Peanut Line Trail
Rail-trail in New York · OpenStreetMap relation
Runs through Amherst, Clarence, Clarence Center and Newstead · Erie County
Conditions now
Loading the weather near Clarence Center…
Forecast by the National Weather Service for Clarence Center · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Peanut Line Trail mile 1 directions to trailhead 1
- Parking at Campbell Boulevard mile 1 directions to trailhead 2
- Parking at Millersport Highway mile 1.3 directions to trailhead 3
- Parking mile 4.6 directions to trailhead 4
- Parking mile 4.6 directions to trailhead 5
- Parking mile 4.6 directions to trailhead 6
- Parking mile 4.6 directions to trailhead 7
- Parking mile 4.6 directions to trailhead 8
- Parking at Floss Lane mile 4.7 directions to trailhead 9
- Parking at Floss Lane mile 4.7 directions to trailhead 10
- Parking at Floss Lane mile 4.7 directions to trailhead 11
- Parking at Meadowlakes Park Road mile 5.7 · restrooms · water directions to trailhead 12
- Parking at Meadowlakes Park Road mile 5.7 · restrooms · water directions to trailhead 13
- Parking at Clarence Center Road mile 6.4 directions to trailhead 14
- Town of Clarence Bike Path mile 6.9 directions to Town of Clarence Bike Path
- Town of Clarence Bike Path mile 7.7 · restrooms · water directions to Town of Clarence Bike Path
- Parking at Railroad Street mile 7.7 · restrooms · water directions to trailhead 17
- Parking at Railroad Street mile 7.7 · restrooms · water directions to trailhead 18
- Parking at Kraus Road mile 8.7 · restrooms · water directions to trailhead 19
- Parking mile 8.8 · restrooms · water directions to trailhead 20
- Parking mile 8.8 · restrooms · water directions to trailhead 21
- Parking mile 8.9 directions to trailhead 22
- Parking mile 8.9 directions to trailhead 23
- Parking mile 9 directions to trailhead 24
- Parking at Clarence Center Road mile 11.5 directions to trailhead 25
About this trail
The Peanut Line Trail follows the former Batavia Branch of the New York Central Railroad east from Amherst through Clarence toward Akron in Erie County, New York; 12.8 miles are mapped here, including the unbuilt Amherst corridor. According to the Town of Amherst, the branch began operating in 1853 between Canandaigua and Niagara Falls and became known as the "Peanut Line" in the late 1800s after company vice-president Dean Richmond called it "only a peanut of a line." The Town of Amherst bought its part of the corridor in 1964.
In Clarence the town's Peanut Line Trail runs about 7.5 miles from Transit Road to the Newstead town line, with benches and mile markers, and passes Meadowlakes Park and Memorial Park; a connector path branches off between about Heise Road and Roll Road through the Waterford subdivision. Clarence has paved its section, and at the Newstead line the trail joins Newstead trails that lead into the Village of Akron, forming part of the network known as Clarence Pathways. Snowmobiles are allowed in winter between Goodrich Road and Salt Road.
West of Transit Road the Amherst corridor has not been developed: the town describes it as unused open space mowed periodically along the centerline. TrailLink lists it as an unpaved dirt and grass path of 5.2 miles from North Forest Road at Dodge Road to Transit Road, with no designated parking and an unbridged creek crossing near East Pinelake Drive. In February 2026 the Town of Amherst presented a proposed 4.9-mile paved multi-use path from the Ellicott Creek Trailway at North Forest Road to Transit Road, following a 2025 feasibility study by GObike Buffalo for the Greater Buffalo Niagara Regional Transportation Council. The plan calls for a new bridge near East Pine Lake Drive and a state Transportation Alternatives Program grant application due March 12, 2026, with awards expected in late 2026 and design to start in September 2027.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
NYC Tonawanda Branch and Transit Road Running Track (Penn Central Transportation Co. / Conrail). From New York Abandoned Rail Lines (NYS OPRHP, 2020).
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Buffalo, 9.8 km from the trail's middle, 24 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 33 42 55 67 76 80 79 72 60 48 37 Low °F 19 20 26 36 48 58 63 62 54 44 34 26 Precipitation, in 3.4 2.5 2.9 3.4 3.4 3.4 3.2 3.2 4.1 4 3.5 3.8 Snow, in 26.7 18.1 14.1 2.5 0 0 0 0 0 0.9 7.8 25.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1897 Lockport sheet (1:62,500); the 1950 Clarence Center sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Dec 2024 to Oct 2025
- Clarence bike path today r/Buffalo · Oct 2025 · 7 comments
- Weekly development round up - 12.12.24 r/Buffalo · Dec 2024 · 6 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesBike Path Information — Town of Clarence
- RedditSearch Reddit: r/newyork
Nearby trails
- Hopkins Road Boardwalk and Trail within 0.2 mi · 2.0 mi, paved
- Town of Newstead Bike Path 0.2 mi away · 4.4 mi, paved
- Ellicott Creek Trailway 0.3 mi away · 7.6 mi, paved
- Akron Bike Path (Peanut Line) 0.5 mi away · 1.5 mi, surface unknown
- I-990 Trailway 0.6 mi away · 1.0 mi, surface unknown
- West Shore Trail (Clarence) 1.7 mi away · 3.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9766967, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- "Peanut Line" Multi-Use Trail Project, open house presentation — Town of Amherst · government source · checked Oct 14, 2026 Supports: Batavia Branch of the New York Central from 1853 between Canandaigua and Niagara Falls, Peanut Line name and Dean Richmond quote, Town of Amherst purchase in 1964, Amherst corridor unused open space mowed along the centerline, Clarence has paved its section, proposed 4.9-mile paved path from Ellicott Creek Trailway and North Forest Road to Transit Road, 2025 GObike feasibility study for GBNRTC, new bridge needed near East Pine Lake Drive, TAP grant application due March 12, 2026, awards November/December 2026, design September 2027
- Bike Path Information — Town of Clarence · government source · checked Oct 14, 2026 Supports: Clarence Peanut Line Trail about 7.5 miles from Transit Road to the Newstead town line, benches and mile markers, access to Meadowlakes Park and Memorial Park, connector path from about Heise Road to Roll Road through the Waterford subdivision, connection to Newstead trails leading into the Village of Akron
- Clarence Pathways — TrailLink · web · checked Oct 14, 2026 Supports: Clarence Pathways network name, winter snowmobiling on the Peanut Line Trail between Goodrich Road and Salt Road
- Peanut Line Trail (Amherst) — TrailLink · web · checked Oct 14, 2026 Supports: Amherst segment 5.2 miles from N Forest Rd & Dodge Rd to Transit Rd, dirt and grass surface, no designated parking, creek crossing without a bridge near E Pinelake
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.