Hunting Bayou Greenway
Greenway in Texas
Runs through Houston · Harris County
Conditions now
Loading the weather near Houston…
Forecast by the National Weather Service for Houston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
Hunting Bayou Greenway is a hike-and-bike trail along Hunting Bayou in northeast Houston, built in segments by the nonprofit Houston Parks Board under Bayou Greenways 2020, its partnership with the City of Houston. The bayou runs from northeast Houston east to the Ship Channel, and the greenway is planned to link neighborhoods with Hutcheson, Herman Brown and Mickey Leland Memorial parks. This record maps about 5 miles of trail in two separate pieces.
In Kashmere Gardens, a 1-mile segment from Falls Street to Pickfair Street, funded through TxDOT, opened on July 24, 2018, with a pocket park at Pardee and Leffingwell streets. A half-mile segment from Mickey Leland Memorial Park at Cavalcade Street to Falls Street followed in July 2019, replacing an asphalt trail with 10-foot concrete and adding a pedestrian bridge. A future phase is to continue from Pickfair Street through Hutcheson Park to a planned Kelly Street bikeway. Farther east, work began in 2020 on the segment from Manitou Drive to Maxey Road, which runs through the El Dorado neighborhood, under US 90 inside Herman Brown Park and along Lafferty Oaks Street. In October 2021 the Parks Board announced more than 3.3 miles of it complete, at $9.5 million for land, design and construction with help from the Kinder Foundation, linking Hunting Bayou to Greens Bayou Greenway for the first time.
The trail is 10-foot-wide concrete with signs and seating. A trailhead at Saltillo Street and Mesa Drive has a woodpecker gateway. Widened TxDOT sidewalks on Maxey Road lead to Greens Bayou Greenway, Maxey Park and a Metro park and ride. At the 2021 opening about 0.9 mile between Wallisville Road and Herman Brown Park's existing trails was closed pending construction under US 90, with about 9 miles of trail expected between the two bayous once finished.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston-Port, 5.8 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 63 67 73 79 86 91 93 94 90 82 72 65 Low °F 44 49 54 61 69 75 77 77 72 63 53 46 Precipitation, in 4 2.8 3.8 5.2 5.1 7.9 4.5 3.4 4.5 5.4 3.4 4.3 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Settegast sheet (1:24,000); the 1955 Settegast sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationHouston Parks Board: Hunting Bayou
- RedditSearch Reddit: r/texas
Nearby trails
- Greens Bayou Greenway within 0.2 mi · 3.9 mi, paved
- Buffalo Bayou North Trail 2.4 mi away · 4.8 mi, paved
- Buffalo Bayou South Trail 2.5 mi away · 4.0 mi, paved
- Halls Bayou Greenway Trail 2.5 mi away · 10.6 mi, paved
- White Oak Bayou Greenway 2.6 mi away · 23.5 mi, paved
- Heights Hike & Bike Trail 2.6 mi away · 6.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Hunting Bayou — Houston Parks Board · organization · checked Oct 15, 2026 Supports: bayou from northeast Houston to the Ship Channel; greenway to link neighborhoods with Hutcheson, Herman Brown and Mickey Leland Memorial parks
- Project History Hunting Bayou — Houston Parks Board · organization · checked Oct 15, 2026 Supports: July 24, 2018 Falls Street to Pickfair Street 1-mile segment and Pardee/Leffingwell pocket park; July 2019 Falls Street to Cavalcade Street (Mickey Leland Memorial Park) half mile, asphalt replaced with 10-foot concrete, pedestrian bridge; future phase through Hutcheson Park to Kelly Street bikeway; April 2020 start of Manitou Drive to Maxey Road; signage, trash and recycling bins, seating, woodpecker gateway
- A Celebration for Hunting Bayou Greenway (news release, July 24, 2018) — Houston Parks Board · organization · checked Oct 15, 2026 Supports: TxDOT federal funding of the Falls to Pickfair segment; Bayou Greenways 2020 public-private partnership of Houston Parks Board and the City of Houston
- Houston Parks Board Breaks Ground on New Segment of Hunting Bayou Greenway (press release, June 11, 2020) — Houston Parks Board · organization · checked Oct 15, 2026 Supports: route from Manitou Drive through El Dorado, under US 90 in Herman Brown Park, along Lafferty Oaks Street through Woodshadows II to Maxey Road; Maxey Road sidewalks to Greens Bayou Greenway, Metro park and ride and Maxey Park
- Houston Parks Board Completes Connection of Hunting Bayou Greenway to Greens Bayou Greenway (news release, October 7, 2021) — Houston Parks Board · organization · checked Oct 15, 2026 Supports: more than 3.3 miles of 10-foot concrete trail Manitou Drive to Maxey Road complete; $9.5 million; Kinder Foundation funds; first connection to Greens Bayou; neighborhood connections and Saltillo/Mesa trailhead; TxDOT Maxey Road widened sidewalks; 0.90 mile Wallisville Road to Herman Brown Park closed pending US 90 work; about 9 miles between Hunting and Greens bayous when complete
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.