
Nearby trails
- Greens Bayou Greenway within 0.2 mi · 3.9 mi, paved
- Hunting Bayou Greenway 2.5 mi away · 5.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Project History Halls Bayou — Houston Parks Board · organization · checked Oct 15, 2026 Supports: bayou length and course to Greens Bayou near Brock Park, 1880s renaming for Archibald S. Hall, parks along the greenway, August 2017 Brock Park to Banting Street segment with boardwalk, signage and gateway, Banting to Tidwell segment of three miles begun August 2017 with features, Talton Street bridge, planned neighborhood connections, summer 2019 completion estimate, Tidwell–Wayside and Wayside–Bretshire/Hirsh–Jensen segments awaiting HCFCD and Union Pacific approvals
- Bayou Greenways — Houston Parks Board · organization · checked Oct 15, 2026 Supports: 150 miles of trails, public-private partnership, Halls among the bayous
- Halls Bayou — Clark Condon · web · checked Oct 15, 2026 Supports: proposed 6-mile greenway connecting to existing trails for a continuous 12-mile greenway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.