States › New York

I-990 Trailway

Rail-trail in New York

Runs through Amherst · Erie County

Conditions now

Loading the weather near University at Buffalo…

Forecast by the National Weather Service for University at Buffalo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.0 mi 1.6 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Ellicott Creek Road mile 0.1 directions to trailhead 1
I-990 Trailway drawn on the 1950 USGS topographic map of Tonawanda East, New York
Then: the 1950 USGS Tonawanda East sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The I-990 Trailway is a short bike and exercise path in the town of Amherst, Erie County, New York, beside Interstate 990. The Town of Amherst's bike map, prepared under the Superintendent of Highways in 2001–02, lists it at 0.9 mile among six town bike and exercise paths totaling 22.81 miles, with the Amherst Canalway Trail, the Ellicott Creek Trailway, the Hopkins Road Boardwalk and Trail, the Inter-Campus Bikeway and the Walton Woods Path.

Interstate 990 is an auxiliary Interstate highway entirely within Amherst. Construction of its section south of Sweet Home Road began in 1980, and that section was open to traffic by 1985. North of Interstate 290 the highway runs along the western edge of the University at Buffalo's Amherst campus, then turns northeast and crosses Ellicott Creek.

The trailway is mapped as a cycle track open to pedestrians near South Ellicott Creek Road, where a parking area is mapped at the trail. This record maps about 1 mile in three pieces.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
N Tonawanda, 6.7 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333644577079838274614938
Low °F171724344555595850403123
Precipitation, in3.22.42.93.63.43.33.53.13.93.93.53.4
Snow, in22.916.113.12.7000000.5618.5
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Tonawanda sheet (1:62,500); the 1950 Tonawanda East sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Bike & Exercise Paths (Amherst Bike Map 2001-2) — Town of Amherst · government source · checked Oct 14, 2026
    Supports: I-990 Trailway, 0.9 miles; six bike and exercise paths totaling 22.81 miles with the Amherst Canalway Trail, Ellicott Creek Trailway, Hopkins Road Boardwalk and Trail, Inter-Campus Bikeway and Walton Woods Path; Superintendent of Highways
  3. Interstate 990 — Wikipedia · organization · checked Oct 14, 2026
    Supports: auxiliary Interstate entirely within the town of Amherst in Erie County; construction south of Sweet Home Road began 1980, open by 1985; north of I-290 runs along the western edge of the University at Buffalo Amherst campus, then turns northeast and crosses Ellicott Creek
  4. I-990 Trailway (way 44393508) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: mapped as highway=cycleway, cycleway=track, foot=yes, named I-990 Trailway
  5. Parking (node 1224131862) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: mapped parking area at the trail near South Ellicott Creek Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.