Hutchinson River Greenway
Greenway in New York · OpenStreetMap relation
Runs through New York and Bronx · Bronx County
Conditions now
Loading the weather near New York…
Forecast by the National Weather Service for New York · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Zerega Avenue mile 0.1 directions to trailhead 1
- Parking at Bronx State Hospital mile 1.6 directions to trailhead 2
(opens in a new tab) About this trail
The Hutchinson River Greenway is a shared-use path in the East Bronx, New York City, that runs beside the Hutchinson River Parkway. It was built by the New York City Department of Parks and Recreation, which completed construction in 2013, according to the city's Department of Transportation. In 2009 the Parks Department announced plans for a greenway of about 2.5 miles along the parkway and the Hutchinson River from Pelham Parkway to the city's northern border with Westchester County, for walking, running, cycling and in-line skating. The work was funded with nearly $5 million from the Croton Mitigation Funds, money granted to Bronx parks in exchange for building the Croton water filtration plant under the Mosholu Golf Course in Van Cortlandt Park.
In 2013 the Bronx Times described the path as linking the southern and northern ends of Pelham Bay Park: a half-mile stretch beside the parkway next to Section 5 of Co-op City leads through an underpass, up a ramp and over a drawbridge into the northern part of the park. Before it opened, cyclists crossing between the two ends of the park used Pelham Parkway toward Shore Road.
At the south end, the Department of Transportation completed a capital reconstruction of the Unionport Bridge with improvements to the greenway in 2025. A Throggs Neck bicycle network plan presented to Community Board 10 in September 2026 names access to the greenway as a gap in the bike network and proposes a two-way, parking-protected bike path on Lafayette Avenue from Brush Avenue to the parkway, with a bike ramp to the off-street connection built under the Unionport Bridge project.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bronx, 2.7 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 43 50 61 72 81 86 84 77 66 54 45 Low °F 27 29 35 44 55 64 71 69 62 51 41 33 Precipitation, in 3.7 3.2 4.4 4 4.1 4.5 4.4 4.8 4.5 4.1 3.5 4.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Harlem sheet (1:62,500); the 1955 Flushing sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Mosholu-Pelham Greenway within 0.2 mi · 5.3 mi, paved
- City Island Greenway 0.4 mi away · 2.4 mi, paved
- Bronx River Greenway 1.5 mi away · 18.8 mi, paved
- Mosholu Parkway Greenway 2.0 mi away · 1.8 mi, paved
- Van Cortlandt Park Greenway 3.4 mi away · 1.3 mi, paved
- Putnam Greenway 3.8 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 3003199, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Throggs Neck Bicycle Network, presented to Bronx Community Board 10 (Sept. 9, 2026) — NYC Department of Transportation · government source · checked Oct 14, 2026 Supports: NYC Parks completed construction of the greenway in 2013; DOT completed Unionport Bridge reconstruction and greenway improvements in 2025; access to the greenway listed as a network gap; proposed Lafayette Avenue two-way protected bike path from Brush Avenue to the Hutchinson River Parkway with a bike ramp to the off-street connection from the Unionport Bridge capital plan
- Parks plan new Hutchinson River Greenway — Bronx Times (Jan. 19, 2009) · press · checked Oct 14, 2026 Supports: Parks Department plan; 2.5 miles from Pelham Parkway to the Westchester border along the river and highway; uses; nearly $5 million in Croton Mitigation Funds and their origin
- New Pel Bay Park bike path — Bronx Times (Apr. 28, 2013) · press · checked Oct 14, 2026 Supports: path linking southern and northern ends of Pelham Bay Park; half-mile stretch by Section 5 of Co-op City; underpass, ramp and drawbridge into Pelham Bay Park North; earlier route via Pelham Parkway toward Shore Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.